As Built Plan: General Notes

This document contains calculations for voltage drop and short circuit analysis of an electrical load schedule: 1) A voltage drop calculation is shown for a 328 foot feeder with 3- 60mm2 THHN cables and 1- 14mm2 THHN cable carrying 137 amps. The calculated voltage drop is 0.787% which passes requirements. 2) A short circuit calculation is performed assuming a 75kVA secondary transformer. The calculated symmetrical fault current is 11,488 amps which is within the transformer rating. 3) Notes are provided on the methodology for the short circuit calculation including fault current, current multiplier, symmetrical current, and motor contribution.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

As Built Plan: General Notes

This document contains calculations for voltage drop and short circuit analysis of an electrical load schedule: 1) A voltage drop calculation is shown for a 328 foot feeder with 3- 60mm2 THHN cables and 1- 14mm2 THHN cable carrying 137 amps. The calculated voltage drop is 0.787% which passes requirements. 2) A short circuit calculation is performed assuming a 75kVA secondary transformer. The calculated symmetrical fault current is 11,488 amps which is within the transformer rating. 3) Notes are provided on the methodology for the short circuit calculation including fault current, current multiplier, symmetrical current, and motor contribution.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES:

B LOAD SCHEDULE
EE 1 SCALE NTS

VOLTAGE DROP CALCULATION SHORT CIRCUIT CALCULATION


* APPROXIMATE LENGTH OF FEEDER PER RUN (IN FEET) : R= OHMIC RESISTANCE
L = 328 ft. X= OHMIC REACTANCE
* TOTAL FULL LOAD CURRENT @ 90% D.F. :
L= LENGTH OF CABLE IN FEET
I = 137.1744 AMPERES Z= OHMIC IMPENDANCE
FL N= NO.OF CABLE/SETS
* FEEDER SIZE:
3 - 60mm2 THHN & 1 - 14mm2 THHN ASSUME 75KVA SECONDARY TRANSFORMER
Fault
1.732 x K x I x L 75 x 1000
V.D. = Step 1. l f.I.= = 188.27A
1,000,000 230 x 1.732
Step 2. Multiplier = 100 = 90
L = TOTAL LENGTH OF WIRE (ft) 1.11
K = DC RESISTANCE AT 75deg.CELSIUS (OHM/kft) Step 3. ls.c. = 188.27 x 90 = 16944.3A
l s.c. motor contrib = 4 x 188.27 = 753.08 A
1.732 x 0.101x 328x 137.1744
% V.D. = x 100% l total s.c. sym RMS = 16944.30 + 753.08 = 17697.38A
1,000,000

= 0.787% (REMARKS : PASSED)


1.732 x 40 x 16944 = .475
Step 4. f= 10,755x 1 x 230
0.787% 1
________
V.D. = 230V x = 1.81 V Step 5. M = = 0.678
100 % 1 + .475
l
Step 6. s.c. sym RMS = 16,944.3 x 0.678 = 11,488.2354 A
Voltage Sending = 230 Volts l s.c. motor contrib = 4 x 188.27 = 753.08A
Voltage Drop = 1.81 Volts l total s.c. sym RMS = 11,488.2354+ 753.08 = 12,241.3154 A

A POWER LAYOUT Voltage Receiving = 228.20 Volts


USE AT-LEAST 18KAIC for PP
EE 1 SCALE 1:200

LEGEND:

CONTRACTOR: ENGINEER: PROJECT TITLE: SHEET CONTENTS: SHEET NO.

CAD BY:
UNIT 16A25 VICTORIA DE MANILA WALLEM INNOVATIVE PADS

TAFT AVE. MALATE MANILA


Tel. No. (632) 516-2952 / (632) 624-6127
Telefax No. (632) 516-2952
SOLUTIONS OFFICE
Building 28, Narra Lane, Philexcel Business Park, M.A. Roxas Highway, Clark Freeport Zone, 2023, Pampanga
AS BUILT PLAN CHECKED:
FRANCIS

DATE:
06.20.18