Oracle Projects User Guide For Advanced Services Pms/Dms
Oracle Projects User Guide For Advanced Services Pms/Dms
5
Q1FY10 Edition
CISCO CONFIDENTIAL
Introduction
Cisco is a networking leader that delivers a wide variety of hardware, software and service offerings to
organizations across the globe through Cisco Technical Support Services and Cisco Advanced Services
Organization. Regardless of the type of service provided and the location of its client, Cisco drives to
follow a standard and consistent global approach for client service delivery.
Cisco’s Advanced Services Organization follows distinct work models to deliver the products and services
to its Customers. The two key work models that govern Cisco’s style of service delivery are Transaction
and Subscription.
This guide is intended to help Project Managers (PMs) and Delivery Managers (DMs) get acquainted with
Cisco’s Advanced Services Organization. It will also help the users to understand how Cisco’s key work
models differ from each other and enable them to effectively handle Transaction Projects in Oracle
Projects application.
Cisco Services serves a variety of customers across the globe, from large to mid-size enterprises, small
businesses, service providers and public sector. Given the demands of the rapidly evolving global
economy and landscape, our customers are faced with many business challenges forcing them to cut
costs, improve operational efficiency and reduce risk while at the same time improve their
competitiveness by driving greater collaboration and innovation. These challenges are requiring business
and country leaders to adopt new business models and processes and they’re asking Cisco to help.
6
Q1FY10 Edition
CISCO CONFIDENTIAL
Cisco Services Portfolio
• Prepare
• Plan
• Design
• Implement
• Operate
• Optimize
The life cycle forms a continuous loop to support a highly efficient network infrastructure that supports
your business. This approach helps increase customers’ network’s business value and return on
investment.
Examples of Advanced Services are Unified Communications Planning and Design Services, Network
Optimization Service and Data Center Consolidation Service. At the core, these services help Cisco
customers transform their business to meet today’s requirements. They help evolve their network into an
intelligent, strategic platform and accelerate business success by aligning their IT infrastructure to their
business strategy.
Advanced Services are those services that help businesses during the “Prepare, Plan, Design, Implement
and Optimize” stages of the life cycle.
7
Q1FY10 Edition
CISCO CONFIDENTIAL
Advanced Services Lifecycle
A typical Transaction Project is based on a Statement of Work (SOW) which is created before the start
of the Project and signed by both the Customer and Cisco. The SOW includes the scope, project
timelines and clearly specifies the list of project deliverables. It also contains financial information and
often legal terms and conditions for the delivery of the project.
A Transaction Project is initiated when an Advanced Services-Transaction (AS-T) opportunity needs Pre-
Sales support, when resource planning needs to happen or at the latest, when a Transaction Project
order is processed for booking and no project was previously created.
The creation of a Transaction Project requires a Transaction Project opportunity be registered by the
Service Account Manager (SAM) or Account Manager (AM) in SalesForce.com (SFDC). However, note
that there is no interface between SFDC and Oracle Projects. The Deal Support Team (DST) manually
creates the Projects in Oracle Projects. A Service Level Agreement (SLA) has been defined for use in this
regard.
In general, invoicing occurs at the completion of each milestone. Revenue recognition happens at
milestone completion or at contract completion, when all delivery work is completed. Once all the agreed
deliverables are delivered, a Transaction Project is closed.
8
Q1FY10 Edition
CISCO CONFIDENTIAL
Transaction Project Sub-Types
PMs and DMs may encounter these four different Transaction Project subtypes within Oracle Projects:
The SOW [Milestone] subtype is used for all Transaction Projects based on a SOW with defined
milestones. Although T&M, SME and CONS deals are also governed by a SOW, Project Managers
should note that invoicing and revenue recognition rules are different.
SME contracts (US specific) and CONS contracts are invoiced upfront, with revenue recognized equally
over the duration of the contract. Consulting services have no specific deliverables defined, but only
provide a maximum number of consultancy days the Customer can consume during a set time frame.
T&M contracts are typically invoiced each month, upon signature of a timesheet. Revenue recognition
also happens monthly.
Suppose a Customer, AT&T buys 3 units of Telepresence using an agreement (SOW) with AS to install
each unit. AT&T agrees to pay AS in three installments one each on the completion of installation of a
Telepresence unit. When AS finishes installing the first unit of Telepresence and AT&T has made sure
that it works, AT&T pays the first installment to AS for its services and so forth.
9
Q1FY10 Edition
CISCO CONFIDENTIAL
CAP Projects
A Critical Accounts Program (CAP) Project is often created when there is a serious issue on a project and
the Customer relationship may be at risk. A CAP Project is created to compensate for any serious issues
on an existing Project and is not charged to the Customer. CAP Project creation is triggered by the CAP
Request form. The Delivery Manager requests a CAP Project and this involves an executive approval
process. Since the CAP Project is not charged to the Customer, only a Cost Budget is set up. The CAP
Project is funded by an internal funding source.
Once the CAP Project is approved, the Deal Support Team creates the CAP Project in Oracle Projects.
The AS CAP template is used to create a CAP Project.
Subscription Projects have two sub-types defined in Oracle Projects: New and Renewal. A Subscription
Project is initiated when an Advanced Services-Subscription (AS-S) opportunity needs Pre-Sales support,
when resource planning needs to happen or at the latest, when an AS-S order is processed for booking
and no Project had been created. The creation of a Subscription Project requires an AS-S opportunity be
registered by the Service Account Manager (SAM) or Account Manager (AM) in SalesForce.com (SFDC).
Once the delivery end date is reached, the Subscription Project is closed.
Most of the steps involved in the end-to-end project lifecycle for Subscription Projects are the same as
Transaction Projects. However, there are a few notable differences. Unlike Transaction Projects,
Subscription Projects are booked by time period and invoicing occurs at the beginning or as agreed upon
with the Customer. A unique Quote is booked in the Advanced Services Pricing Tool (ASPT), which
automatically generates the Work Breakdown Structure (WBS) and Cost Budget. The Subscription
Project Workplan is managed solely in Advanced Services Delivery Workspace – Advanced Delivery
Management (ASDW-ADM).
10
Q1FY10 Edition
CISCO CONFIDENTIAL
Subscription Project Model Example
The graphic below illustrates this example.
Transaction Technical
Transaction Transaction Transaction Subscription
Services
The table below illustrates how Transaction Projects compare to Subscription Projects.
11
Q1FY10 Edition
CISCO CONFIDENTIAL
Upfront
Per milestone, per set of milestones
Can also be on a pre-set
or at project completion
Invoicing frequency (monthly, quarterly,
SME/consulting deals are upfront
etc.)
Internal Projects
Internal Projects or Cisco work are used for internal improvement projects, fiscal initiatives, internal
investments, in-house testing, development work or even installing products and services for advertising
purposes.
Admin Projects
Admin Projects or Admin Work is used for all operating units within Advanced Services, with standard
tasks that relate to administrative activities, such as vacation/PTO, holidays, training, internal meetings,
travel time, management time and non customer facing job responsibilities. Admin Projects/ Admin Work
is intended for logging time for work done that is not billable to the customer.
12
Q1FY10 Edition
CISCO CONFIDENTIAL
Project Types in OP
13
Q1FY10 Edition
CISCO CONFIDENTIAL
order and deliver new services is determined and oversee the overall readiness of the roll-out. The
Product Managers and Portfolio Managers counsel the Theatre representatives, Advanced Services
SMEs and delivery teams to define services, delivery procedures and marketing collateral.
During the approval process, a decision is made around the payment schedule (per milestone or at the
end of the contract) and if Revenue Transfers are a part of the deal. Payment schedules and Revenue
Transfers are covered in the subsequent sections of this user guide.
These validations ensure that Cisco is booking what is planned to be delivered, which eliminates issues
and re-work during delivery. Once these validations are made, the Deal Support Team performs Project
Activation so that delivery teams can begin work.
14
Q1FY10 Edition
CISCO CONFIDENTIAL
manage their team’s time logging and expenses. They are also involved in monitoring the health of the
Project, based on reports of budgets, forecasts and Actuals. They must leverage the Project data to
maximize the performance. The Network Consulting Engineers (NCEs) execute the Project as per the
plan, delivering quality work and ensuring Customer satisfaction.
The Finance team will perform final validations of revenue recognition as a part of the Project Closure
activities.
1 2 3 4 5
15
Q1FY10 Edition
CISCO CONFIDENTIAL
Oracle Project Statuses
1. Pipeline
During the opportunity phase of the deal and a Project is created by the Deal Support Team (DST),
each Project defaults to Pipeline status. When a Project is in Pipeline status, a Project Manager is
able to define resource requirements, although time cannot be charged against it. To enable the
users to log time against the Project, the status of the Project must be changed to Pre-Sales.
2. Pre-Sales
Set by the Project Manager after the Project has been created and the Customer information set up.
When Sales support is required, the Project Manager changes the Project to Pre-Sales status. A
Project remains in Pre-Sales status as long as the deal is not ordered or booked. PMs in the EU and
EM may see that the DST has already moved the Project status to Pre-Sales.
3. Active
Set by the Deal Support Team after the Project Revenue and Cost Budgets have been created and
the initial Work Breakdown Structure (WBS) has been input and base-lined by the DST. Once the
Project is booked, the Deal Support Team sets up the Project for delivery and changes the status to
Active. During this stage, Project delivery is being executed and the Project Manager is responsible
for updating the Project Workplan. Resources, Schedule as well as updating the Cost and Revenue
Forecasts.
4. Delivery Close
Set by the Project Manager once the Customer engagement is finished and all actual costs and
expenses have been captured. When delivery of the project is complete, the Project Manager
changes the Project to Delivery Close status.
5. Closed
Set by the Deal Support Team on a Subscription Project once the final project information is sent over
to ASDW-ADM. Set by AS Finance for a Transaction Project once all financial transactions are
completed, including revenue recognition.
• Cancelled
An additional status that is used if a Project must be removed. A Project can only be cancelled if no
time has been logged against them. If time has been submitted and the Project must be removed, it
must be set to Closed.
• On Hold
Set by the Project Manager to indicate a pause on the project. Project Managers should refer to each
theatre’s management for On Hold specific guidelines. This is only used for Transaction Projects.
Team members and resources will not be able to log time to the project while it is in On Hold status.
Chapter 1 - Summary
In Chapter 1, Project Managers learned what it means to be a part of the Advanced Services
Organization within Cisco Services. As part of the consulting team, PMs and DMs deliver quality products
and services to the customer, while maintaining their project in Oracle Projects. Project Managers should
now have an understanding of how the Forecast to Delivery (F2D) Process works within Oracle Projects.
In the upcoming chapters, PMs will gain a better understanding of how to navigate and manage their
projects in Oracle Projects.
16
Q1FY10 Edition
CISCO CONFIDENTIAL
Chapter 2 - Introduction/Overview of Oracle Projects
Oracle Projects is an industry-supported account management tool that uses globally consistent
methodologies to generate transparent and accurate views of the financial health, business risk and
progress of all Cisco projects. It enables business tracking and offers financial reporting capabilities that
Cisco needs to service its Customers and move into new geographies and markets.
Roles refer to the official role that a person plays on a project in Oracle Projects such as Project
Managers, Project Coordinator (DST), Work Manager, etc.
Responsibilities refer to the access types to which each of these users is allocated in Oracle Projects. A
role may have more than one responsibility in Oracle Projects. For instance, a user with a Project
Manager role may have access to the following responsibilities:
To view the list of available Roles and Responsibilities, please refer to Chart A and Chart B of the
Appendix.
17
Q1FY10 Edition
CISCO CONFIDENTIAL
2.2.1 Logging in to Oracle Projects Steps at a Glance
To access the Oracle Projects production
environment, the user’s login information is 1. Navigate to the Oracle Projects Production link.
the user’s CCO user ID and password. http://wwwin-ts4cts.cisco.com:8083/
2. Click Apps Logon Links. The log on options for Oracle
Applications appears.
3. Click the E-Business Home Page link. The Sign In
Note: Cisco employees should be
screen appears.
able to use their Cisco ID as their CCO ID.
4. Enter your User Name and Password and press Enter.
If your CCO ID does not resolve, click on
The User Name is the individual’s CCO ID.
the Register link at http://www.cisco.com
5. Click on the appropriate Responsibility. The Oracle
to create a CCO ID. If you would like
Responsibility selected determines which Menu Options
detailed instructions, search for
are available to the user.
“Registering for a CCO ID” on the internal
6. Click on the appropriate Menu Option. The Menu
Cisco Employee Connection.
Options provide access to either Oracle Forms or Oracle
Projects screens.
Step Action
http://wwwin-ts4cts.cisco.com:8083/
2. Click Apps Logon Links. The log on options for Oracle Applications appears.
18
Q1FY10 Edition
CISCO CONFIDENTIAL
3
Step Action
3. Click the E-Business Home Page link. The Sign In screen appears.
Step Action
4. Enter your User Name and Password and press Enter. The User Name is the individual’s
CCO ID.
19
Q1FY10 Edition
CISCO CONFIDENTIAL
6
Step Action
20
Q1FY10 Edition
CISCO CONFIDENTIAL
7
Step Action
6. Click on the appropriate Menu Option. The Menu Options provide access to either Oracle
Forms or Oracle Projects screens.
21
Q1FY10 Edition
CISCO CONFIDENTIAL
When the project has been created in the system, the Project Home screen will appear. From this screen,
the user has access to various tabs, depending on their role and responsibility. The screenshot above
displays all the available tabs for a Project (with the exception of the Control tab, which is currently not
configured for use).
Project Tab
Under the Project Tab, Project Managers and Deal Support Team can:
• Review the Project overview by clicking on the Overview Tab. The overview includes
Organization, Project type, Project Status, Project Manager, Scheduled Start and Finish Dates
• View open notifications, resource requirements and upcoming resource changes
• Change the Project setup by clicking on the Setup Tab on the Blue Menu Bar
In the Blue Menu Bar under the Project tab, the following actions can be performed by the Project
Managers and Deal Support Team by clicking on the sub-tabs listed below. Only the Home, Overview,
22
Q1FY10 Edition
CISCO CONFIDENTIAL
Directory, Attachments and Setup sub-tabs in the Blue Menu Bar are necessary to complete PM duties.
The other sub-tabs are used by DST and other Cisco personnel.
Resources Tab
• Add requirements
• View team roles
• View open requirements
• Assign resources
• Change the resources set up
In the Blue Menu Bar under the Resources tab, Project Managers and Deal Support Team can perform
the following actions by clicking on the sub-tabs listed below. Only the Scheduled People sub-task in the
Blue Menu Bar sub-tabs is necessary to complete PM duties. The other sub-tabs are used by DST and
other Cisco personnel.
23
Q1FY10 Edition
CISCO CONFIDENTIAL
Workplan Tab
Under the Workplan tab, the Project Managers and Deal Support Team can:
In the Blue Menu Bar under the Workplan tab, Project Managers and Deal Support Team can perform
the following actions by clicking on the sub-tabs listed below. Only the Tasks sub-task in the Blue Menu
Bar sub-tabs is necessary to complete PM duties. The other sub-tabs are used by DST and other Cisco
personnel.
24
Q1FY10 Edition
CISCO CONFIDENTIAL
Control Tab
The functionality in the Control tab is currently not configured for use. Please do not use this tab.
Financial Tab
25
Q1FY10 Edition
CISCO CONFIDENTIAL
Reporting Tab
Chapter 2 – Summary
Within this chapter, PMs and DMs have learned how to navigate through the essentials of Oracle
Projects. PMs should now have a basic understanding of Oracle’s interface and tabs. Moving through
future chapters, this user guide will provide guidance on different activities throughout the project
lifecycle, with step-by-step screenshots.
26
Q1FY10 Edition
CISCO CONFIDENTIAL
Chapter - 3 Project Creation
Project Managers will learn how a project is created in Oracle Projects. The key action items from
Chapter 3 are:
• Project Managers will understand how the Deal Support Team creates a project after an
opportunity is registered.
• The information DST needs to create a project.
• How DST creates the Workplan after the project is created.
• What status each Transaction Project is created in.
• DST activities for Pre-Sales projects.
• How to manage your project in Pre-Sales.
• Why, when and how to manage your project’s Work at Risk.
Once the prerequisites are in place, the DST will take steps to create a project in Oracle Projects. The
Deal Support Team will:
27
Q1FY10 Edition
CISCO CONFIDENTIAL
• Set up a Customer in the created project
• Enter the Deal ID in the created project
• Project Name – DST enters a descriptive name for the project, following the naming
convention.
• Project Sub-type – Four sub-types: SOW – Milestone, Time & Expense (T&E), Subject Matter
Expert (SME) and Consulting.
• Project Manager – Either a Business Development Manager (BDM), Delivery Manager (DM)
or Project Manager (PM) (SP), as they will play the ‘PM role’ during the Pre-Sales phase of a
deal.
• Delivery Organization - The delivery organization, also called the project owning organization.
• End Customer Name – Customer whom the work is being delivered to.
• Project Start Date - project creation date.
• Sales Representative - The Sales person owning the SFDC opportunity.
• Project Coordinator - Deal Support Team member creating the project.
• Financial Analyst - The AS Finance person, responsible for the Operating Unit..
• Deal ID or Global Deal ID - Used for ‘Entity Deals’ where the deal is booked in one Operating
Unit, but the work is delivered in one or multiple work sites across different Operating Units.
For example, a deal may be booked in the US, but work for the same is to be delivered in the
US, EU and APAC. This type of deal has a single Global Deal ID, which is used for PID set-
up at each work site.
• Project Currency - Currency of the opportunity.
28
Q1FY10 Edition
CISCO CONFIDENTIAL
Default ‘Pipeline’ Status
The initial status of a Project is ‘Pipeline’ status. In ‘Pipeline’ status, Project Managers are able to define
resource requirements up front if necessary and assign resources in provisional status, though logging
time is not possible in ‘Pipeline’ status. Some types of Projects, such as CAP Projects, Internal Projects
and Admin Projects, are created immediately in ‘Active’ status.
29
Q1FY10 Edition
CISCO CONFIDENTIAL
Email Notification Sample
Project Status Notification for Pipeline Status: Project ID #, Deal ID#
Sent by: Ashley Matheus
Sent to: Brian Wong (Sales Representative), Melissa Leuck (Pre-Sales Engagement Manager),
Emma Gow (Delivery Manager) and Darren Shon (Project Manager)
Date sent on: April 3, 2008
Please notice that the Project ID # with Deal ID# has been created with the ‘Pipeline’ status and is
available for all the activities, follow-ups that are needed on this status.
Project Details
Deal ID # 346729
Project ID # 700097
Project Name #
Project Description #
Project Status Pipeline
Project Organization US Theatre
Project Type #
Sales Representative Brian Wong
Project Manager Darren Shon
Project Start Date #
Project End Date #
References
Project Home Page (Link)
30
Q1FY10 Edition
CISCO CONFIDENTIAL
3.3 Project Manager Activities for Pipeline and Pre-Sales Status
As described above, the default status for a new project is Pipeline status. Although time cannot be
charged against a project in Pipeline status, Project Managers may begin identifying and adding resource
requirements for the project.
