Proforma For Geotechnical Inv. Using Test Pit & DCP Tets - G+3 Building

This document is a quotation for a geotechnical investigation at a construction site in Addis Ababa, Ethiopia. It outlines the field work, laboratory tests, and technical report that will be provided. The field work will include dynamic cone penetration tests and test pit logging and sampling. Laboratory tests will analyze grain size distribution, Atterberg limits, and free swell. A technical report with borehole logs, test results, and foundation recommendations will be delivered. The total cost is 6,624 Birr.

Uploaded by

sintayhu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
231 views1 page

Proforma For Geotechnical Inv. Using Test Pit & DCP Tets - G+3 Building

This document is a quotation for a geotechnical investigation at a construction site in Addis Ababa, Ethiopia. It outlines the field work, laboratory tests, and technical report that will be provided. The field work will include dynamic cone penetration tests and test pit logging and sampling. Laboratory tests will analyze grain size distribution, Atterberg limits, and free swell. A technical report with borehole logs, test results, and foundation recommendations will be delivered. The total cost is 6,624 Birr.

Uploaded by

sintayhu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

@CN hC lr'7 &.

tlp,-, Desigr-E-ffiul[-4,
ft.f\.q- :r.(4.ut. ?'?A ^1.

QUOTATION
Project: Geotechnical lnvestigation for G+3 Residence Building
Client: Peter
Location site : A.A. Yeka Sub citv, Kotebe
Your Ref. Ref.
Our 11
Date: Date: 1

Item Description Unit Quantity Unit Price Amount (Birr)

A. Field Work
1
Mobilization & Demobilization of field crew No. L5 I,000.00

Dynamic cone penetration test No. 2 420.00 840.00

5 Test pit logging. photographing and sampling No. 2 r,000.00 2.000.00


5ub Total A 3,840.00
B. Laboratory Tests
I Grain size distribution No. 80.00 160.00
z Atterberg Limit No 2 80.00 l60.oo
5 Free swell No. 2 50.00 100.00
Sub Total B 420.OO
Technical Report
fechnical report including borehole logs, laboratory test results
I L5 r.500.00
and foundation recommendation (two copies).
Sub Total C r,500.00
Total A+B+C 5.760.OO
l5olo VAT 86.+.OO

/ \ Grand Total 6.624.OO


I
!,-.
lni- 'o".rl o
Note:
PiF'$'Sel{ ii'
Field work completion time shall be 2 cale shall be 6 calendar days. Report completion
time shall be 3 Calendar Days. Total durati
5oolo advance shall be paid up on mobilization and be paid up on submission of final report

5incerely yours,

fizj^su{l.nlr-- ,nt:
.liintaye "!-aye
4:F,*tlkh *iah-fir:
t t-c^..-ltecllni.ca :eilng
!:en'vice r

P. O. Box 1 1 0246; Tel +251 I 11 52 96 781 9 29 90 64 64/65; Fax:+251 11 8603699; E-mail:ar-con@ethionet et, AdCis Ababa, Ethiopia