Nust Business School: S.R Hero PVC Pipe Factory
Nust Business School: S.R Hero PVC Pipe Factory
SUPERVISED BY:
DR. MOHSIN SADAQAT
GEC MEMBERS:
DR. FAREESA MALIK
DR. NABEEL SAFDAR
SUBMITTED BY:
IRAM KHAN
JEHANZEB SULTAN
MAHAM NADEEM KHAN
SAIM RASHEED
P a g e 2 | 15
EXECUTIVE SUMMARY
The main objective of our Final Year Project is to identify the gaps and reasons behind the
problems at hand for SR Hero PVT LTD. through internal and external analysis. These analyses
will further help us design and develop new processes and standard operating procedures for the
company. We will then address these problems with proposed strategies & solutions and then
review and check the performance of those solutions through Key Performance Indicators. In order
to make sure the sustainability of these strategies & solutions, we have developed post
implementation strategies as well.
1. To prepare the company registration documentation and fulfill the registration pre-
requisites of company registration
2. To identify the gaps in current financial structure and to plan & implement financial
reporting system in line with industry best practices
3. To identify the gaps in current inventory management practices and to plan &
implement inventory management system in line with industry best practices
5. To perform post implementation analysis by comparing present and old practices of the
company
P a g e 3 | 15
Introduction
Company Introduction
SR Hero PVC Pipe Factory is situated in Multan. It is a partnership firm established in 2012 by
Mr. Sadaqat Ali and Mr. Rasheed Ahmed Awan. They started manufacturing PVC pipes and
selling in the local markets of Multan. During that period the overall economic conditions were
not healthy and there were energy shortfalls as well, therefore, the firm faced hard time to establish
its foothold in the market. At that time, 90% of customers purchased pipes on accrual payments.
As the time passed, they grow and sustained their business by maintaining close relationships with
local market merchants of Multan. They also targeted different landlords in different regions of
Pakistan, mainly south Punjab, a cash-based customer. Further details of the company and product
portfolio are given in the appendix 1.
Problem Statement
1. Data Capturing and Management
One of the baseline problems the company is facing is due to the methods of data
capturing and management. At present, available data is being handled manually (paper-based
data handling) and that data is not being updated regularly (master data on supplier request and
lead time that is entered once, sometimes even only dummy numbers, and then remains
unchanged for years). Company’s accounts are limited to cash inflows and outflows which is
why they are unable to generate any kind of reports for financial analysis, thereby leads to
many economical and operational inefficiencies that is causing delays in decision making.
Details of company’s record keeping practices are mentioned in appendix 2.
P a g e 4 | 15
3. Physical Process Execution of Humans and Machines
As mentioned earlier, absence of any system leads to processes execution based on gut
feeling. That is why, the management of operations is not being enhanced at its full potential.
This underutilization of capacity leads to many lost opportunities and excess fixed operational
costs.
Proposed Methodology
We have divided the methodology into five steps. We have done the first step of Problem
Recognition (some of the problems have been mentioned by the company representatives and
others have been identified). Remaining four phases are being discussed below.
Business Diagnosis
The first step is to perform a complete diagnosis of the company and its operations. In this way we
will be able to understand the current practices being followed in the company. Based on which
we can identify the root cause to problems at hand. For this diagnosis, we’ve planned a twofold
approach (given below).
In order to be fully aware of the system and how the processes work at SR Hero PVC, we will
be visiting the organization multiple times. To gain more in depth understanding, we will stay
P a g e 5 | 15
at the organization and will spend time from day start till the day off and observe the routine
activities being held there. In this way, we might be able to identify the issues being faced by
the company.
Apart from our personal observations, we will conduct interviews with the owners and workers
at the company. This will give us insights and make us able to understand the reasons behind
problems and the processes themselves.
2. Gap Analysis
By thoroughly identifying and analyzing internal processes, we will try to study the industry
practices to identify further gaps.