Refer to 4.3.4 Resource Management for steps on how to create a resource requirement.
3.3.2 Pre-Sales
When a project is identified for Pre-Sales work, the Project Manager must complete tasks before the Pre-
Sales work can begin. For example, each Project Manager should update their Workplan, set up a Pre-
Sales Cost Budget, assign any Pre-Sales resources and change the project status from Pipeline to Pre-
Sales.
All the resources on the project will be logging time against the appropriate Pre-Sales sub-tasks. Once
Pre-Sales work is finished and the deal is ordered and booked, the Deal Support Team will begin the
process of project activation. The graphic below illustrates the Pre-Sales status in the overall project
lifecycle:
31
Q1FY10 Edition
CISCO CONFIDENTIAL
Changing Status from ‘Pipeline’
Steps at a Glance
to ‘Pre-Sales’
After PM update the Workplan and 1. From within the Project, click the Project tab.
create the Cost Budget for Pre-Sales, 2. Click Setup from the Blue Menu Bar. The Project Setup
each Project Manager must change the screen appears.
project status from Pipeline to Pre- 3. Click the Change Status button. The Change Status screen
Sales. To change project status to Pre- appears.
Sales, follow the Steps at a Glance on 4. Select Pre-Sales from the drop-down menu.
the right or the detailed steps and 5. Click the Apply button.
screenshots below:
2 1
Step Action
2. Click Setup from the Blue Menu Bar. The Project Setup screen appears.
32
Q1FY10 Edition
CISCO CONFIDENTIAL
3
Step Action
3. Click the Change Status button. The Change Status screen appears.
5
4
Step Action
Note: Upon changing the status of the Project to Pre-Sales, notifications are sent to the Sales
Representative, Pre-Sales Engagement Manager, Project Manager and Delivery Manager.
33
Q1FY10 Edition
CISCO CONFIDENTIAL
Project Manager Activities for Projects in ‘Pre-Sales’ Status
Once the Project has been created and properly set up by the DST, Project Managers can now perform
Pre-Sales activities on the Project, if it is deemed necessary.
Pre-Sales Workplan
Project Managers must ensure that all sub-tasks and dates are complete and accurate in their Pre-Sales
Workplan. Each Work Breakdown Structure (WBS) contains all the Project’s milestones and sub-tasks
within Oracle Projects.
In Transaction Projects, the three default areas for Pre-Sales work set up as sub-tasks of the Pre-Sales
task are:
• Customer Engagement
• Sizing and Scoping
• High Level Design
Transaction Dates reflect the time frame within which financial transactions in Oracle Projects can
happen. The main financial transactions are time entry and cost capture. Oracle Projects automatically
updates the Transaction dates to synchronize with Scheduled Dates when the workplan is published.
To allow resources to correctly log time against Pre-Sales sub-tasks, the sub-tasks must be chargeable
and the Scheduled Dates must be set by each Project Manager. PMs manage these Scheduled Dates
within the Workplan Tab of Oracle Projects.
The Deal Support Team will find all SOW templates in the tool, SOW builder. The output of the SOW
builder is not secured and does not make review by the Contract Review Team redundant.
Next to the SOW builder, theatre and deal type specific templates exist, also guaranteeing
standardization of all the contracts/quotes.
34
Q1FY10 Edition
CISCO CONFIDENTIAL
The SOW versions being reviewed by the Contract Review Team need to be stored in a consistent place,
Advanced Services Delivery Workspace – Content Management (ASDW-CM).
The final signed and countersigned SOW together with the pricing sheet will be stored in ASDW-CM by
the DST at time of project activation.
The SOW reference link will be stored directly in OP and no Project can be activated without this SOW
reference. Project Managers can view the SOW reference within the Project tab in Oracle Projects.
As good practice, this reference should contain the initials of the name of the author - customer name -
the PID - the version n°. Example: am/Dataport/X98362/01
Pricing
A unique pricing sheet exists for each theatre. Every project’s cost budget in OP will be set up at
activation, mimicking the costing elements. The Delivery Operations team in each theatre governs the
pricing sheet. Finance, along with the Delivery Operations team, will update these pricing sheets on a
regular basis, since Finance is responsible for the pricing guidelines.
Pricing sheets estimate the cost of Cisco resources and/or Partner resources.
35
Q1FY10 Edition
CISCO CONFIDENTIAL
mandatory, Finance encourages Project Managers to think upfront about how much effort should be
spent on Pre-Sales support and to monitor actual costs against the Cost Budget.
Note: PMs should validate their Workplan dates prior to updating the Pre-Sales Cost Budget
To create the Pre-Sales Cost Budget, add a Cost Funding Source and baseline the Cost Budget, follow
the Steps at a Glance at the above right or the detailed screenshots below:
1
1
Step Action
36
Q1FY10 Edition
CISCO CONFIDENTIAL
3
Step Action
3. Click the Project Sales Orders & Change Requests link. The Project Sales Orders &
Change Requests screen appears.
Step Action
37
Q1FY10 Edition
CISCO CONFIDENTIAL
5 6
Step Action
In the Book Date field, enter today's date (or really the date that the Pre-Sales cost budget
will be entered) in the format (DD-Mon-YYYY) i.e. 3-Jun-2009
Note: This screen allows for the entry of a date for the purpose of currency
conversion. Since the project is still in the Pre-Sales stage and does not have a Sales Order,
enter today's date (the date of the Pre-Sales budget) and a "dummy" value to represent that
this date is associated to a pre-sales budget. There is also a <Utilized Flag> that will identify
if our Pre-Sales date has been utilized.
Step Action
38
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
Step Action
10
12
11
Step Action
39
Q1FY10 Edition
CISCO CONFIDENTIAL
14
13
Step Action
When naming the Cost Budget, utilize the following naming convention:
14. Select Edit Budget from the Apply and drop-down menu then click the Go button.
15
Step Action
40
Q1FY10 Edition
CISCO CONFIDENTIAL
16
Step Action
16. Click on Expand All. To select a Pre-Sales task to budget, check the Select checkbox next
to the appropriate task.
Budgets are based on effort hours of a certain resource category (a Job title) that will
typically perform the Pre-Sales support, or based on a currency amount directly.
To set up the budget based on effort hours of a resource, select Add Resource from the
Select Project or task drop-down menu then click the Go button.
To set up the budget directly in currency amount, select Add as Planning Element from the
Select Project or task drop-down menu then click the Go button.
Steps at a Glance
Option 1 – Add a
resource to the 17. Select Add Resource from the Select Project or task drop-down menu and
budget in terms of then click the Go button then click the Apply button. The Select Planning
effort hours. Follow Resources screen appears.
the Steps at a Glance 18. Select one or several job titles to budget. Advanced Services Employee Labor
on the right or the is the generic job title with an average cost rate attached to it. The other job
detailed steps and titles have more granular cost rates. Click the Apply button. The Cost Planning
screenshots below. screen reappears.
19. Verify that the resource has been added under the Resources Selected
column. Click the Apply button.
20. Enter the Total Effort Hours. Click the Save button. To Set the Cost Funding
Source click on the Update Budget Line Details icon associated with each
budget line.
21. Expand the Additional Information section, select Cost Budget in the
Context Value drop-down menu. In the Cost Funding Source field, type ‘Pre-
Sales’ and hit Tab. Click the Apply button.
22. Click the Save button. Click the Submit button.
41
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
17
17
Step Action
17. Select Add Resource from the Select Project or task drop-down menu and then click the
Go button then click the Apply button. The Select Planning Resources screen appears.
19
18
Step Action
42
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
Advanced Services Employee Labor is the generic job title with an average cost rate
attached to it. The other job titles have more granular cost rates.
19. Click the Apply button. The Cost Planning screen reappears.
21
20
Step Action
20. Verify that the resource has been added under the Resources Selected column.
43
Q1FY10 Edition
CISCO CONFIDENTIAL
23
24
22
Step Action
24. To Set the Cost Funding Source click on the Update Budget Line Details icon associated
with each budget line.
44
Q1FY10 Edition
CISCO CONFIDENTIAL
26
25
Step Action
25. Expand the Additional Information section, select Cost Budget in the Context Value drop-
down menu. In the Cost Funding Source field, type ‘Pre-Sales’ and hit Tab.
Note: If the Pre-Sales cost is funded by another department, PMs should enter the Funding
Department in the Internal Cost Funding Department field. This is important as the cost transfer will
require follow up by Finance.
45
Q1FY10 Edition
CISCO CONFIDENTIAL
28 27
Step Action
46
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
17
Step Action
17. Check the Pre-Sales checkbox and select Add as Planning Element from the Select
Project or Task drop-down menu.
19
18
Step Action
18. Check that the Planning Element is assigned to the Pre-Sales top task.
19. Click the Apply button. The Edit Cost Planning Elements screen appears.
47
Q1FY10 Edition
CISCO CONFIDENTIAL
21
22
20
Step Action
20. Enter in the total budgeted amount for Pre-Sales in the Total Raw Cost field.
22. To set the Cost Funding Source click on the Update Budget Line Details icon associated
with each budget line. The Update Budget Line Details screen appears.
23
48
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
23. Expand the Additional Information section, select Cost Budget in the Context Value drop-
down menu.
24
25
Step Action
24. Click in the Search By field and click Go. The available cost funding sources are displayed.
26
49
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
26. Click the Apply button. The Edit Budget screen re-appears.
27
Step Action
27. From the Edit Budget screen, click the Submit button.
50
Q1FY10 Edition
CISCO CONFIDENTIAL
28
Step Action
29
30
Step Action
30. Click the Change Control icon to unlock the budget so that the Deal Support Team can
update it.
