PG 27-07-2016

This document is the cover sheet for an FMEA (Failure Mode and Effects Analysis) report from WTNSO for the assembly process. It lists the report number, date, team members involved in the analysis from various departments including quality assurance, engineering, production, and training. It also lists previous updates made to corrective actions for non-conformance reports against various part numbers. The original file is stored on the company network drive. The cover sheet is signed by the FMEA moderator, technical approval, and quality realization approval.

Uploaded by

trian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
184 views1 page

PG 27-07-2016

This document is the cover sheet for an FMEA (Failure Mode and Effects Analysis) report from WTNSO for the assembly process. It lists the report number, date, team members involved in the analysis from various departments including quality assurance, engineering, production, and training. It also lists previous updates made to corrective actions for non-conformance reports against various part numbers. The original file is stored on the company network drive. The cover sheet is signed by the FMEA moderator, technical approval, and quality realization approval.

Uploaded by

trian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Cover Sheet FMEA Number: WTNSO SI 2016 004

Failure Mode and Effects Analysis FMEA Pages: 31


Edition Number: 1
Update: 27/07/2016

ASSURANCE QUALITÉ
Distributor: Process: Montage/ C4.4.1/ Indices de modifications technique sous l'adresse suivante:
Mastouri Med Kamel_QM \\natn4001\infos\Boite_EngineeringSI\Modulliste\Modulliste.xlsx
El Ghali Mehdi_Engineering Product: FMEA-P-SI_TRW-WTNSO-Montage-Assembly-FR-EN-2016_06_21
Tamada Nabil_Process Engineering
ELLEUCH Mourad_FMEA Area of production: SI_TRW
Amairia Abderrazek_Technical Plant: WTNSO
Ben Jha Idriss_Production
Initial state of 16/11/2015:
Belaid, Jihene_Training
16/11/2015 : revision of corrective action for NCR 3009 PN - 34185100 B
10/12/2015 : revision of corrective action for NCR 3069 PN - 34185099B
31/12/2015 : revision of corrective action for NCR 3121 PN 34220159B
08/01/2016 : revision of corrective action for NCR 3128 PN 34185098B
19/02/2016 : revision of corrective action for NCR 3173 PN 34185099B
07/04/2016 : revision of corrective action for NCR 3291 PN 34220159C
10/05/2016 : revision of corrective action for NCR 3363 PN - 34195763B
15/07/2016 : revision of corrective action for NCR 3520 PN 34185097 F
15/07/2016 : revision of corrective action for NCR 3510 PN 34217662A
18/07/2016 : revision of corrective action for QCCAR 764199 34195763B
Original File: 27/07/2016 : revision of corrective action for QCCAR 756699 PN 34220159D
Z:\IQ-FMEA\003- FMEA & QM Plan PS SI\003-Data
SI_TRW

Work Group:
Ghezel Naoufel_QM;
Graa Naziha_Engineering;
Najeh Hamdi _Training;
Ben jha Idriss _Production; ;
Hmissa Bessem_PT;
Mohamed Draba_TD;
Houssine, Aloui_IE
Trimech Raouf_FMEA

1 page(s) suivante(s)
Build Approval Realization
Moderator Responsible Head of Depart-
Name: Trimech Raouf Dept.: Engineering Dept.: Technical Dept.: Quality ment:
Dept.: FMEA Date: 21/06/2016 Date: 21/06/2016 Date: 21/06/2016
Dept: Production
Date: 21/06/2016 Signature: Signature: Signature: