Project Name: Plot No. 117 C Wave Estate Sector 85 SAS Mohali Project By: Gemini Infrastructure F451-FF, Phase 8B, S.A.S.Nager Mohali Punjab

This document provides a summary of a residential construction project including: 1. The project name is Plot No. 117 C, Wave Estate, Sector 85 SAS Mohali. 2. The project is being developed by Gemini Infrastructure located in Phase 8B, S.A.S.Nager Mohali, Punjab. 3. Details of steel reinforcement bars are provided for different structural elements including beams and columns.

Uploaded by

Ajay Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Project Name: Plot No. 117 C Wave Estate Sector 85 SAS Mohali Project By: Gemini Infrastructure F451-FF, Phase 8B, S.A.S.Nager Mohali Punjab

This document provides a summary of a residential construction project including: 1. The project name is Plot No. 117 C, Wave Estate, Sector 85 SAS Mohali. 2. The project is being developed by Gemini Infrastructure located in Phase 8B, S.A.S.Nager Mohali, Punjab. 3. Details of steel reinforcement bars are provided for different structural elements including beams and columns.

Uploaded by

Ajay Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT NAME:

PLOT NO. 117 C


1"
15'-12 16'-6" Wave estate
B2 B2 9" Sector 85 SAS Mohali

c
b
a c a
b
Project By:
Gemini Infrastructure
F451-FF, Phase 8B,
S.A.S.Nager Mohali punjab.
f f f f

d
e e
d
e
d
e
d B1 1"
19'-42
B1 B1

STEEL BAR 9"


1 TO 3 =20mm dia.

3"
7 8 9 10

b b
4 TO 6 =16mm dia.
c a c a
7 TO 10 =12mm dia.

5'
4 5 6
B2 B2 c a
b
Rings 10mm dia. @ 1 2 3
c
b
a 175 mm c/c
DETALING BEAM B1
f
e e
f f
e
f
e
1"
13'-42
B2 d d d d
B2
STEEL BAR 9"
1 TO 2 =20mm dia.

3"
B2
7 8 9 10

3 TO 6 =16mm dia.
b b
c a c a
7 TO 10 =12mm dia.

5'
4 5 6
B2 B2
Rings 10mm dia. @ 1 3 2
c a c a
b b
175 mm c/c
DETALING BEAM B2
f

d
e e
f

d
f
e
d
f
e
d
14'-9"
STEEL BAR
1
9" 3 2
1 TO 2 =20mm dia.

3"
B2
B2
B2 4 5 6
3 TO 6 =16mm dia.
7 TO 10 =12mm dia.

5'
c
b
a c
b
a Rings 10mm dia. @ 7 8 9 10
B2 B2 175 mm c/c
c a c a
b b

DETALING BEAM B3
STEEL:-
SLAB =5" (M25 GRADE OF CONCRETE & STEEL FE-500)
f f f f

d
e e
d
e
d
e
d 1"
14'-42 a. 10O@10"c/c BOTTOM BAR
B2 B2 b. 10O@10"c/c CRANKED BAR
B2 c. 10O@10"c/c EXTRA TOP BAR

b b d. 10O@10"c/c BOTTOM BAR


c a c a
e. 10O@10"c/c CRANKED BAR
f. 10O@10"c/c EXTRA TOP BAR

B1 B1 DETAILS OF SLAB
9" NOTE :-
B3
1.ALL DIMENSIONS ARE IN FEET AND INCHES.
B3
f f f f
e
2.CLEAR COVER FOR SLAB=20
B3 e e e
d d d d
3.USE M25 GRADE OF CONCRETE.
4.H.Y.S.D Fe500.

Er. JAGDISH CHAND


STRUCTURE ENGINEER
ANSAL API, SEC. 115,
MOHALI-140301