Precast IFC
Precast IFC
Workshop on
Value Proposition for Green
Affordable Housing
Scaling up the delivery of
‘PMAY: Housing for All’
Organized by
on
3 D M O NO LITHIC M O DULAR
P RECAST
by
1
Ind ust rial ize C onst ruction
a p a r a d ig m sh if t
2
Levels of Construction Technology
MODULAR
MATERIAL COMPONENTS ELEMENTAL OR PLANAR COMPLETE BUILDING
VOLUMETRIC SYSTEM
SYSTEMS SYSTEMS
Basic materials for site- Manufactured Linear or 2D 3D components in the Modular components -
intensive construction components components form of modules fully finished and
✓ Involves more ✓ Fabricated in Factory ✓ Series of Pre ✓ Volumetric, forms a delivered to site
Labour ✓ Can’t be build On- fabricated elements completed part of ✓ Finished interior &
✓ Time consuming site assembled to form the building exterior surfaces
the shell ✓ Involves more than ✓ Less on-site work
✓ Assist in
construction speed ✓ Requires on-site one trade in the
work factory 3
& quality
Source: Gibb., A.G.F., Off-site Fabrication—Pre-Assembly, Pre-Fabrication, and Modularization
MODULAR TECHNOLOGY
ANGANWADI
Part 1
ANGANWADI INSTALLATION
Part 2
4
1. 90T – 150T
Crane
Gen TOILET OFFICE
5 Set
2. Auger Piling JCB
7
3D Monolithic Modular Technology
9
MODULAR Enables
REPETITION
REPLICABILITY
SCALE &
avails ECONOMIES OF SCALE
E n a b l e s S C A L I N G & S U S TA I N A B I L I T Y
10
3D Modular by hoMMission in India
for
Tata Housing at Boisar, Mumbai
As fast as needed
Machine Made Quality
Only by Engineers & Technicians No Labour
Premium Quality @ same Cost
11 11
The Technology
12
power finished floor
blast proof
50+ years Structural Guarantee
5k – 100 k sq. ft. in 24 hours no scaffolding
3D embedded insulated wall no joints
no timber
no plastering
modular
3D Volumetric Casting
no propping
5 panel in one
ongoing maintenance reduced by 95%
fair finish, inside/out
Computerized mould system
13
India Project
Tata New Hav en Boisar 2
14
India Project
Tata New Hav en Boisar 2
15
India Project
Tata New Hav en Boisar 2
16
India Project
Tata New Hav en Boisar 2
17
India Project
Tata New Hav en Boisar 2
18
India Project
Tata New Hav en Boisar 2
19
India Project
Tata New Hav en Boisar 2
20
India Project
Tata New Hav en Boisar 2
21
22
23
24
India Project
Tata New Hav en Boisar 2
25
India Project
Tata New Hav en Boisar 2
26
India Project
Tata New Hav en Boisar 2
27
India Project
Tata New Hav en Boisar 2
28
India Project
Tata New Hav en Boisar 2
29
30
31
32
33
34
35
36
37
38
39
40
India Team
41
Manufacturing & Assembly is an Imperative for India
Thank You