51
Q1FY10 Edition
CISCO CONFIDENTIAL
31
Step Action
Note: Project Managers will continue to update resources on the project through all phases of
the project, from ‘Pipeline’ through ‘Active’.
Identifying upfront resource requirements that will be needed for project delivery is encouraged,
especially if there is a high probability of the deal being ordered. In addition, the Project Manager may
continue to add resource requirements to check for available skills and time availability upfront.
Finally, successful project delivery requires the participation of multiple roles. It is important to identify
these required roles to ensure that a project is properly staffed. For example, a project may require
specific competencies or may involve a large number of resources. To avoid facing a lack of resources at
a later point in time, the Project Manager should identify candidates with specific required skill sets in
advance.
To perform the Pre-Sales work, resource requirements need to be defined and resources need to be
assigned to the Project.
Refer to 4.3.4 Resource Management for steps on how to create a resource requirement.
52
Q1FY10 Edition
CISCO CONFIDENTIAL
A Contract Review Team (CRT) is in place for all theatres: US/CAN, EU, EM, APAC (FYQ110) and
JAPAN (TBD).
Business guidelines driving the involvement of the CRT and correct execution of the MDM process are:
This part of the End-to-End (E2E) process impacts as well the Service Sales community as the
BDM/DM/PM (SP) community.
During the MDM approval process, the Revenue Policy Guidance and Determination (Rev PGD) team will
determine which revenue recognition methodology is to be applied to the Transaction deal that is
submitted for approval.
This information in particular must be captured in the MDM-tool by the Rev PGD team in easy to
understand terms and must be accessible to the DST. The DST will need this information in order to set
up the correct revenue events in OP as part of the financial set up of a delivery Project.
Revenue transfer
In case of revenue transfer (MEA – Multi Element Arrangement), the FMV (Fair Market Value) calculation
will also be defined during the MDM process. This FMV value for the AS portion of a deal will be subject
to an internal booking upon revenue transfer request and impact the revenue budget of the Project it
relates to.
SOW signature
Business guideline and process change:
Cisco Statements of Work should have two signatures (both Cisco and the Customer) for project revenue
recognition. By having both signatures it ensures a booking input quality element of a deal and not letting
book a Transaction Project order with a Statement of Work that is not signed by both the customer and
Cisco, issue resolution and delays when the first revenue needs to be recognized are avoided.
Signature of a SOW:
Electronic signature of Statement of Work via the Click to Accept (C2A) tool is described in the process
as preferred signature process that should be driven as much as possible.
53
Q1FY10 Edition
CISCO CONFIDENTIAL
E-Signatures are MANDATORY in EU and EM; however, e-signatures are not mandatory in the US, they
are highly preferred.
E-signature speeds up the process and supports the business rule that requires both signatures to be in
place before order entry.
In addition to that, e-signature reduces the number of input booking quality checks that need to be
performed before order entry: as the SOW version and MDM approval are checked before the SOW is
sent to the customer for signature via the Click to Accept tool (C2A) and the tool processes customer and
Cisco signature seamlessly the one after the other, a fully e-signed SOW file proves its quality by its e-
signed nature and no additional or duplicate checks need to happen when it is processed for order entry.
The C2A tool also captures clear workflow and signature dates and sends notifications to the
stakeholders to give full visibility.
The manual signature process will still be tolerated but must be discouraged as much as possible and
be the exception process. Even when manually signed, the Cisco signature is required before order entry!
The same business rule applies, regardless the way the SOW was signed.
Note: Project Managers cannot deliver on an engagement unless there is a Work at Risk in
place or a booked Sales Order (which is dependent upon an executed (counter-signed) SOW. When a
SOW is signed by both parties, it becomes a legally binding agreement where both parties agree to its
contents and may only be changed via the Change Request process.
54
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
2 1
Step Action
1. From within the Project, click on the Workplan tab.
2. Click on Tasks on the blue menu bar, select Update Current Working Versions from the
Actions drop-down menu.
Click the Go button.
Step Action
3. Click the Expand All link.
4. For all sub-tasks under the Pre-Sales task, as well as the Pre-Sales task, enter the current date
in the Scheduled Finish date field.
5. Republish the Workplan by clicking the Review and Publish button. The Review and Publish
screen appears.
55
Q1FY10 Edition
CISCO CONFIDENTIAL
6
Step Action
Project Managers should learn and remember the rules for processing and handling Work at Risk
Transaction Projects, since they are different from that of normal Transaction Projects.
56
Q1FY10 Edition
CISCO CONFIDENTIAL
• Control Pre-Sales task abuse
• Ensure that the required approvals are in place
• Ensure accurate time logging by setting up a non-billable task that is flagged as Work at Risk
• Capture the Cost Budget, allowed effort and funding source for Work at Risk
• Ensure that the allowed Cost Budget and the number of hours allocated are not overrun
No Statement of Work signed and countersigned yet 1. Seek internal approval according to Work at Risk
and no valid Purchase Order from customer or no approval matrix
Revenue Transfer agreed (no funding is secured). 2. Get a signed authorization to proceed, both internal
and customer signature
1. Seek internal approval according to Work at Risk
Statement of Work signed and countersigned, but no approval matrix
valid purchase order from customer or no Revenue
Transfer agreed yet (no funding is secured).
Statement of Work signed and countersigned, 1. Seek internal approval according to Work at Risk
purchase order or Revenue Transfer agreed, but no approval matrix
booking or Project activation.
Note: Before 2007, Advanced Services used to be called Professional Services. The name of the
agreement was not changed however.
• CAP Accounts: CAP Accounts are used for internal work with no funding source from the Client.
• Executive Commitment: Executive Commitment work is expense funded and involves delivery
of services for no charge, but requires an approval.
57
Q1FY10 Edition
CISCO CONFIDENTIAL
• Pre-Sales Work: Pre-Sales work does not involve delivering a service or providing deliverables
to the customer.
• Subscription Services: Subscription Services work that extends beyond the end date of a
Subscription is defined within the Service Agreement Expiration Policy – which allows for
continuation of services for up to 60 days beyond the service end date.
• Booking Process Exceptions: Any other exceptions to the booking should be escalated (such
as an extended SOW Booking Process).
• Monitor the actual vs. budgeted cost for Work at Risk using the Task Summary View under
the Reporting tab
• Manage the Work at Risk task like other Delivery tasks
• Once Work at Risk is over, end date the Work at Risk task to avoid further time from being
logged against the task
• Rename and publish the Workplan
58
Q1FY10 Edition
CISCO CONFIDENTIAL
The DST will create a cost budget line for the milestone under which a W@R sub-task is set up in OP,
reflecting the approved effort hours and/or $ amount and tag the cost funding source for this cost budget
line as ‘Work at Risk’.
In the Workplan, the standard delivery sub-task that is already tagged as W@R will be made chargeable
and the task duration (scheduled start and end dates) will be set to the approved duration. The work type
of this delivery sub-task must be set to Work at Risk.
All delivery hours will need to be entered against this sub-task. The name of the sub-task will refer to the
delivery work being performed, with the acronym W@R at the end.
The approval and - if applicable - ATP, will be stored in ASDW-CM by the DST and a link to these
documents will be added in the Project in OP.
OP will not prevent that actual cost exceeds the set cost budget for W@R, but any overrun will be visible
in reporting.
If a customer processes the order and the order gets booked, the DST will activate the project including
some additional steps:
The delivery sub-task that was tagged as ‘W@R’ will be end-dated at the project activation date
and another sub-task of the same milestone will be given the same name but without ‘W@R’ at
the end and have as start date the activation date. By doing so, any history on work at risk will be
kept in the project and remain consultable for BI purposes.
The work type of the W@R sub-task will be changed to ‘Customer Billable’ in order to correctly
categorize any hours that might still be logged against that task for days prior the activation date
and are not yet captured at activation.
Re-allocation of all hours already logged with the ‘Work at Risk’ Work type before project
activation will need to be performed via a back-end process (mass adjustment).
This way, resources on a project will be able to log their time seamlessly to the correct delivery task and
the utilization metrics – driven by the Work Type of a task – will give correct figures at any time.
Note: No deliverables can be provided to the customer under W@R. So while work can be done
to start a deliverable, a final deliverable as output cannot be provided to the customer.
Chapter 3 - Summary
In Chapter 3, Project Managers have learned all about the Project Creation process. Project Managers
should know the basic steps that the Deal Support Team takes to create a project after an opportunity is
registered, what information the DST uses to create each project, what items will be in a newly created
Workplan, DST’s activities and PM responsibilities in Pre-Sales and how to identify and manage any
Work at Risk.
In the coming chapters, Project Managers will learn how to manage their activated projects within Oracle
Projects, with additional step-by-step screenshots.
59
Q1FY10 Edition
CISCO CONFIDENTIAL
Chapter 4 - Project Activation
After the DST creates the project and Pre-Sales work has been completed, if it was necessary, the DST
will move the project status to ‘Active’. Project Managers may start delivery of the project to the customer
when it is in ‘Active’ status.
If there is already a PID because AS Delivery was involved for Pre-Sales, the same Project will become a
delivery Project. In case there was no AS involvement for Pre-Sales a new Project will be created before
the order is entered in ERP by CS.
The service order in ERP will reference the PID on as well order as order line level.
• Project Managers will learn how the DST activates their Project.
• The differences between the Cost/ Revenue Budgets and Forecasts.
