0% found this document useful (0 votes)
476 views13 pages

0.daftar Isi Asbuilt Drawing Okk

This document provides a list of drawings related to track, civil, and bridge works. It includes drawings for track layout and longitudinal sections, box culverts, retaining walls, and bridge structures. The drawings cover various locations from km 106+300 to km 108+600 and include plans, details, and construction drawings.

Uploaded by

Rachmad Mularso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
476 views13 pages

0.daftar Isi Asbuilt Drawing Okk

This document provides a list of drawings related to track, civil, and bridge works. It includes drawings for track layout and longitudinal sections, box culverts, retaining walls, and bridge structures. The drawings cover various locations from km 106+300 to km 108+600 and include plans, details, and construction drawings.

Uploaded by

Rachmad Mularso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN

NOMOR GAMBAR ISI GAMBAR NOMOR GAMBAR


2-TR 000-A DAFTAR GAMBAR 2.1.3 SALURAN
2-TR 000-B PETA LOKASI PROYEK 2-UD 001
2-TR 000-C LEGENDA 2-UD 002
2-UD 003
1. UMUM RENCANA LETAK TRACK DAN POTONGAN MEMANJANG 2-UD 004
2-TR 001 RENCANA LETAK TRACK KM 106+300 - 106+900
2-TR 002 RENCANA LETAK TRACK KM 106+900 - 107+500 2.1.4 RETAINING WALL TUBUH BAAN
2-TR 003 RENCANA LETAK TRACK KM 107+500 - 108+100 2-RW 001
2-TR 004 RENCANA LETAK TRACK KM 108+100 - 108+600 2-RW 002
1.2 TRACK ARRAGEMENT 2-RW 003
2-TR 001 TRACK ARRAGEMENT KM.106+300 - 106+900
2-TR 002 TRACK ARRAGEMENT KM.106+900 - 107+500 2.2 BOX CULVERT
2-TR 003 TRACK ARRAGEMENT KM.107+500 - 108+100 2.2 BOX CULVERT 2x2
2-TR 004 TRACK ARRAGEMENT KM 108+100 - 108+600 2.2.1 BOX CULVERT 2 X 2
2-BC 001
2. PEKERJAAN SIPIL 2-BC 002
2.1 BADAN JALAN KA 2-BC 003
2.1.1 POTONGAN MELINTANG 2-BC 004
2-PM 001 POTONGAN MELINTANG KM 106+300 - 106+400 2-BC 005
2-PM 002 POTONGAN MELINTANGKM 106+450 - 106+550
2-PM 003 POTONGAN MELINTANGKM 106+600 - 106+700 2.2.2 BOX CULVERT 2 X 2
2-PM 004 POTONGAN MELINTANG KM 106+750 - 106+850 2-BC 001
2-PM 005 POTONGAN MELINTANG KM 106+900 - 107+000 2-BC 002
2-PM 006 POTONGAN MELINTANG KM 107+050 - 107+150 2-BC 003
2-PM 007 POTONGAN MELINTANG KM 107+200 - 107+300 2-BC 004
2-PM 008 POTONGAN MELINTANG KM 107+350 - 107+450 2-BC 005
2-PM 009 POTONGAN MELINTANGKM 107+500 - 107+600
2-PM 010 POTONGAN MELINTANG KM 107+650 - 107+750 2.2.3 BOX CULVERT 2 X 2
2-PM 011 POTONGAN MELINTANG KM 107+800 - 107+900 2-BC 001
2-PM 012 POTONGAN MELINTANG KM 107+950 - 108+050 2-BC 002
2-PM 013 POTONGAN MELINTANG KM 108+100 - 108+200 2-BC 003
2-PM 014 POTONGAN MELINTANG KM 108+250 - 108+350 2-BC 004
2-PM 015 POTONGAN MELINTANG KM 108+400 - 108+500 2-BC 005
2-PM 016 POTONGAN MELINTANG KM 108+550 - 108+600
2-PM 017 LAYOUT DAN TABEL PERBAIKAN TANAH 2.2.4 BOX CULVERT 2 X 2
2-BC 001
2.1.2 GEBALAN RUMPUT DAN DETAIL 2-BC 002
DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN
2-GR 001 LAYOUT GEBALAN RUMPUT 2-BC 003
2-GR 002 DETAIL GEBALAN RUMPUT 2-BC 004
2-BC 005

2.2.5 BOX CULVERT 2 X 2


2-BC 001
2-BC 002
2-BC 003
2-BC 004
2-BC 005
DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN

