Questions 1 and 2: Costing of A 100-Unit Batch of CS-29 Carburetors

The document contains cost analyses for producing a 100-unit batch and spare parts inventory of CS-29 carburetors. For the 100-unit batch, the first proposal estimates total costs of $8,172.86 compared to the present method cost of $7,050.96, a difference of $1,121.90 or 16% more. The revised proposal estimates total costs of $8,063.42 compared to the present method, a difference of $1,012.46 or 14% more. For the spare parts inventory, the first proposal estimates total costs of $126,685.58 compared to revised estimates of $125,218.48.

Uploaded by

Erika Lozano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Questions 1 and 2: Costing of A 100-Unit Batch of CS-29 Carburetors

The document contains cost analyses for producing a 100-unit batch and spare parts inventory of CS-29 carburetors. For the 100-unit batch, the first proposal estimates total costs of $8,172.86 compared to the present method cost of $7,050.96, a difference of $1,121.90 or 16% more. The revised proposal estimates total costs of $8,063.42 compared to the present method, a difference of $1,012.46 or 14% more. For the spare parts inventory, the first proposal estimates total costs of $126,685.58 compared to revised estimates of $125,218.48.

Uploaded by

Erika Lozano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Holaa

Ad

Da

Da

Fas

Fafas

Fas

Questions 1 and 2
Costing of a 100-unit batch of CS-29 carburetors:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 21 (17) $52.97 $1,112.37 $53.12 $1,115.52
........................................
Grinding 12 (10) 48.14 577.68 46.75 561.00
........................................
Machining 58 (46) 87.52 5,076.16 86.50 5,017.00
........................................
Assembly 35 (28) 40.19 1,406.65 39.14 1,369.90
........................................
Total, proposed 126 = 101% 8,172.86 8,063.42
method due to
........................................ rounding
Total, present 126 55.96 7,050.96 55.96 7,050.96
method
........................................
Difference $1,121.90 (16% more) $1,012.46 (14%
........................................ more)
Costing of spare parts for inventory:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 304 (18) $52.97 $16,102.88 $53.12 $16,148.48
........................................
Grinding 270 (16) 48.14 12,997.80 46.75 12,622.50
........................................
Machining 1,115 (66) 87.52 97,584.80 86.50 96,447.50
........................................
Questions 1 and 2
Costing of a 100-unit batch of CS-29 carburetors:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 21 (17) $52.97 $1,112.37 $53.12 $1,115.52
........................................
Grinding 12 (10) 48.14 577.68 46.75 561.00
........................................
Machining 58 (46) 87.52 5,076.16 86.50 5,017.00
........................................
Assembly 35 (28) 40.19 1,406.65 39.14 1,369.90
........................................
Total, proposed 126 = 101% 8,172.86 8,063.42
method due to
........................................ rounding
Total, present 126 55.96 7,050.96 55.96 7,050.96
method
........................................
Difference $1,121.90 (16% more) $1,012.46 (14%
........................................ more)

Costing of spare parts for inventory:


First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 304 (18) $52.97 $16,102.88 $53.12 $16,148.48
........................................
Grinding 270 (16) 48.14 12,997.80 46.75 12,622.50
........................................
Machining 1,115 (66) 87.52 97,584.80 86.50 96,447.50
........................................
Questions 1 and 2
Costing of a 100-unit batch of CS-29 carburetors:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 21 (17) $52.97 $1,112.37 $53.12 $1,115.52
........................................
Grinding 12 (10) 48.14 577.68 46.75 561.00
........................................
Machining 58 (46) 87.52 5,076.16 86.50 5,017.00
........................................
Assembly 35 (28) 40.19 1,406.65 39.14 1,369.90
........................................
Total, proposed 126 = 101% 8,172.86 8,063.42
method due to
........................................ rounding
Total, present 126 55.96 7,050.96 55.96 7,050.96
method
........................................
Difference $1,121.90 (16% more) $1,012.46 (14%
........................................ more)

Costing of spare parts for inventory:


First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 304 (18) $52.97 $16,102.88 $53.12 $16,148.48
........................................
Grinding 270 (16) 48.14 12,997.80 46.75 12,622.50
........................................
Machining 1,115 (66) 87.52 97,584.80 86.50 96,447.50
........................................
Questions 1 and 2
Costing of a 100-unit batch of CS-29 carburetors:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 21 (17) $52.97 $1,112.37 $53.12 $1,115.52
........................................
Grinding 12 (10) 48.14 577.68 46.75 561.00
........................................
Machining 58 (46) 87.52 5,076.16 86.50 5,017.00
........................................
Assembly 35 (28) 40.19 1,406.65 39.14 1,369.90
........................................
Total, proposed 126 = 101% 8,172.86 8,063.42
method due to
........................................ rounding
Total, present 126 55.96 7,050.96 55.96 7,050.96
method
........................................
Difference $1,121.90 (16% more) $1,012.46 (14%
........................................ more)
Costing of spare parts for inventory:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 304 (18) $52.97 $16,102.88 $53.12 $16,148.48
........................................
Grinding 270 (16) 48.14 12,997.80 46.75 12,622.50
........................................
Machining 1,115 (66) 87.52 97,584.80 86.50 96,447.50
........................................
Questions 1 and 2
Costing of a 100-unit batch of CS-29 carburetors:
First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 21 (17) $52.97 $1,112.37 $53.12 $1,115.52
........................................
Grinding 12 (10) 48.14 577.68 46.75 561.00
........................................
Machining 58 (46) 87.52 5,076.16 86.50 5,017.00
........................................
Assembly 35 (28) 40.19 1,406.65 39.14 1,369.90
........................................
Total, proposed 126 = 101% 8,172.86 8,063.42
method due to
........................................ rounding
Total, present 126 55.96 7,050.96 55.96 7,050.96
method
........................................
Difference $1,121.90 (16% more) $1,012.46 (14%
........................................ more)

Costing of spare parts for inventory:


First Proposal Revised Proposal
Department Hours (%) Rate Total Rate Total
Casting/Stamping 304 (18) $52.97 $16,102.88 $53.12 $16,148.48
........................................
Grinding 270 (16) 48.14 12,997.80 46.75 12,622.50
........................................
Machining 1,115 (66) 87.52 97,584.80 86.50 96,447.50
........................................

Afa