• How to update Project Manager information
• Project Managers will learn how to link documents and hyperlinks in Oracle Projects.
• PMs will learn who receives notifications when a project is activated.
• Project activation checklist for Project Managers.
• How Project Managers can update the team members on their Projects.
• DST activities for Project activation.
• Project Managers will learn how to update their Workplan, cost forecasts, revenue forecasts and
partner tasks.
• How to publish your updated Workplan and forecasts.
• How Project Managers can manage resources on their Projects.
Activating a project consists of a series of activities in Oracle Projects by the DST. Once the order is
received and booking requested, the Deal Support Team begins by checking the booking input quality to
avoid error corrections later on in the booking process. For example, it is essential that the submitted
SOW or contract is approved in My Deal Manager (MDM) or that the amounts on the Sales Order and
Quote match. If there are errors in the booking input quality, the Deal Support Team will not transmit the
order to Customer Service for booking. The SOW needs to be signed by the Customer and countersigned
by Cisco before booking to avoid revenue recognition issues later in the process.
Once the order is fully booked, the Deal Support Team begins setting up the project for activation in
Oracle Projects. The Deal Support Team starts this process by:
60
Q1FY10 Edition
CISCO CONFIDENTIAL
• Closing Pre-Sales sub-tasks (if the Project Manager has not already closed them) and re-
publishing the Workplan
The Deal Support Team also sets up the project Financials by:
61
Q1FY10 Edition
CISCO CONFIDENTIAL
The Deal Support Team utilizes the Booking Assurance Checklist to validate that the order received is
ready to be booked. If the booking criteria are met, the Deal Support Team processes the order and
related documents to Customer Service for order entry, releases the booking hold and follows up until the
order is fully Cisco booked.
The Deal Support Team also sets up and publishes the Work Breakdown Structure in Oracle Projects for
the Project Manager to perform any necessary Pre-Sales activities. Prior to activation, the Project
Manager should close out the Pre-Sales task and all Pre-Sales sub-tasks. If the project still has an open
Pre-Sales task, it is the Deal Support Team’s responsibility to close all Pre-Sales tasks associated with a
project as soon as a project is ready to be activated. The DST closes any open Pre-Sales tasks by
ensuring the Scheduled Finish Date of the sub-tasks have the same date as the project activation date.
Beginning on the activation date, time can no longer be entered against Pre-Sales sub-tasks.
Most importantly for the Project Manager, the Deal Support Team validates and assigns the correct
Project Manager to the project prior to activation. Oracle Projects only allows one Project Manager role to
be defined for a project. In most cases, during the ‘Pre-Sales’ and ‘Active’ phases of a project, this role is
performed by different people. In any case, a Project Manager is required to be on a project at all times.
62
Q1FY10 Edition
CISCO CONFIDENTIAL
The Project Manager’s project revenue in the Revenue Forecast is generated from revenue events. The
Revenue Forecast reflects the revenue recognition distribution schedule for the project. Each time the
schedule and estimated Milestone completion slips, the Project Manager needs to update the Revenue
Forecast on a minimum of every 2 weeks per policy.
Uploading Documents to
Steps at a Glance
Advanced Services Delivery
Workspace-Content 1. Navigate to ASDW-CM. Enter the appropriate Category
Management (ASDW-CM) Selection fields and click the Confirm Selection button.
2. Enter the appropriate Account Name and Project Id
information.
To upload documents to ASDW- 3. Click the Confirm Selection button.
CM, follow the Steps at a Glance 4. Choose the appropriate File and enter the required information
or the detailed steps and for the document.
screenshots below: 5. Click the Submit button when finished.
63
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
1. Navigate to ASDW-CM.
Enter the appropriate Category Selection fields and click the Confirm Selection button.
Step Action
64
Q1FY10 Edition
CISCO CONFIDENTIAL
4
Step Action
4. Choose the appropriate File and enter the required information for the document.
Note: Project documents are 1. From within the Project, click the Project tab.
not stored directly into Oracle Projects. 2. Click Attachments from the blue menu bar. The Attachments
They are first stored in the document screen appears.
repository (ASDW-CM) and then 3. Click the Add Attachments button.
attached as a hyperlink in Oracle 4. Enter the description of the attachment in the Description field.
Projects. It is optional to select a category from the Category drop-down
menu.
To attach a document link in Oracle 5. In the Define Attachment section, select the URL radio button.
Projects, follow the Steps at a Glance Enter the URL to the document in the URL field.
or the detailed steps and screenshots 6. Click the Apply button. The Attachments screen appears.
below: 7. From the Attachments screen, the link to the documents is
listed.
65
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
2. Click Attachments from the blue menu bar. The Attachments screen appears.
Step Action
66
Q1FY10 Edition
CISCO CONFIDENTIAL
7
Step Action
Activating a Project
Once all the preconditions are met and Project activation activities are completed, the Deal Support Team
changes the Project status to ‘Active’ and notifications are sent out to the following individuals:
Unlike a traditional customer funded project, where there is a Sales Order booked, a Revenue Transfer
Project uses an Internal Service Booking method.
A Revenue Transfer must be requested by the Service Account Manager once the product is booked and
shipped.
A Partial Revenue Transfer – For deals that are partially Customer funded and partially Revenue
Transfer funded. The Project is set up with two Billing Accounts: one external Customer and one internal
Cisco Customer. There is also two Sales Orders with different Bill To Customers. The End Customer is
the same for both Sales Orders. The Contribution % is split between both according to the proportion
each Bill To Customer contributes to the revenue.
4.2.3 Project Activation for CAP Projects with Cost Budget Only
A Critical Accounts Program (CAP) Project is created when there is a serious issue on a project and the
Customer relationship may be at risk. A CAP Project is created to compensate for any serious issues on
an existing project and is not charged to the Customer. The Delivery Manager requests a CAP Project,
which then goes through an approval process. Since the CAP Project is not charged to the Customer, it
has a Cost Budget only and is funded by an Internal Funding Source. Once the CAP Project is approved,
the Deal Support Team creates the CAP Project in Oracle Projects.
Note: Although a CAP Project can be identified from an existing project in delivery, the CAP
Project is a separate project.
4.3 Processing the Project Handoff from the Deal Support Team
Once a project has been activated, the project is officially owned by the designated Project Manager and
project execution activities can begin.
Project Managers should also verify that team members, such as the Project Manager, Delivery Manager,
Finance and any other project team members are listed correctly. If team members are incorrect or not
listed, the project team member screen needs to be updated accordingly.
Note: If a team member is incorrectly listed on the project, the team member must be deleted and
then a new team member must be added in their place.
Since there can only be one Project Manager on a project, knowing how to replace a team member in
Oracle Projects becomes important when, for example, the Project Manager goes on vacation. In this
case, another team member must be identified and added as a Work Manager in Oracle Projects. A Work
Manager has generally the same access permissions as the Project Manager. This way, project delivery
work can continue.
Project Managers can also add another Project Manager to the project for the time they are away by
defining start and end dates of team member assignments. Oracle Projects only allows one ‘Active’
Project Manager at a time; for the identification of Work Managers, there is no limitation. When identifying
68
Q1FY10 Edition
CISCO CONFIDENTIAL
a second Project Manager, the first one remains on the list and the end date for the first Project Manager
is set to the day before the creation date of the second Project Manager.
Adding someone as a Work Manager during the Project Manager’s time out of the office is the preferred
method, since it is easier to manage.
Note: Adding a team member to the project is not the same as adding a resource in the
Resource Management tab. Team members will not necessarily perform delivery work on the project,
whereas assigned resources will.
69
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
1. Click the Project tab.
2. Then click Setup from the blue menu bar. The Project Setup screen will appear.
Step Action
3. At the bottom of the Project Setup screen, click the Team Members link, the Team
Members screen appears.
70
Q1FY10 Edition
CISCO CONFIDENTIAL
4
Step Action
4. Review the team members listed. Click on the Delete icon for a team member that is
incorrect. The Warning: Delete Team Member? screen displays.
Note: Project Managers should only delete the team member if they haven't
actually performed any tasks on the project and did not work on the project. If a team
member who was working for the last month and is no longer working on the project,
PMs should end date their role on the page.
5. Click the Yes button. The Team Members screen will reappear. The team member has
been removed from the project team.
Step Action
6. Click the Add Team Members button. The Add Team Members screen appears.
71
Q1FY10 Edition
CISCO CONFIDENTIAL
7
8
Step Action
7. Enter the following information:
• Person
• Role
• Start Date
• End Date
In the Start Date field enter today’s date. Leave the End Date field blank. Ensure the
Scheduled Member check box is checked.
Note: There are a lot of roles available in OP; however, Not all of them are
schedulable. When adding a schedulable role, PMs will be blocking time on that
resource’s calendar. Operations, DST, Finance, Delivery Managers, Sales and PMs will
not be marked as schedulable. To get an updated list of schedulable resources, just click
on the flashlight icon to search.
8. Click the Apply button. The team member has been added to the project team.
The deal documents will be uploaded into ASDW-CM and a link to those documents captured in OP.
72
Q1FY10 Edition
CISCO CONFIDENTIAL
The project will be set to an 'Active' status and AS Delivery will be able to start delivering billable work
from that moment on.
For project activation though, we need to capture the correct End Customer information as well as the Bill
to Customer information.
There is a difference between OP and ERP terminology, especially as to the meaning of the ‘Ship to’
field. In OP, the Ship to field is used to store End Customer information. In ERP, both Ship to and End
Customer information can differ from each other.
In the Billing Account information in OP, the main and Ship to customer name and number should always
be the same.
