0% found this document useful (0 votes)
57 views3 pages

Attachment-6: 2306-P1-A 2306-P1-B

This document discusses two slot tank pumps, models 2306-P1-A and 2306-P1-B. It notes that the soil above the foundation needs cleaning and that there are visible cracks on the top surface of the foundation that must be chipped off so plastering can be done.

Uploaded by

nsureshbabu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views3 pages

Attachment-6: 2306-P1-A 2306-P1-B

This document discusses two slot tank pumps, models 2306-P1-A and 2306-P1-B. It notes that the soil above the foundation needs cleaning and that there are visible cracks on the top surface of the foundation that must be chipped off so plastering can be done.

Uploaded by

nsureshbabu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Attachment-6

Slot Tank Pumps

2306-P1-A 2306-P1-B
Soil above Foundation
need to be cleaned

2306-P1-B

2306-P1-A
Visible cracks on top surface of
foundation.
It must be chipped off and
Plastering must be done.

You might also like