Market Research
To be fully aware of the industry practices and develop do’s and don’ts for SR Hero,
we will visit other PVC pipe factories in Multan and search available literature. Based
on our market research, we will be able to set benchmark standards for our project.
Competitor Analysis
SR Hero has numerous competitors present in the market. We’ll be studying and try to
find their practices in order to build competitive advantage or decide what standards
we must follow.
Plan
The next step is planning the project implementation based on our observations and
analysis. Identify the works required to be realized in the project. Below are the activities we have
planned.
1. Deliverables
These deliverables are based on what are the requirements and issues at hand.
P a g e 6 | 15
i. Documentation and Registration of the company
Documentation and Registration of the company have been identified to be one of the
most important tasks, we have currently suggested some recommendations to SR Hero for the
registration of the company.
Implementation is defined as per the set objectives of the project. For our project we are only
concerned with the financial objectives.
P a g e 7 | 15
Measurement of performance of the company on an ongoing basis.
Monthly Sales Growth and Targets: Percentage of previous sales vs sales after the
implementation of a new system.
Order processing time: Time taken to process or manufacture the order till it was shipped and its
comparison to previous order processing time.
Production lead time: Production lead time tells us about the responsiveness of company to
satisfy customers demand. Above average lead times give competitors an edge not only in
satisfying customers but also in changing and improving product specifications. It also indicates
inefficiencies in the production process.
Percentage of stock out inventory: When a customer places the order, but the company doesn’t
have inventory to satisfy customer order it is called stock out.
Inventory service level: In most of the cases when we are dealing with inventory problems, lead
time is taken as a measure. But it is often difficult to predict the value of stock out cost when taking
lead-time variable. For this purpose, we use service level parameter.
Days of sales outstanding: Days sales outstanding is to guess the size of their outstanding
accounts receivable. It measures this size not in units of currency, but in average sales days.
Inventory Turnover: Inventory turnover is a ratio showing how many times a company has sold
and replaced inventory during a given period.
Cost Reductions: How much cost have been reduced as a result of the changes we’ve made. We
have targeted the reduction by 15 to 20%.
Other challenges addressed and improvements: We will also analyze whether the challenges
previous being faced by the company have been addressed successfully or not. What are the effects
of new implementations? Has it made any improvements or even worsen the company’s progress?
Comparison of old vs new processes and their efficiency: At the end of our project we will
compare the old and new processes and their efficiencies in order to check the effect of our work
and suggestions for the company.
P a g e 8 | 15
GANTT CHART
9/7/2018
10/27/2018
12/16/2018
2/4/2019
3/26/2019
5/15/2019
7/4/2019
8/23/2019
10/12/2019
Orientation
Finalize Report
Report Finalization
P a g e 9 | 15
APPENDIX
Appendix 1
Detail of Stock Keeping Units
1. PVC Resin
2. Calcium
4. Steric Acid
5. Titanium
6. Neel
7. DOP (Diesel)
8. UV Tax
Manufacturing Process
1. Mixer
2. Pallets Machine
6. Socket Machine
7. Bundling
8. Stock Keeping
Appendix 2
Gate Pass
For every material going out of factory a Gate Pass is generated. It consists of three copies. One
for office use and two for the customers. One of the customers’ copies is returned to the customer
with a customer’s signature on it when he received the goods. Every gate pass has a serial number
against which bill is generated in Bill Books.
P a g e 11 | 15
Bill Book
For each Gate Pass product, bill is generated that consist of price of a product as per decided
with the customer. Then the bill is sent to customer on every Thursday for recovery of
payments. Bill Book has a serial number which is then used to make an entry in Major Account
Book.
P a g e 12 | 15
Major account Book
Each bill generated in Bill Book is then entered in the Major Account Book and each account book
has a serial number which is used to record transaction in respective Customer Account Book.
P a g e 13 | 15
Daily record book
Daily expenses and payments received of any good are recorded in Daily Record Book which is
then recorded on the Major Account Book.
P a g e 14 | 15
REFERENCES