In case of revenue transfer, the Bill to customer will be the internal customer used for the internal booking
of the revenue transfer (see Revenue transfer section)
Customer relationship
The Relationship must always be set to End Customer, as this is the relationship that is most important
for Delivery. Other options in OP should not be used.
Contribution
Contribution means the % the Bill to customer contributes to the revenue of the project. This should
always be set at 100% for one customer.
If there is one End Customer with multiple work sites, only one Billing Account should be created. Work
Site information is a Task attribute in OP and can be captured in the Tasks details.
• Tasks – The tasks that are displayed in the Workplan with sub-tasks listed under them. Tasks
cannot be set to chargeable and thus cannot have time logged against it.
• Sub-tasks – The sub-tasks are under its respective task. Sub-tasks can be set to chargeable so
that time can be logged against them.
• Milestones – Milestones are a type of task that aligns with the Milestones listed on the SOW
required to deliver the project. Milestones contain delivery sub-tasks that the Project Manager
handles to manage the Project. Time is logged against the delivery sub-task and the total actual
hours are rolled up to the respective Milestone.
73
Q1FY10 Edition
CISCO CONFIDENTIAL
Milestone
Sub-task
Peer tasks refer to the tasks placed at the same level of hierarchy. For example, all sub-tasks placed
under a Milestone are peer tasks.
Once a Sales Order is created for a specific project and that order is linked to the project in Oracle
Projects, the Deal Support Team maps the initial Work Breakdown Structure (WBS) to tasks that need
completion, as dictated in the SOW and Pricing sheet. The Deal Support Team then updates and
publishes the initial WBS so that it takes effect in Oracle Projects.
Once the Project Manager takes ownership of the project, the Project Manager updates the initial WBS.
This update will mainly consist of adding/copying sub-tasks where needed, renaming them, making sub-
tasks chargeable/not chargeable and managing the Scheduled start and finish dates.
Adding/Copying Sub-tasks
To add additional sub-task to the Steps at a Glance
Workplan, the Project Manager
1. From the Update Tasks screen, select the desired sub-task to
should mainly be using the Copy
copy and click the Copy button. The Copy screen appears.
function to add another sub-task. To
2. In the Copy section, make sure all check boxes for tasks and
copy an existing sub-task, follow the
sub-tasks are checked.
Steps at a Glance on the right or the
3. Select the As a Peer Task radio button. Enter the desired prefix
detailed steps with screenshots
for the sub-task name in the Prefix field.
below:
4. In the Placement section, select where to paste the copied sub-
task. Ensure that the correct location for the sub-task is
selected.
5. Click the Apply button.
6. Update the Task Number in the Task Number in accordance
with the sequencing.
7. Select Continue Updating from the Apply and drop-down
menu.
74
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
1. From the Update Tasks screen, select the desired sub-task to copy and click the Copy
button. The Copy screen appears.
Step Action
75
Q1FY10 Edition
CISCO CONFIDENTIAL
2. In the Copy section, make sure all check boxes for tasks and sub-tasks are checked.
Enter the desired prefix for the sub-task name in the Prefix field.
Step Action
6. Update the Task Number in the Task Number field in accordance with the sequencing.
76
Q1FY10 Edition
CISCO CONFIDENTIAL
Deleting Sub-Tasks
The Deal Support Team reviews the SOW to determine
the required Milestones for the project. Based on the Steps at a Glance
SOW, the Deal Support Team copies the required
1. From within the Project, click on the
Milestones. Each Milestone contains one Delivery sub-
Workplan tab.
task by default. The Deal Support Team sets up the
2. Select Update Current Working
task names and task numbers of all the required
Version from the Apply and drop down
Milestones (but not the sub-tasks) as per the SOW.
menu. Click the Go button.
Project Managers must update the task names and
3. From the Update Tasks screen, click the
task numbers of the sub-tasks. They can add new sub-
Expand All link.
tasks under a Milestone by copying from the existing
4. Select the check boxes next to the sub-
sub-tasks. They can also delete the redundant sub-
tasks to delete. In this example, the
tasks, but not the default sub-tasks. The Project
Work at Risk sub-task is selected.
Managers cannot, however, add or delete a Milestone
5. Click the Delete button.
in the WBS. If new Milestones are required, the Project
6. A message appears indicating that the
Managers will be required to raise a Change Request
update has been made. The selected
and forward it to the Deal Support Team requesting
sub-task is deleted.
them to update the WBS to reflect the increase in
project scope.
2
5
3
Step Action
77
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
2. Select Update Current Working Version from the Apply and drop down menu. Click the
Go button.
3. From the Update Tasks screen, click the Expand All link.
Step Action
6. A message appears indicating that the update has been made. The selected sub-task is
deleted.
78
Q1FY10 Edition
CISCO CONFIDENTIAL
Financial Tasks are tasks that allow cost capture. Tasks generated from a template are automatically set
as Financial Tasks. A copied top task and Level 1 sub-task will be automatically set as a Financial Task
to enable cost capture and/or time entry, so Project Managers do not need to update anything.
Partner Tasks
The Deal Support Team is responsible for creating Partner tasks on the Workplan. Partner tasks are
created for cost capture purposes only and not for time logging purposes.
The Project Manager needs to track the Partner Task progress (if using a Partner to complete delivery
work) and enter the percentage of work complete in Oracle Projects. Finance uses the percentage of
work complete to calculate accruals.
Workplan Publishing
Publishing a working version of a
Workplan makes the Workplan Steps at a Glance
visible to team members. If a
1. From with the Workplan tab, select Update Current Working
Workplan is created but not
Version from the Apply and drop down menu. Click the Go
published, the Project Manager
button.
will be the only person able to
2. Click the Expand All link.
view the Workplan and it will
3. Click the Update pencil on Outline Number 0.
remain a working version. The
4. Delete the word, ‘Copy’, from the beginning of the Workplan
Workplan must be renamed to
name and update the version number accordingly. The following
align with the Workplan naming
naming convention must be applied for the naming of the WBS
convention prior to being
version at activation: <PID>:”Workplan Activation” :< version>.
published every time. After the
Example: 700596:Workplan Activation:v1.
PM publishes the Workplan, all
5. Click the Apply button. The Update Tasks screen appears.
team members will be able to see
6. Click the Review and Publish Workplan button
the updated version as well as be
7. Click the Publish button.
able to log time to any new sub-
8. The Workplan Publishing screen appears. Wait for the screen to
tasks specified in the published
update, it may take anywhere from a few moments to a couple
version.
minutes.
To publish a Workplan, complete 9. Click Change Control lock to unlock the Workplan. The
the Steps at a Glance on the right published version of the Workplan will appear in the Published
or the detailed steps with Versions on the bottom half of the screen.
screenshots below:
79
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed steps with screenshots
Step Action
1. From with the Workplan tab, select Update Current Working Version from the Apply and
drop down menu. Click the Go button.
Note: If a warning message displays stating: You do not have the security to access
this page. Please contact your system administrator. It means that the Workplan has been
locked by another user. Click the Ok button and then the system will take them to the
Maintain Versions screen where they can see who locked the Workplan and contact them to
unlock it.
80
Q1FY10 Edition
CISCO CONFIDENTIAL
2
Step Action
Step Action
81
Q1FY10 Edition
CISCO CONFIDENTIAL
4
5
Step Action
4. Delete the word, ‘Copy’, from the beginning of the Workplan name and update the version
number accordingly.
The following naming convention must be applied for the naming of the WBS version at
activation:
82
Q1FY10 Edition
CISCO CONFIDENTIAL
6
Step Action
Step Action
83
Q1FY10 Edition
CISCO CONFIDENTIAL
8
Step Action
8. The Workplan Publishing screen appears. Wait for the screen to update, it may take
anywhere from a few moments to a couple minutes.
Step Action
9. Click Change Control lock to unlock the Workplan. The published version of the Workplan
will appear in the Published Versions on the bottom half of the screen.
84
Q1FY10 Edition
CISCO CONFIDENTIAL
Workplan versioning
Versioning of the Workplan must be enabled as we want to trace back the different versions over the life
of the project.
OP will automatically make a working copy of the latest published version. Any changes can be made to
the working copy and the Workplan can be republished if needed.
The following naming convention must be applied for the naming of the WBS version at activation:
This cost is typically defined in terms of effort hours per role per milestone and can also contain estimated
Partner cost and/or T&E cost separately.
The number and kind of roles used to price AS-T differs per theatre and so do the cost rates associated
to the roles.
In order to create a correct Cost Budget in OP, the correct roles or ‘jobs’ need to be set up for all
operating units (and might differ per theatre), the cost rates as used for pricing will need to be set up (and
differ per theatre). Cost rates used for pricing differ from the cost rates used for actual cost calculation.
Adding the PID in front of the name is needed to make the Cost Budget unique and thus avoids data
issues in reporting.
• one per Milestone with estimation of the effort hours per role/job as mentioned on the pricing sheet
– OP will calculate the amounts based on the cost rate of these roles/jobs
• one per Partner task in terms of amounts - if Partner cost was estimated in the pricing sheet
• one for T&E in terms of amounts - if this cost has been evaluated separately on the pricing sheet
If a Pre-Sales cost budget was created earlier, the Cost Budget version created and baselined at
activation may no longer include this cost budget line; the cost budget line for Pre-Sales – if any- will need
to be deleted.
85
Q1FY10 Edition
CISCO CONFIDENTIAL
Example: Effort hours for two roles and two milestones + Partner cost
Cost Budget calculated based upon the cost rates of the roles and effort hours
For example:
86
Q1FY10 Edition
CISCO CONFIDENTIAL
When – from the revenue side – a project is 100% customer funded or 100% funded based upon revenue
transfer, all cost budget lines will have ‘revenue budget’ as cost funding source.