NOMOR GAMBAR ISI GAMBAR NOMOR GAMBAR

2.2.6 BOX CULVERT 2 X 2 KM 107+625 2.2.11 BOX CULVERT (UNDERPASS 3 X 3)


2-BC 001 RENCANA BOX CULVERT 2 X 2 2-BC 001
2-BC 002 DETAIL SAYAP BOX CULVERT 2 X 2 2-BC 002
2-BC 003 PEMBESIAN BOX CULVERT 2 X 2 2-BC 003
2-BC 004 PEMBESIAN PARAPET BOX CULVERT 2 X 2 2-BC 004
2-BC 005 PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2 2-BC 005
2-BC 006
2.2.7 BOX CULVERT 2 X 2 KM 107+942,63
2-BC 001 RENCANA BOX CULVERT 2 X 2 2.2.12 BOX CULVERT (UNDERPASS 3 X 3)
2-BC 002 DETAIL SAYAP BOX CULVERT 2 X 2 2-BC 001
2-BC 003 PEMBESIAN BOX CULVERT 2 X 2 2-BC 002
2-BC 004 PEMBESIAN PARAPET BOX CULVERT 2 X 2 2-BC 003
2-BC 005 PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2 2-BC 004
2-BC 005
2.2.8 BOX CULVERT 2 X 2 KM 108+015,57 2-BC 006
2-BC 001 RENCANA BOX CULVERT 2 X 2
2-BC 002 DETAIL SAYAP BOX CULVERT 2 X 2 2.2.13 BOX CULVERT (UNDERPASS 5 X 3.5)
2-BC 003 PEMBESIAN BOX CULVERT 2 X 2 2-BC 001
2-BC 004 PEMBESIAN PARAPET BOX CULVERT 2 X 2 2-BC 002
2-BC 005 PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2 2-BC 003
2-BC 004
2.2.9 BOX CULVERT 2 X 2 KM 108+430 2-BC 005
2-BC 001 RENCANA BOX CULVERT 2 X 2 2-BC 006
2-BC 002 DETAIL SAYAP BOX CULVERT 2 X 2
2-BC 003 PEMBESIAN BOX CULVERT 2 X 2
2-BC 004 PEMBESIAN PARAPET BOX CULVERT 2 X 2
2-BC 005 PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2

2.2.10 BOX CULVERT 5 X 3 X 2 KM 106+440


2-BC 001 RENCANA BOX CULVERT 5 X 3 X 2
2-BC 002 DETAIL SAYAP BOX CULVERT 5 X 3 X 2
2-BC 003 PEMBESIAN BOX CULVERT 5 X 3 X 2
2-BC 004 PEMBESIAN PARAPET BOX CULVERT 5 X 3 X 2
2-BC 005 PEMBESIAN DINDING SAYAP BOX CULVERT 5 X 3 X 2
DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN
BATAN DAFTAR GAMBAR PEKERJAAN TRACK, SIP
ISI GAMBAR NOMOR GAMBAR
3. PEKERJAAN JEMBATAN JB 32 , (32+32)
U-DITCH 3.1 BANGUNAN BAWAH
CROSS & LONG DRAIN 2-JB 001
DETAIL CROSS & LONG DRAIN 2-JB 002
PEMBESIAN MANHOLE 2-JB 003
2-JB 004
2-JB 005
RETAINING WALL TUBUH BAAN 2-JB 006
RETAINING WALL TUBUH BAAN 2-JB 007
RETAINING WALL TUBUH BAAN 2-JB 008
2-JB 009
2-JB 010
2-JB 011
KM 106+300 2-JB 012
BOX CULVERT 2 X 2 2-JB 013
DETAIL SAYAP BOX CULVERT 2 X 2 2-JB 014
PEMBESIAN BOX CULVERT 2 X 2 2-JB 015
PENULANGAN PARAPET BOX CULVERT 2 X 2 2-JB 016
PENULANGAN RETAINING WALL BOX CULVERT 2 X 2 2-JB 017
2-JB 018
KM 106+575 3.2 BANGUNAN ATAS ( I GIRDER )
RENCANA BOX CULVERT 2 X 2 2-JB 019
DETAIL SAYAP BOX CULVERT 2 X 2 2-JB 020
PEMBESIAN BOX CULVERT 2 X 2 2-JB 021
PEMBESIAN PARAPET BOX CULVERT 2 X 2 2-JB 022
PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2 2-JB 023
2-JB 024
KM 106+825
RENCANA BOX CULVERT 2 X 2
DETAIL SAYAP BOX CULVERT 2 X 2
PEMBESIAN BOX CULVERT 2 X 2
PEMBESIAN PARAPET BOX CULVERT 2 X 2
PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2

