0% found this document useful (0 votes)
348 views1 page

Have You Checked Your Name in The Voters List!?: Meter Readings For Meter ID 0232405832

This electricity bill summary contains the following information: 1) The billing period is from January 13, 2019 to February 13, 2019 for customer M. Channabappa. 2) Electricity consumption during this period was 111 KWH with a net payable amount of Rs. 632. 3) The due date for payment is February 27, 2019 and disconnection may occur after March 14, 2019 if unpaid.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
348 views1 page

Have You Checked Your Name in The Voters List!?: Meter Readings For Meter ID 0232405832

This electricity bill summary contains the following information: 1) The billing period is from January 13, 2019 to February 13, 2019 for customer M. Channabappa. 2) Electricity consumption during this period was 111 KWH with a net payable amount of Rs. 632. 3) The due date for payment is February 27, 2019 and disconnection may occur after March 14, 2019 if unpaid.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Office of the Asst. Executive Engineer (Ele.

), C, O&M Sub-division - DAVANAGERE URBAN SUB DIVISION 1


RR No. Account ID Bill No. Billing Period Bill Date Due Date Disconnection Date
(68271) 0232405000 023240895967 13-01-2019 - 13-02-2019 13-02-2019 27-02-2019 14-03-2019
Name & Address: Type Domestic - LT2A
M.CHANNABAPPA Tariff 1LT2A1-N
Sanctioned load (KW)
S/O MALLAPPBSPP#3226 1.00
11TH MAIN 3RD MAIN B
Sanctioned load (HP)
BLOCD
DVG, KAR -577001
Meter Readings for Meter ID 0232405832

Description Date KWH Meter KVAH Meter MD meter PF

Present Reading 13-02-2019 4341

Previous Reading 13-01-2019 4230

Difference 111 0

Meter Constant 1

Consumption 111 0 0

Less/Add:
0
Consumption

Net Consumption 111

Your Detailed Bill


Description Amount (Rs.)
Fixed charges: For the First 1.00 KW at Rs50.00 per kW 50.00
Energy Charges : For the first 30.000 KWH at Rs3.50 per KWH 105.00
Energy Charges : For the next 70.000 KWH at Rs4.95 per KWH 346.50
Energy Charges : For the next 11.000 KWH at Rs6.50 per KWH 71.50
Fuel Cost Adjustment Charges : 111.000 KWH at Rs0.11 per KWH 12.21
Interest on Revenue 0.00
Interest on Tax 0.00
Tax 47.07
Current Bill Amount 632.28
Arrears 0.00
Bill Correction 0.00
Bill rounding adjustment -0.28
Net Payable Amount 632.00
Rupees Six Hundred Thirty-Two Only
Sd/-
Assistant Executive Engineer (Ele.)

HAVE YOU CHECKED YOUR NAME IN THE VOTERS LIST!?

Office of the Asst. Executive Engineer (Ele.), C, O&M Sub-division - DAVANAGERE URBAN SUB DIVISION 1
RR No. Billing Period Due Date Disconnection Bill No. Account ID Amount
Date Payable
(68271) 13-01-2019 - 13-02-2019 27-02-2019 14-03-2019 023240895967 0232405000 Rs. 632.00
Name of the Bank Branch Cheque/DD No. Cheque/DD Date Amount (Rs.) Amount in Rupees

Receipt No. Date Cashier Signature

*0232405000*

You might also like