When additional work has been agreed where the customer is not willing to pay for, an additional
milestone will be created in the Workplan, an additional cost budget line will be created linked to that
additional milestone and the cost funding source for that cost budget line will be Internal – cost transfer.
When ‘Internal’, the department number of the department bearing the cost will need to entered in order
to realize the cost transfer correctly once the project is closed.
The Cost Budget will only be changed and re-baselined upon an approved and signed Change Request –
addendum of the SOW - that resulted in an additional booking, an approved revenue transfer or an
approved internal funding (cost transfer).
In order to do so, there will be a Cost Forecast Plan created in OP where the PM will need to do the
updates.
The initial Cost Forecast plan will be created by the DST copied from the baselined Cost Budget and will
be an exact copy of that baselined Cost Budget.
87
Q1FY10 Edition
CISCO CONFIDENTIAL
Steps at a Glance
The PM can add named resources
as planning elements in order to 1. From within the Project, click on the Financial Tab.
estimate the ETC effort in a more 2. Click on the Maintain Versions icon of the AS Cost Forecast. The
granular way. This will give him Maintain Forecast Versions screen appears.
more accurate Estimate at 3. Click the Edit icon of the current working Cost Forecast.
Completion (EAC) cost as the 4. In the Actions drop-down menu, select Generate Forecast and
effort hours will be multiplied by click the Go button. This will update the data and pull in actuals.
the actual cost rate as set up in The Generate Forecast Amounts screen appears.
OP for that named person.
5. Click the Generate and Edit button to pull in all the actuals. The
To update and publish the Cost Processing Generate Forecast Amounts screen appears.
Forecast, follow the Steps at a 6. Update the Forecast Quantity amount for any tasks that will
Glance on the right or the detailed require more or less effort hours.
steps with screenshots below: 7. In the Actions drop-down menu, select Generate Forecast and
click the Go button. This will update the data and pull in actuals.
The Generate Forecast Amounts screen appears. Click the
Generate and Edit button to apply to the project functional
currency. The Processing Generate Forecast Amounts screen
appears.
8. Click Save to save changes made to the Cost Forecast.
9. In the Actions drop-down menu, select Maintain Forecast
Versions and click the Go button. The Maintain Forecast Versions
screen appears.
10. Click the Details icon.
11. Click the Edit button.
12. Update the version number in the Name field to align with the Cost
Forecast naming convention: <PID>: <’Cost Forecast’>: v<Version
Number> Example: 700130: Cost Forecast: v2.
13. Click the Apply button.
14. Click the Maintain Forecast Versions link.
15. Click the Change Control icon.
16. Click the Submit icon.
17. Click the Approve icon. The Cost Forecast has now been
updated.
88
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
1. From within the project, click on the Financial Tab.
2. Click on the Maintain Versions icon of the AS Cost Forecast. The Maintain Forecast
Versions screen appears.
Step Action
3. Click the Edit icon of the current working Cost Forecast.
Note: If there are multiple working versions, the Project Manager must be sure to edit the current
version of the Cost Forecast. To change which working version is the current version, select the Set to
Current option from the Select a Version drop-down menu. The version cannot be set to current if
another working version is submitted but still pending approval.
89
Q1FY10 Edition
CISCO CONFIDENTIAL
4
Step Action
4. In the Actions drop-down menu, select Generate Forecast and click the Go button. This
will update the data and pull in actuals. The Generate Forecast Amounts screen appears.
90
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
5. Click the Generate and Edit button to pull in all the actuals. The Processing Generate
Forecast Amounts screen appears.
8 7&9
Step Action
6. Update the Forecast Quantity amount for any tasks that will require more or less effort
hours.
7. In the Actions drop-down menu, select Generate Forecast and click the Go button. This
will update the data and pull in actuals. The Generate Forecast Amounts screen appears.
Click the Generate and Edit button to apply to the project functional currency. The
Processing Generate Forecast Amounts screen appears.
8. Click Save to save changes made to the Cost Forecast.
9. In the Actions drop-down menu, select Maintain Forecast Versions and click the Go
button. The Maintain Forecast Versions screen appears.
91
Q1FY10 Edition
CISCO CONFIDENTIAL
10
Step Action
10. Click the Details icon.
11
Step Action
11. Click the Edit button.
92
Q1FY10 Edition
CISCO CONFIDENTIAL
12
13
Step Action
12. Update the version number in the Name field to align with the Cost Forecast naming
convention:
14
Step Action
14. Click the Maintain Forecast Versions link.
93
Q1FY10 Edition
CISCO CONFIDENTIAL
15
Step Action
15. Click the Change Control icon.
16
Step Action
16. Click the Submit icon.
Note: If the Submit button is not available on this screen or on the Maintain Versions screen, it is
because the Cost Forecast that is being updated is not the Current Working Copy. Make sure that the
Cost Forecast that is being updated is the Current Working Copy. To set a Cost Forecast as a Current
94
Q1FY10 Edition
CISCO CONFIDENTIAL
Working Copy, go to the Maintain Versions screen and select the required version. Next, select the Set to
Current option from the drop-down menu and click the Go button. Finally, lock the Cost Forecast version
by clicking the Change Control icon. The Submit button will now be available.
17
Step Action
17. Click the Approve icon. The Cost Forecast has now been updated.
95
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
2 1
Step Action
1. From within the project, click on the Financial Tab.
2. Click on Percent Complete from the blue menu bar.
Step Action
3. Update the As of Date and the Physical % Complete fields for the appropriate Partner
Task.
4. Click the Save button.
96
Q1FY10 Edition
CISCO CONFIDENTIAL
Funding Agreement
For SME, T&M and Consulting engagements, the funding agreement will be set at project level.
Multiple funding agreements from the same or from different customers can be set up for one single
project. For example: in case of a change request that is funded by the customer and additional funding
agreement will be set up for the additional milestone on the same project.
Revenue Budget
The Revenue budget will be directly created and baselined from the funding agreement. This way we
guarantee that the data between the agreement and the revenue budget fully match.
The Revenue budget will be locked and will only be changed upon approved change request (addendum
to the SOW) for which an additional booking happened. An additional booking will only happen when the
customer agrees to fund extra work and issues an order, or when the extra work is funded via approved
revenue transfer that resulted in an internal booking of revenue. Customer funding and Revenue transfer
are the only revenue related triggers.
The billing events will be set up in order to reflect the invoicing schedule.
The revenue events will be set up in order to reflect the revenue schedule.
Each event is linked to a top task of the WBS of the project (which represents the financial milestones)
and has an amount and a date.
Billing events
SOW – milestone (MDM will note “Milestones” or “Completed Contract”)
One billing event per sales order line will be created. As each milestone must correspond to one sales
order line representing the amount that will be subject to a separate invoice and has an invoice hold
applied to it in ERP. The amount of the billing event will need to match the SO line amount.
The billing event dates will be left blank at this time and be updated later: the invoice will be sent to the
customer once the Milestone Completion Certificate (MCC) for the milestone is signed-off by the
customer and validated by the Revenue Accounting Operations team (RAO). The RAO team will update
the corresponding billing event date with the date they released the invoice hold in ERP.
One billing event per month for the duration of the engagement needs to be created. The total amount of
the deal can be entered in the billing event of the last month only; amounts of other events can be left 0.
The billing event dates need to remain blank.
97
Q1FY10 Edition
CISCO CONFIDENTIAL
Once the timesheet for the first month will be signed off and validated by the Revenue Accounting
Operation’s team (RAO) team, they will fill in the date of the invoice as well as enter the invoiced amount
on the first event and enter the remaining amount on the last event. Each month this process will be
repeated.
[This set up should be fine because we’re essentially setting up “dummy data” and RAO will true up
based on actuals.
Example: If a timesheet isn’t turned in every month, but instead every other month, we will only invoice
every over month.
Invoicing happens upfront at time of booking for the whole engagement. Only one billing event needs to
be set up with the booking date and the total booked amount.
For any SME engagement where T&E is invoiced separately and captured in a separate order line, one
extra billing event needs to be created linked to the T&E task of the Workplan. When there is an invoicing
schedule for T&E, one billing event per invoice needs to be created. If this is not known at time of
activation, one billing event needs to be created always and others can be added later.
Consulting
Invoicing happens upfront at time of booking for the whole engagement and only one billing event needs
to be set up with the booking date and the total booked amount.
The number of billing events needs to align to the invoicing schedule in the contract. In most of the cases
invoicing happens quarterly, which means one billing event per quarter needs to be set up, the total
booking amount distributed evenly over the number of events.
To view the Summary table of billing events, please refer to Chart C of the Appendix.
Revenue events
The number of revenue events to be set up will depend upon the revenue recognition methodology
applicable for the project subtype.
For SOW-milestone engagements there are multiple scenarios possible, which are decided per
engagement by the Revenue PGD team during the MDM (My Deal Manager) approval process:
• Milestone based revenue recognition: revenue will be recognized upon customer sign-off of each
Milestone Completion Certificate (MCC) that is validated by the RAO team
• Completed contract revenue recognition: revenue will be recognized when the delivery work is fully
completed according to the SOW. This means that all revenue will be recognized upon customer
sign-off of the last MCC that is validated by the RAO team, even if the invoices have been sent at
the completion of earlier milestones.
• Revenue recognition Site by Site (EUEM): revenue will be recognized at the completion of the group
of milestones related to one Site (‘partial segmentation’).
98
Q1FY10 Edition
CISCO CONFIDENTIAL
For all AS-T engagements, the DST will need to check in the MDM tool which revenue recognition
methodology is applicable for the particular project that they are activating.