KM 107+375
RENCANA BOX CULVERT 2 X 2
DETAIL SAYAP BOX CULVERT 2 X 2
BATAN DAFTAR GAMBAR PEKERJAAN TRACK, SIP
PEMBESIAN BOX CULVERT 2 X 2
PEMBESIAN PARAPET BOX CULVERT 2 X 2
PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2

KM 107+550
RENCANA BOX CULVERT 2 X 2
DETAIL SAYAP BOX CULVERT 2 X 2
PEMBESIAN BOX CULVERT 2 X 2
PEMBESIAN PARAPET BOX CULVERT 2 X 2
PEMBESIAN DINDING SAYAP BOX CULVERT 2 X 2
BATAN DAFTAR GAMBAR PEKERJAAN TRACK, SIP

ISI GAMBAR

KM 106+574
UNDERPASS 3 X 3
DETAIL SAYAP UNDERPASS 3 X3
PEMBESIAN UNDERPASS 3 X 3
PEMBESIAN PARAPET UNDERPASS 3 X 3
PEMBESIAN PLAT INJAK 3 X 3
PEMBESIAN DINDING SAYAP UNDERPASS 3 X 3

KM 108+450
UNDERPASS 3 X 3
DETAIL SAYAP UNDERPASS 3 X3
PEMBESIAN UNDERPASS 3 X 3
PEMBESIAN PARAPET UNDERPASS 3 X 3
PEMBESIAN PLAT INJAK 3 X 3
PEMBESIAN DINDING SAYAP UNDERPASS 3 X 3

KM 108+025
UNDERPASS 3 X 3
DETAIL SAYAP UNDERPASS 3 X3
PEMBESIAN UNDERPASS 3 X 3
PEMBESIAN PARAPET UNDERPASS 3 X 3
PEMBESIAN PLAT INJAK 3 X 3
PEMBESIAN DINDING SAYAP UNDERPASS 3 X 3
BATAN DAFTAR GAMBAR PEKERJAAN TRACK, SIP
GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN
ISI GAMBAR
KM 108+025

LAYOUT JEMBATAN
POTONGAN MEMANJANG
POTONGAN MELINTANG
DENAH TIANG BORE PILE
DIMENSI PANGKAL A1/A2
PENULANGAN PANGKAL A1/A2 (PENULANGAN PLAT PONDASI DAN BADAN )
PENULANGAN PANGKAL A1/A2 (2) (PENULANGAN DINDING SAYAP DAN DAFTAR PENULANGAN )
PENULANGAN PANGKAL A1/A2 (3) PENULANGAN KONSOL PLAT INJAK
PENULANGAN PANGKAL A1/A2 (4) (PENULANGAN PLAT INJAK )
PENULANGAN PANGKAL A1/A2 (5) (PENULANGAN TIANG BORE PILE )
DIMENSI PILAR P1
PENULANGAN PILAR P1 (PENULANGAN PLAT PONDASI DAN BADAN PILAR)
PENULANGAN PILAR P1 (DAFTAR PENULANGAN)
PENULANGAN PILAR P1 (PENULANGAN TIANG BORE PILE)
PIN JEMBATAN
DETAIL PIN JEMBATAN
RETAINING WALL JEMBATAN
PEMBESIAN RETAINING WALL JEMBATAN

DETAIL GIRDER JEMBATAN


LAYOUT TENDON
DIAFRAGMA JEMBATAN
DETAIL DIAFRAGMA JEMBATAN
RAILING JEMBATAN
LAYOUT DAN PEMBESIAN PLAT LANTAI JEMBATAN
GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN
DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN

NOMOR GAMBAR ISI GAMBAR NOMOR GAMBAR ISI GAMBAR


3-TR 000-A DAFTAR GAMBAR 3.1.5 BOX PENYEIMBANG 2 X 2 KM 107+550
3-TR 000-B LOKASI MAP PROYEK 3-BP -001 RENCANA DAN SITUASI
3-TR 000-C KETERANGAN 3-BP -002
3-BP -003
1. UMUM RENCANA LETAK TRACK DAN POTONGAN MEMANJANG 3-BP -004
3-TR 001 RENCANA LETAK TRACK KM 106+300 - 108+600 3-BP -005
1.1 TRACK DETAIL 3-BP -006
1.2 TRACK ARRAGEMENT 3.1.6 BOX PENYEIMBANG 2 X 2 KM 107+625
3-TR 001 TRACK ARRAGEMENT 3-BP -001 RENCANA DAN SITUASI
2. PEKERJAAN SIPIL 3-BP -002
2.1 BADAN JALAN KA 3-BP -003
3-BJKA 001 CROSS SECTION 3-BP -004
3-GR 002 GEBALAN RUMPUT 3-BP -005
3-U DITCH 003 U-DITCH 3-BP -006
3- CDLD 004 CROSS DRAIN dan LONG DRAIN 3.1.7 BOX PENYEIMBANG 2 X 2 KM 107+942,63
3-RW 001 RETAINING WALL TUBUH BAAN 3-BP -001 RENCANA DAN SITUASI
3. BOX CULVERT 3-BP -002
3.1 BOX PENYEIMBANG 2x2 3-BP -003
3.1.1 BOX PENYEIMBANG 2 X 2 KM 106+300 3-BP -004
3-BP -001 RENCANA DAN SITUASI 3-BP -005
3-BP -002 3-BP -006
3-BP -003 3.1.8 BOX PENYEIMBANG 2 X 2 KM 108+015,57
3-BP -004 3-BP -001 RENCANA DAN SITUASI
3-BP -005 3-BP -002
3-BP -006 3-BP -003
3.1.2 BOX PENYEIMBANG 2 X 2 KM 106+575 3-BP -004
3-BP -001 RENCANA DAN SITUASI 3-BP -005
3-BP -002 3-BP -006
3-BP -003 3.1.9 BOX PENYEIMBANG 2 X 2 KM 108+430
3-BP -004 3-BP -001 RENCANA DAN SITUASI
3-BP -005 3-BP -002
3-BP -006 3-BP -003
3.1.3 BOX PENYEIMBANG 2 X 2 KM 106+825 3-BP -004
3-BP -001 RENCANA DAN SITUASI 3-BP -005
3-BP -002 3-BP -006
3-BP -003
3-BP -004
3-BP -005
3-BP -006
3.1.4 BOX PENYEIMBANG 2 X 2 KM 107+375
3-BP -001 RENCANA DAN SITUASI
3-BP -002
3-BP -003
3-BP -004
3-BP -005
3-BP -006

DAFTAR GAMBAR PEKERJAAN TRACK, SIPIL DAN JEMBATAN

NOMOR GAMBAR ISI GAMBAR NOMOR GAMBAR ISI GAMBAR


3.2 UNDERPASS 3 X 3 3-JBT-016 DETAIL GIRDER JEMBATAN
3.2.1 UNDERPASS 3 X 3 KM 106+574 3-JBT-017 LAYOUT TENDON
3-UP -001 RENCANA DAN SITUASI 3-JBT-018 RAILING JEMBATAN
3-UP -002
3-UP -003
3-UP -004
3-UP -005
3-UP -006
3.2.2 UNDERPASS 3 X 3 KM 108+450
3-UP -001 RENCANA DAN SITUASI
3-UP -002
3-UP -003
3-UP -004
3-UP -005
3-UP -006
3.3 UNDERPASS 5 X 3.5 KM 108+025
3-UP -001 RENCANA DAN SITUASI
3-UP -002
3-UP -003
3-UP -004
3-UP -005
3-UP -006
4. PEKERJAAN JEMBATAN KM 108+025
3-JBT-001 LAYOUT JEMBATAN
3-JBT-002 POTONGAN MEMANJANG
3-JBT-003 POTONGAN MELINTANG
3-JBT-004 DENAH TIANG BORE PILE
3-JBT-005 DIMENSI PANGKAL A1/A2
3-JBT-006 LAYOUT DIAFRAGMA
PENULANGAN PANGKAL A1/A2 (PENULANGAN PLAT
3-JBT-007
PONDASI DAN BADAN )

PENULANGAN PANGKAL A1/A2 (2) (PENULANGAN


3-JBT-008
DINDING SAYAP DAN DAFTAR PENULANGAN )

PENULANGAN PANGKAL A1/A2 (3) PENULANGAN


3-JBT-009
KONSOL PLAT INJAK
PENULANGAN PANGKAL A1/A2 (4) (PENULANGAN
3-JBT-010
PLAT INJAK )
PENULANGAN PANGKAL A1/A2 (5) (PENULANGAN
3-JBT-011
TIANG BORE PILE )
3-JBT-012 DIMENSI PILAR P1
PENULANGAN PILAR P1 (PENULANGAN PLAT
3-JBT-013
PONDASI DAN BADAN PILAR)
3-JBT-014 PENULANGAN PILAR P1 (DAFTAR PENULANGAN)

PENULANGAN PILAR P1 (PENULANGAN TIANG BORE


3-JBT-015
PILE)