Time Management
Time Management
RPTIME00
RPTIME00 is a time evaluation program. You can execute it
using transaction SA38 or SE38.
2002 Attendances
2003 Substitutions
2005 Overtime
Regards
Sameer
i want to know how can we use TM04 both for positive and negative time
management.
and while using it in negative and positive time mangement what is the
time management status set to in 0007.
Sikinder has sent very good threads but this point is not clear to me if u
can tell me in details.
Preeti
You can assign the following Time Management statuses in the Planned
Working Time infotype (0007):
Time evaluation with planned times (0): Employees with this status are not
selected for time evaluation. They cannot therefore be processed in time
evaluation. The employee’s time wage types are determined in Payroll
time data processing.
Time Management Status for processing time data in Time Evaluation and
passing on time wage types formed there to Payroll
Time evaluation of actual times (1) and Time Evaluation PDC (2):
Employees with these statuses have all their actual times, that is, all
attendance and absence data, recorded*. It makes no difference whether
attendance times are recorded at time recording terminals or in the
Attendances infotype (2002).
Time evaluation with planned times (9): These employees have only the
deviations from their work schedule recorded for them. The employees’
planned working times from their personal work schedule are used as the
basis for time evaluation.
Time Management Status for processing time data in Time Evaluation
without passing on time wage types formed there to Payroll
Time evaluation without integration with Payroll (7): You use this status to
run time evaluation to handle special time accounts – to accrue absence
quotas, for example. It makes no difference whether all of the employees’
actual times are recorded or only the deviations from the work schedule.
The system stores the results of this time evaluation run in cluster B2,
which enables you to run reports on the data, for example. The results are
not passed on to Payroll. The time data processing part of Payroll treats
the employees as if they had the time management status No time
evaluation (0).
External services (8): Status for external employees. It makes no
difference whether all of the employees’ actual times are recorded or only
the deviations from the work schedule. The results of time evaluation are
transferred to Materials Management (MM-SRV), and are not passed on to
Payroll.
Positive and negetive time management are two different options that are
available in TM. In Negetive time , we consider the work schedules as
working time and in positve we take the actual timings of the employee.
Here the time in and time out will be considered as time pairs and based
on the considated out put employees working time will be considered.
https://forums.sdn.sap.com/click.jspa?
searchID=21428115&messageID=6878545
https://forums.sdn.sap.com/click.jspa?
searchID=21428115&messageID=6542681
https://forums.sdn.sap.com/click.jspa?
searchID=21428115&messageID=6868627
https://forums.sdn.sap.com/click.jspa?
searchID=21428115&messageID=6430663
instead of going into Technical way lets have a clear picture hear
at the end of the month we upload the data thru LSMW i mean absence we
run the pay roll
if the employee works OVER TIME the end user will caluculate the amount
and gives it in 0015 or we can right the rule
and will we Uploaded in the system in infotype 2011 time events and run
the TE so the system will generte the OT amount also
Here we can use time status 7 without integration of PY and time status 9
xxxxxx
U made me clear about time management status .
Urs knowledge is no doubt opening doors of my brain.
But mine question is:
1) Time schema TM04 is used why both for positive and negative time
management?
2) while we use
TM04 negative time mangement- what must be time evaluation status in
0007?
TM04 positive time management- what must be time evaluation status be
setted to in 0007?
TM00 Postive time mangement- what must be time evaluation status
setted to in 0007?
Here i am confused.
3) What is BDC and how can we upload data of negative time
management through this.
Preets.
Xxxxx
Time Evaluation is used to evaluate the recorded time datas to run the
time evaluation u need three basic information like master record ,
attendences , absences planned working ime and there are four possible
out pits after the time evaluation
Time wage types ,time accounts messages ,updated quotas
So we need to run time evaluation to get these out put which will be
processed in the pay roll to the payments .
Time evaluation is based on Time Schema
Xxxxxx
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PT/PT.pdf
http://help.sap.com/erp2005_ehp_04/helpdata/EN/54/095faf72f911d1a910
080009ab6b44/content.hthttp://www.insightcp.com/res_16.htm
xxxxx
You cannot use both because this is principal difference between positive
and negative time:
1. In positive: time pairs for normal working time are fromed from Time
Events, e.g. clock in / clock out times.
2. In negative:: time pairs for normal working time are fromed from work
schedule configuration.
If you use negative time, you should register abcense for late comming
(e.g. 30 minutes) then you can analyze it in time evaluation.
If you use CATS you can enter attendance: e.g. 9:30 to 18:00 against
standard 9:00 - 18:00. Then you can overwrite standard working time from
WSR configuration during formation of time pairs.
Cheers!
Xxxxx
Hi Ajay thanks for the thread that have posted its got lot of information.
yes attendance is uploaded to 2002 info type, here we are entering time
data through CATS for workers and we are entering time events 2011 for
staff employees. the difference between workers and staff employees is
overtime.
Can we process all employees through CATS rather than using Time
Events 2011 or shall we use both CATS as well as Time Events. if we use
only CATS then the scenario that i mentioned in my question may not work
i believe. Just confused.
Thanks in advance,
Dolly
Xxxxxxx
http://forums.sdn.sap.com/thread.jspa?
threadID=1724683&messageID=9286913#9286913
Here the employee strength is 240 and they don't have the swipe system.
if they want to go with positive time management they have to upload time
data manually in 2011 info type and also they have CATS integrated with
this. All workers time data captured in CAT2 T code and then transferred to
2002 attendance info type.
Condition :- His half day salary or half day leave eligibility has to be
deducted.
Here the issue client uses negative time management.
Xxxxx