STRUCTURE STATUS IN M.O.
L AREA
ERECTION BALANCE ITEM WELDING STATUS BALANCE WELDING
REMARKS
TOTAL COMP. COMP BALAN FINISH COMP. COMP BALAN START
SL NO AREA ITEM QTY QTY % CE QTY START DATE DATE QTY % CE QTY DATE [Link]
Under
TIE-BEAM 285 276 96.842 9 Progress 18.08.2012 270 94.7368 15 19.08.2012 05.09.2012
VERTICAL
BRACING 113 COMPLETED
DRUM
1 SLAKER HORIZENTAL
BUILDING BRACING 11 7 63.636 4 20.08.2012 25.08.2012 7 63.6364 4 26.08.2012 27.08.2012
PLATEFORM &
HANDRAILING 1 COMPLETED
Under
FLOOR BEAM 175 160 91.429 15 Progress 26.08.2012 150 85.7143 25 U/P 30.08.2012
VERTICAL
BRACING 87 0 0 87 15.08.2012 05.09.2012 0 0 87 06.09.2012 25.09.2012
ROOF TRUSS 4 COMPLETED
CRUSHER
2 HOUSE
BUILDING PURLIN 30 20 66.667 10 17.08.2012 07.09.2012 16 80 14 08.09.2012 05.10.2012
HORIZENTAL
BRACING 6 0 0 6 18.08.2012 30.08.2012 0 6 30.08.2012 12.09.2012
MONRAIL
BEAM 1 0 0 1 26.08.2012 08.09.2012 0 1 08.09.2012 15.09.2012
PLATEFORM &
HANDRAILING 2 COMPLETED
Under
FLOOR BEAM 485 440 90.722 45 Progress 25.08.2012 300 61.8557 185 25.08.2012 18.10.2012
VERTICAL
BRACING 365 330 90.411 35 27.08.2012 07.09.2012 325 89.0411 40 09.09.2012 20.10.2012
HORIZENTAL
BRACING 78 66 84.615 12 22.08.2012 26.08.2012 66 84.6154 12 23.09.2012 10.10.2012
MONRAIL Under
BEAM 1 0 0 1 Progress 30.08.2012 0 0 1 05.09.2012 10.10.2012
ROOF TRUSS 6 COMPLETED
LIME SILO PURLIN &
3
BUILDING RUNNER 129 20 15.504 109 16.08.2012 30.08.2012 20 15.5039 109 14.09.2012 30.09.2012
4th & 5 th Under
COURSE CONE 2 1 50 1 Progress 12.08.2012 1 50 1 23.08.2012 10.09.2012
PLATEFORM &
HANDRAILING 9 2 22.222 7 18.08.2012 07.09.2012 1 11.1111 8 20.09.2012 20.10.2012
STAIRCASE TIE-
BEAM 165 150 90.909 15 16.09.2012 28.09.2012 150 90.9091 15 29.09.2012 31.10.2012
BRACING 127 110 86.614 17 19.09.2012 22.09.2012 110 86.6142 17 22.09.2012 25.10.2012
STRAINGER 14 10 71.429 4 13.09.2012 25.09.2012 14 100 10 26.09.2012 20.10.2012
Under
TIE-BEAM 96 85 88.542 11 Progress 26.08.2012 45 46.875 51 27.08.2012 17.09.2012
ROOF TRUSS 6 5 83.333 1 10.08.2012 28.08.2012 2 33.3333 4 29.08.2012 22.09.2012
BRACING 110 90 81.818 20 16.08.2012 18.08.2012 70 63.6364 40 18.08.2012 23.09.2012
4 DE-BAGGING
CONVEYOR PURLIN 40 16 40 24 19.08.2012 30.08.2012 10 25 30 21.08.2012 10.09.2012
CLADDING 36 0 0 36 21.08.2012 25.08.2012 0 0 36 01.09.2012 05.10.2012
PLATEFORM &
HANDRAILING 1 0 0 1 26.08.2012 30.08.2012 0 0 1 06.09.2012 25.09.2012
SAG ROD in
Mtrs 66 0 0 66 02.09.2012 04.09.2012 0 0 66 11.09.2012 14.09.2012
TIE-BEAM 76 COMPLETED
VERTICAL
BRACING 9 5 55.556 4 15.08.2012 17.08.2012 5 55.5556 4 18.08.2012 19.08.2012
HORIZENTAL
BRACING 23 16 69.565 7 18.08.2012 20.08.2012 16 69.5652 7 20.08.2012 22.08.2012
WET
5 SCRUBBER
PLATEFORM ROOF TRUSS 5 COMPLETED
PURLIN 19 COMPLETED
PLATEFORM &
HANDRAILING 1 COMPLETED
SAG ROD in
Mtrs 32 0 0 32 04.09.2012 05.09.2012 0 0 32 06.09.2012 07.09.2012
STACK STRUCTUR 4 0 0 4 06.08.2012 19.08.2012 0 0 4 20.08.2012 15.09.2012
STACK SHELL 2 0 0 2 06.08.2012 25.08.2012 0 0 2 30.08.2012 20.09.2012
6 STACK
STACK
PLATEFORM 1 0 0 1 06.08.2012 20.08.2012 0 0 1 21.08.2012 15.09.2012
STACK CONE 2 COMPLETED
FLOOR BEAM 9 COMPLETED 4 44.4444 5 09.08.2012 12.08.2012
AGITATER
SUPPORT 1 COMPLETED
GRIT MILL
MENTANCE PLATEFORM &
7 PLATEFORM HANDRAILING 1 0 0 1 15.08.2012 18.08.2012 0 0 1 01.09.2012 30.09.2012
STRUCTURE STATUS OF HUD HUD
