Oil containment
100,000 barrels/day total fluids
100,000 barrels/day oil or 70,000 barrels/day oil + 30,000 barrels/day water (35 API used as design case)
200 mmscfd gas flaring
All safety specifications compliant (i.e. meets RVP specifications but may not meet BS&W or salt)
Advantages provided
The philosophy adopted in
providing the oil
by the Dalian Developer
containment equipment is
to first acknowledge that it
may never be used and is A unique concept: the Dalian Developer is the only mobile drilling unit in the
potentially a sunk cost. world large enough to capture, process and store oil spills in excess of
Macondo’s flow rate.
Safe, simple and reliable: this single asset solution means reduced interface
complexity (operations / logistics / communications / procedures / flow
splitting issues) compared with the multi-asset system used for Macondo.
Only tried and tested systems and technologies are used on the Dalian
Developer. On board storage of bulk methanol and dispersant chemical
simplifies logistics and avoids the need for subsea storage and injection
packages.
Rapid response time: limited time needed to disengage from active drilling
and transit distance to spill site. The unit has a 12 knot transit speed.
Suitable as emergency operations hub or command centre: thanks to her size
The key challenge in designing an and excess capacities (storage / accommodation / power).
optimal spill capture vessel is finding High weather resistance: the Dalian Developer’s hull size, motion
a way to ensure it is an effective characteristics and full DP3 system enable her to operate safely even under
capture tool in emergency mode harsh weather conditions in virtually all major drilling basins worldwide.
whilst also ensuring good economic Double moonpool design: combined with size and stability makes her ideal
utilisation during normal operating for subsea intervention activities.
mode. The Dalian Developer is Superior economics: as a fully functioning drillship with Early Well Testing /
considered an economically superior Early Production System capabilities, her earnings capabilities in normal mode
solution which may facilitate should ensure an attractive return on total investment.
widespread adoption and The unit is under construction: it can therefore be ready for deployment
deployment of multiple units across much sooner than a newbuild unit.
the world’s main offshore drilling
basins. It represents a very cost-
effective way for oil companies to
mitigate the risk of future oil spills.
Unique versatility
Ultra-deepwater, 6th generation, DP3 drillship Extended Well Testing with more reliable reservoir data / history
Oil spill emergency response & containment Early production achieving early cash flow
Capture, process and store well flow Simultaneously drilling & production:
Drilling relief wells Drilling appraisal wells while testing
Emergency subsea intervention Drilling development wells while producing
Mother-ship / command-centre Intervention & Subsea installation works
Warehouse logistics offshore hub Drilling while carrying out well intervention
Lower dependence on supply chain Dual gradient drilling
Serve multiple vessels in remote offshore areas Underbalanced drilling
Dalian Developer - Main characteristics
Design features:
Double hull structure built to DNV ICE class C.
Identical bow and stern sections for +/- 90˚ heading change.
Motion characteristics equivalent to or better than 6th generation semi in head seas.
2 moonpools (one for drilling, second for subsea work and production).
Equipment / system modularized and elevated above tank top – less integration.
Accommodation upgradable to 240 men.
Large available deck space (5000 m²) for production systems, subsea equipment and spill containment equipment. (EWT, EPS, etc.).
Large storage capacity – 1m bbls - for production, chemical dispersants, etc.
General particulars:
Basic design: INOCEAN Displacement: 240,750 mt
Detailed design: COSCO Water depth: 3,050 m
Class: DNV – DP3 Drilling depth: 10,670 m
LOA: 291.25 m Transit speed: 12 knots
Breadth: 50.00 m Accommodation: 180 men
Depth: 27.00 m Crude oil storage: 1,000,000 bbls
Drilling Draft: 13.00 m Variable deck load: 32,000 mt
CONTACTS
Primary Secondary