50% found this document useful (2 votes)
873 views3 pages

Itp Motor Control Center (MCC)

This document outlines the inspection and testing plan for a motor control center (MCC). It lists various tests and inspections to be performed at the factory acceptance test, pre-commissioning on-site test, and commissioning test stages. Tests include visual inspections, wiring checks, function tests, insulation resistance tests, and relay tests to verify proper construction and operation of the MCC. Responsibilities are assigned to the fabricator, client, and third party inspectors for surveillance of inspection activities.

Uploaded by

muhammad afrizal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
873 views3 pages

Itp Motor Control Center (MCC)

This document outlines the inspection and testing plan for a motor control center (MCC). It lists various tests and inspections to be performed at the factory acceptance test, pre-commissioning on-site test, and commissioning test stages. Tests include visual inspections, wiring checks, function tests, insulation resistance tests, and relay tests to verify proper construction and operation of the MCC. Responsibilities are assigned to the fabricator, client, and third party inspectors for surveillance of inspection activities.

Uploaded by

muhammad afrizal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

INSPECTION AND TESTING PLAN

MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
PRE INSPECTION Inform the client regarding the Certification Agencies H H ---
MEETING scope of work

DESIGN APPRAISAL - Drawing R R ---


- Calculations R R ---
- General Specifications R R ---

FACTORY ACCEPTANCE - Identification of Component, Material and Purchasing order H V V


TEST (FAT) - Visual Inspection W W W
- Wiring & Continuity Test W W W
- MCC Contruction Check W W W
- Small dry-type Distribution Transformer For Controls W W W
- Primary Injection Voltage Test W W W
- Electrical & Mechanical interlock test W W W
- Fuction Test W W W
- Check Ground Bus W W W
- Metering calibration W W W
- Automatic Transfer switch test (if Required) W W W
- Insulation Resistance Test W W W
- Relay Test W W W
INSPECTION AND TESTING PLAN
MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
- DC Hi pot test W W W
- Current & Potential Transformer Test W W W
- Current Transducer test W W W

PRE-COMMISSIONING - Verify nameplate of equipment with data sheet H V ---


TEST (ON-SITE) - Check Equipment Layout based on classification area W W ---
- Check Instruction's Book / Manual Guidance R R ---
- Contact resistance bus W W ---
- Open the cell doors and with the design document, check each W W ---
cell to ensure the correct component are installed
- Earthing measurement W W ---
- Check each drawer motor stater or feeder breaker assembly properly W W ---
- Check mechanism door locking and defeat function prpperly W W ---
- Inspect for the tighten W W ---
- Check cleaning on exterior and interior the MCC W W ---
- Check the cable feeder termination W W ---
- Check the power cables are properly color coded W W ---
- MCC wiring test W W ---
- Function test
- Relay test (as required)
INSPECTION AND TESTING PLAN
MOTOR CONTROL CENTER (MCC)

LEGEND RESPONSIBILITY : LEGEND ACTIFITY :


Project : F : Fabricator / Contractor / H - Mandatory Hold Point
Location : Installator V - Verity documents
Owner / User : C : Client R - Review documents
Contractor : TP : Third Party (PJIT) W - Witness Activity Date :
Third Party : M : Migas Rev :

SURVEILLANCE INSPECTION
DESCRIPTION PROCESS DESCRIPTION INSPECTION ACTIVITIES
F C TP M
- Insulation Resistance Test W W ---
- DC Hi pot Test W W ---
COMMISSIONING TEST - Performance Test W W W
, FINAL INSPECTION
, TAKING OF CERTIFICATE
(TOC)

3rd Party Inspection Company Owner / User MIGAS MIGAS

(....................) (.......................) (....................)