This document is an inspection test record for miscellaneous equipment. It lists 6 items to inspect including verifying previous inspections are complete, equipment is installed and functioning, components are properly aligned, and manufacturer recommended pre-commissioning checks and no-load tests are performed. Upon completion, the contractor representative, inspector, and commissioning engineer must sign off.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
246 views1 page
ITR-B (Mecanical) M35B
This document is an inspection test record for miscellaneous equipment. It lists 6 items to inspect including verifying previous inspections are complete, equipment is installed and functioning, components are properly aligned, and manufacturer recommended pre-commissioning checks and no-load tests are performed. Upon completion, the contractor representative, inspector, and commissioning engineer must sign off.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
INSPECTION TEST RECORD (ITR) - B
MISCELLANEOUS EQUIPMENT M35-B
Project No. Project Title Facilities INFORMATION Tag no. System/Subsystem No.
INSPECTION / TEST OK N/A P/L No
1 Items installed, calibrated and designed according to attached Project Design Specification. 2 Verify that ITR-A is signed off prior to starting any work
3 Check that control panel equipment is completely installed and functioning
4 Confirm the driver /gearbox/driven equipment is correctly aligned
5 Carry out manufacturers’ recommended Pre-commissioning and Start-up
checks 6 Carry out manufacturers’ recommended No-load test (if applicable)
COMMENT(S) AND ADDITIONAL INFORMATION:
COMPLETED BY VERIFIED BY ACCEPTED BY
Designation Contractor Representative PMT Inspector Commissioning Engineer Company Name Signature Date