1. What is project management institute (PMI)?
2. Define concept of project appraisal.
3. Define Work break down structure and its importance.
4. Define & developed Project Charters.
5. Define Budget. Discuss the method of cost control using earned value
management (EVM).
6. Briefly explain Project Portfolio Management?
7. Explain staffing management plan with resource histograms.
8. Explain the integrated change control process in depth.
9. Explain acquire project team tools & technique.
10. Explain IT project as product delivery versus service delivery.
Section "B" 6×10
Descriptive Answer Questions
Attempt any six questions
11. What is a Project Management? Explain how you would be an effective
project manager? Why Agile is different from waterfall model?
12. Why Project scope management is important on IT Project? Explain
Change management.
13. Construct the CPM network for a project with the following activities;
Activities A B C D E F G H I J
predecessor - - A,B B A C E,F D,F G,H I
Days 4 7 4 3 2 1 6 5 8 9
Find:
a) Critical Path
b) Project completion Time
c) EST,EFT,LST,LFT
1
14. Being an IT project manager in a reputed IT company how are you
going to ensure the quality of the system development. What do you
understand by Quality Planning, Quality Assurance and Quality
Control? What are the techniques of quality control in a project?
15. Explain about the necessity of information distribution and its tools and
techniques. Discuss the communication management plan that should be
considered for ICT projects. Why a reporting system is required in a
project?
16. Define ‘risk’. Explain about sources of risk in a project. What do you
mean by qualitative and quantitative risk analysis?
17. What is a Procurement process? How is it performed in a project?
Consider you are hired as consultants in a IT College where every year
50 students are admitted in 4 year program. You are asked to prepare a
tender specification document for setting up a digital library to be set-up
on that college. State your all assumptions that you will be making
while preparing the document.
Section "C"
18. Case Analysis 20
Read the case situation below and answer the questions that follow.
Sydney needed to start the project fairly soon. She didn’t have the
luxury of taking time to build relationships and get to know people
before the project had to begin.