Problem-1
System or Network Available Loading Capacity on System or Path Area-1 to
Path Response (%) Limiting Facility (ALC), MW ATC, MW Area-4 ATC
Area-1 5 70 1400
Area-2 10 200 2000
Area-3 14 130 928.6
Area-4 11 175 1590.9
Tie 1-2 20 400 2000 928.6 MW
Tie 1-3 80 1200 1500
Tie 2-3 15 250 1666.67
Tie 2-4 10 200 2000
Tie 3-4 90 900 1000
Problem-2
i) Sudden decrease of 100 MW load in Area-A when the system is on primary regulation:
Area-A: D1 = 1%, R1 = 6%
0.01× 3400 MW 3700 MW
D1 = = 56.67 MW 1 = = 1027.78 MW
0.01× 60 Hz Hz R1 0.06 × 60 Hz Hz
Area-B: D2 = 1.5%, R2 = 5%
0.015 × 6000 MW 7500 MW
D2 = = 150 MW 1 = = 2500 MW
0.01 × 60 Hz Hz R2 0.05 × 60 Hz Hz
Steady state frequency deviation after the loss of load is given by:
− ∆PL − (− 100MW )
∆f ss = = = 0.0268Hz
β 3734.45 MW
Hz
Steady state generation and load changes in each area are as follows:
∆PG1 = −
1
R1
(
∆f = − 1027.78 MW
Hz
)
⋅ (0.0268Hz ) = −27.54MW
1
Area-A Area-B
Generation 3000 – 27.54 = 2972.46 MW 6500 – 67 = 6433 MW
Load 3500 – 100 + 1.52 = 3401.52 MW 6000 – 4.02 = 5995.98 MW
Tie Line Flow 429.06 MW from B to A
Frequency 60.0268 Hz
ii) Both areas will regulate their Area Control Errors to zero, and there will be no deviations in
frequency or tie-line power flows.
Problem-3:
a. Scheduled interchanges:
Area-1 to Area-2: 400 MW
Area-1 to Area-3: 300 MW
b.
β, MW/Hz β1 = D1 +
1
= 2141.67 β 2 = D2 +
1
= 3042.22 β 3 = D3 +
1
= 2328.89
R1 R2 R3
Steady state frequency error following a 500 MW load interruption, system only on primary regulation:
−∆PL −(−500MW )
∆f ss = = = +0.06655Hz
β I + β 2 + β3 (2141.67 + 3042.22 + 2328.89)MW / Hz
2
Problem-4:
We are given that:
CPROBOld(50 MW or More on Outage) = 0.00048
CPROBOld(150 MW or More on Outage) = 0.00037
CPROBOld(250 MW or More on Outage) = 0.00025
CPROB New (50) = CPROB Old (50) ⋅ (1 − FOR) + CPROB Old (50 − 100) ⋅ FOR
= (0.00048) ⋅ (0.9) + (1) ⋅ 0.1 = 0.100432
CPROB New (150 ) = CPROB Old (150 ) ⋅ (1 − FOR) + CPROB Old (150 − 100) ⋅ FOR
= (0.00037) ⋅ (0.9) + (0.00048) ⋅ 0.1 = 0.000381
CPROB New (250) = CPROB Old (250) ⋅ (1 − FOR) + CPROB Old (250 − 100) ⋅ FOR
= (0.00025) ⋅ (0.9) + (0.00037) ⋅ 0.1 = 0.000262
b) It can be expected that the load will not be served for 500*0.000262 or 0.131 hours, out of the 500
hours of peak load.
3
Problem-5:
CPROB New ( X ) = CPROB Old ( X ) ⋅ (1 − FOR ) + CPROB Old ( X − C ) ⋅ FOR
CPROB(− ve number ) = CPROB(0) = 1