Bill of Quantities & Cost Estimate:: Supply, Installation, Testing and Commissioning of Passenger Elevator

The document summarizes a project to supply, install, test, and commission a 800kg passenger elevator at a location in Quezon City. The approved budget for the project is 5.7 million Philippine pesos from the MISTDF fund. The project duration is 120 calendar days. The bill of quantities includes items for the elevator unit itself, foundation work, safety signages, installation, testing, permits, electrical work, and more. Cost estimates are provided for materials, labor, equipment rental, indirect costs, and the grand total project cost.

Uploaded by

Trix SD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
571 views

Bill of Quantities & Cost Estimate:: Supply, Installation, Testing and Commissioning of Passenger Elevator

The document summarizes a project to supply, install, test, and commission a 800kg passenger elevator at a location in Quezon City. The approved budget for the project is 5.7 million Philippine pesos from the MISTDF fund. The project duration is 120 calendar days. The bill of quantities includes items for the elevator unit itself, foundation work, safety signages, installation, testing, permits, electrical work, and more. Cost estimates are provided for materials, labor, equipment rental, indirect costs, and the grand total project cost.

Uploaded by

Trix SD
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Title : SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF PASSENGER ELEVATOR

Location :Visayas Avenue, Diliman, Quezon City


: Five Million Seven Hundred Three Thousand Pesos Only
Approved Budget Cost (PhP 5,703,000.00)
Source of Fund : MISTDF
Project Duration : 120 Calendar days
BILL OF QUANTITIES & COST ESTIMATE

ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL


800kg passenger elevator
1 Unit
[See specification]
Lifting hooks foundation, Plastering and
Grouting, Safety signages, Installation,
1 lot
Testing and Commissioning, Mechanical
Permit and Permit to operate
Electrical wires, Conduits, Circuit
Breakers, Lifting hooks, Weather Proof 1 lot
louver, Exhaust fan, etc.
MATERIAL COSTS:
LABOR COSTS (25%):
EQUIPMENT RENTAL (3%):

SUMMARY

DIRECT COSTS :
MATERIAL COSTS: -
LABOR COSTS: -
EQUIPMENT RENTAL: -
ESTIMATED DIRECT COST (EDC): -
INDIRECT COSTS:
OCM ( 9% of EDC): -
CONTRACTOR'S PROFIT ( 8% of EDC): -
VAT ( 12% of EDC, OCM, & PROFIT: -
ESTIMATED INDIRECT COST (EDC): -

GRAND TOTAL -
To Estimate Say: PhP. 0.00