ERECTION BALANCE ITEM
TOTAL COMP. COMP BALAN
SL NO AREA ITEM QTY QTY % CE QTY START DATE
TIE-BEAM
ROOF TRUSS
BRACING
1 BAGGING
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
LADDERS
2 WHARFF
PLATEFORM &
HANDRAILING
ROOF TRUSS
3 WHARFF
TIE-BEAM
ROOF TRUSS
BRACING
4 WHARFF
4 WHARFF
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
STRUCTURE WORK
5 BAGGING
ALUMINIUM
SHEETING
TIE-BEAM
ROOF TRUSS
BRACING
6 RMH
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
LADDERS
7 COMPLEX PLATEFORM &
HANDRAILING
BLASTING
8 WHARFF
PAINTING
INSPECTION
OLD BELT REMOVAL
9 WHARFF
NEW BELT JOINING
INSPECTION
TIE-BEAM
ROOF TRUSS
BRACING
1 BAGGING
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
OLD BELT REMOVAL
9 BAGGING
NEW BELT JOINING
INSPECTION
TIE-BEAM
ROOF TRUSS
BRACING
10 COMPLEX
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
US OF HUD HUD WORKS
BALANCE ITEM WELDING STATUS BALANCE WELDING
REMARKS
FINISH COMP. COMP BALAN START
DATE QTY % CE QTY DATE [Link]
HUD HUD JOBS STATUS UPDATION (MECHANICAL)
[Link] Plant Description of activity Contractor Tonnage Sart date Target date MTRL PR STATUS Status /Remarks
1 JD 1441 Conveyor structure Replacement Devi Fabrications 12 MT 25-Jul-15 [Link]: -PR CREATED . 2. Material has transfered to site ,work in progress
Bagging (kiran-
9347115668)
2 4 MT 15-Jul-15 [Link] to be raised for Al sheets. [Link] Roof sheets -150No's.
Sri Chandra [Link] PR has been raised for Angles [Link] ring Platform support angles has to be
Wharf Old silo Ladders & Damaged Platforms Replcement
(RK- 9948521448) changed .
3 Diyva Engg 13 MT 20-Jun 10-Jul-15 [Link] dismantling work [Link] planned
Wharf New silo structure & roof replacement ( venkatesh-
9848069755)
4 JD 1304/1330 Conveyor structure repairs/renewal 8 MT 15-Jul-15 PR to be raised Material to be received
Wharf
5 Bagging Hot air duct damaged portion renewal JP consruction 8 MT 10-Jul-15 PR to be raised Aluminium sheets required
6 JD 1306 Conveyor structure replacement 47 MT 31-Jul-15 work has to [Link] shifted to yard.
RMH VK Engg
7 C-tr'S TGS Damaged Platform & structure replacement 2 MT 20-Jun 30-Jun PR raised Ladder work in progress .
Complex Divya Engg
8 Wharf JD 1330 Conveyor structure Painting DV Ramana &sons Mar-15 31-Jul-15 Cherry picker needed for job for JD1330 conveyor
9 JD 1330 Conveyor belt Repalcement 200 mtrs 31-Jul-15 200 mtr belts received [Link] replacement will be done only after finishing JD
Wharf 1330 structural work
10 JD 1456 Conveyor structure replacement 12 MT 31-Jul-15 PR to be raised OFFERS TO BE RECEIVED
Bagging
11 JD 1456 Conveyor Belt replacement 31-Aug-15 PO NO.80386253 (19-06-15) Expected delivery date (03-08-15)
Bagging
12 JD 1315A Conveyor Damaged structure replacement 30-Jun-15 PR to be raised OFFERS TO BE RECEIVED
Complex
13 IAT , FAT, DT Tower Gratings Replacement PR to be raised Mtrl requirment to be prepaired.
SAP-1
Old conveyor structure ,Deck plates, frames & rollers removal
new structure channels , deck plates, and angles drawn from stores
cutting & fabrication shifting for sand blasting & painting
erection of channels at site and vertical angles welding & deck plates
frames fixing , rollers fixing , complete bolting & welding
dismantaling ,fabrication & renewal of head drum structure ,drive
snub base supported structure
house keeping under contractor area