Dates for Revenue events cannot be left blank as OP requires some date in order to be able to generate
a revenue forecast plan from the events. As the date on the revenue events will process the revenue to
become actual revenue in OP, we must be careful not to let this happen too early. To minimize this risk
and as agreed with global AS Finance, the DST will put the booking date + 1 year as revenue event date.
The dates will be changed by the RAO team to the dates the revenue was released in the General Ledger
when the revenue can actually be released after milestone completion or project completion.
99
Q1FY10 Edition
CISCO CONFIDENTIAL
events are a translation of this methodology.
Apart from generating the Revenue Forecast Plan and saving it as approved initial version, the DST will
not need to do additional set ups.
Note: Forecasting is set up to happen for the future only. In OP terms that means: for the future
fiscal months and not for the current fiscal month. PM's can forecast for the current fiscal month when - in
the Edit screen - they click on Actions drop down, edit planning options, click on the Generation options
link, change the top drop down to 'prior period' and click apply.
To make the updates to the Revenue Forecast follow the Steps at a Glance above or the detailed steps
with screenshots below:
Step Action
1. From within the project, click on the Financial Tab.
2. Click on the Maintain Versions pencil icon in the AS Revenue Forecast line.
100
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
3. Click on the Edit icon on the current working version of the Revenue Forecast.
Step Action
4. In the View drop-down menu, select Edit Revenue Forecast and click the Go button.
5. Click on the Update Forecast Line Details icon in the first Milestone line.
8
9
10
101
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
6. Edit the Forecast Start and End Dates to match the project delivery Start and End Dates.
7. In the Spread Curve drop-down menu, select Fixed Date and enter the date revenue is
estimated to be recognized within the Forecast Start Date and Forecast Finish Date.
Note: Consulting and SME Project revenues are recognized proportionally over
time. For these Projects, the Spread Curve in the Revenue Forecast is not a Fixed Date, but
should be set to Even. Oracle Projects then automatically calculates and evenly distributes
the amount to be recognized each month for the duration of the specified engagement
period.
8. Expand the Additional Information section.
9. Select Revenue Forecast from the Context Value drop-down menu. Then enter Commit or
Upside in the Rev Forecast Probability field.
10. Click the Apply button.
11
Step Action
11. Click the Edit icon of the Milestone to check the fiscal month in which the revenue is
estimated to be recognized. The Edit Forecast Line screen appears.
102
Q1FY10 Edition
CISCO CONFIDENTIAL
13
12
Step Action
12. Select the check box of the fiscal month in which revenue is estimated to be recognized.
13. Click the Maintain Forecast Versions link.
14
Step Action
14. Click the Details icon.
103
Q1FY10 Edition
CISCO CONFIDENTIAL
15
Step Action
15. Click the Edit button.
18
17
16
Step Action
16. Update the version number in the Name field to align with the Revenue Forecast naming
convention:
104
Q1FY10 Edition
CISCO CONFIDENTIAL
19
Step Action
19. Click the Change Control icon.
20
Step Action
20. Click the Submit icon.
105
Q1FY10 Edition
CISCO CONFIDENTIAL
21
Step Action
21. Click the Approve icon. The Revenue Forecast has been updated.
106
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
1. From within the project, click the Reporting Tab.
2. Select Periodic Summary from the View drop-down menu and click the Go button.
Step Action
107
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
3. On the Periodic Summary screen, click the Profitability link. The revenue schedule of the
entire project is displayed.
Update PM role
The person being responsible as PM for the Project in the Pre-Sales phase will not typically be the same
as the person responsible for the delivery work.
From the moment a Project becomes active, the person responsible for the delivery work must have the
PM role on the Project.
The DST will use a mapping table to be defined per theatre/region/account according to the way the team
can most easily retrieve the correct name. The DST will add this person as team member to the Project
with the PM role.
As OP only allows one single person having the PM role on a Project, the previous PM role will be end
dated automatically for the person that had that role during the Pre-Sales phase.
For example, if a BDM was the PM (role) during the Pre-Sales phase, he will not play that role once the
Project is activated, but will be replaced by a delivery PM. That can be a person having ‘PM’ as HR title, a
Delivery Manager, a senior Network Consulting Engineer (NCE), etc.
Activate Project
The DST will manually change the status of the Project to ‘Active’ after having executed all previous
steps. This status change will trigger an automatic notification to the Project Manager, DM/ Work Manager
(WM)/ Sales Representative to make them aware of the Project being activated.
108
Q1FY10 Edition
CISCO CONFIDENTIAL
will need to check if the products related to the deal were booked and shipped before starting the
activation in OP.
It needs to be noted that the DST requests the revenue transfer from Revenue Accounting Ops on behalf
of the SAM. Also, DST checks with Revenue Accounting Ops on the revenue transfer generation as
Revenue Accounting is responsible for ensuring a product shipment occurs which then funds the revenue
transfer, and DST inserts that Sales Order number in the OP project.
The revenue transfer request will need to reference the PID.
Note: DST requests the revenue transfer from Revenue Accounting Ops on behalf of the SAM.
DST also checks with Revenue Accounting Ops on the revenue transfer generation as Revenue
Accounting is responsible for ensuring a product shipment occurs which then funds the revenue transfer,
and DST inserts that Sales Order number in the OP project.
Besides this, Resource Management in Oracle Projects will help all PM’s by:
109
Q1FY10 Edition
CISCO CONFIDENTIAL
• Provide support for contingent workers
Additional key Resource Management job roles and responsibilities may be found in Chart A and
Chart B of the Appendix.
110
Q1FY10 Edition
CISCO CONFIDENTIAL
Creating/Adding a Resource Requirement
111
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed steps with screenshots
Step Action
Step Action
3. From the Actions drop-down menu, select Add Requirements and click the Go button.
112
Q1FY10 Edition
CISCO CONFIDENTIAL
4-9
Step Action
4. Enter text in the Role field or search by clicking the flashlight icon.
Click on the appropriate radio button to select that role and click Select.
The Team Role name, Start Date, End Date, Staffing Owner, Schedule Status, Minimum
Job Level, Maximum Job Level, Advertisement Rule and Project Calendar automatically
populate on the Add Requirements screen.
Rename the Team Role to something meaningful to help identify the purpose for the resource
on the Project. This name should help other Managers to understand the resource need.
6. Modify dates in the Start Date and End Date fields, if applicable.
The start and end date of the resource requirement default to the Project duration. In many
cases, this may not be the dates needed for the resource requirement. If necessary, modify
the start or end dates to match the resource need.
7. Enter the value in the Staffing Owner field as needed, or search by clicking the flashlight
icon.
If the organization the resource requirement is being created for does not have a Primary
Resource Authority established, the Staffing Owner defaults to the Project Manager.
If the user knows that someone other than the Project Manager or Resource Manager (or
Primary Resource Authority if applicable, for the exact definition, refer to the Appendix Chart
B) is responsible for filling this resource requirement, then the user should enter this
individual’s name here. Otherwise, leave the field with its default value.
8. Ensure that Open is in the Schedule Status field. This is the default value.
113
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
This field indicates which whether a resource requirement is Critical, High, Medium, or Low
priority. This is for the benefit of any Project Manager or Resource Manager that is looking to
fill the role.
10-13
Step Action
• Country
• State / Region
• City
These fields default to that of the Project. They only need to be changed if the resource is in
a different location.
114
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
Be cautious when selecting the range of values acceptable for the role; too narrow of a
search range could populate too few or zero candidates for the role.
The numbers do not correspond to Grades. For example, an NCE could be anywhere
between Job Level 10 and Job Level 13. A Project Manager could be anywhere between
Job Level 20 and Job Level 23. Refer to the following table:
An Advertisement Rule determines if the resource requirement that has been created is
visible to others in the organization. If the resource requirement is to be visible to others,
select the Start Advertisement Rule checkbox.
This field defaults to the Project calendar where the Project was created. For example, if the
Project is created in Japan, the calendar defaults to that of Japan.
This only needs to be changed if the resource is located in another location requiring a
different work calendar. To further the example above, if a resource from the United States
is added on the Project that has been created for Japan; the calendar would need to be
changed to that of the United States so that the correct holidays and work days are used.
115
Q1FY10 Edition
CISCO CONFIDENTIAL
15
14
Step Action
14. Enter resource requirement information in the Description and Additional Staffing
Information fields, if applicable.
If the resource requirement is reviewed by other people, such as when advertising the
resource requirement or when the resource requirement is being staffed by another
resource, then the Staffing Owner should fill in a description and some notes on the resource
requirement that provides details on the type of resource required.
For example, the resource requirement could potentially be filled by a resource with no
knowledge of the Project and this information would be important for staffing purposes.
16
17
Step Action
116
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
16. This informational message appears: ‘A planning resource based on the new project
requirement for use in Workplan could not be created.’
18. A resource requirement for the Project is created and is displayed on the Scheduled People
screen.
Note: Use the search function (flashlight icon) to find a full list of all schedulable roles.
117
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
3. Select check box for the resource requirement for which competencies need to be updated.
4. From the Select Team Roles drop-down menu, select Update Competencies.
5 6
Step Action
118
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
5. Enter a Competency. The user may search using the Alias or the skill Name. Enter the search
term in the Alias or Name text box. The Search and Select: Name text box opens.
The Alias is a shortened name for the skill. The Alias cannot be longer than 30 characters, so
many words in the Alias are be abbreviated. The Name contains the expanded form of the skill,
including the skill path. It is best to search using the Skill Name.
6. Enter the Proficiency Level. This is identical to the skills and skill-ratings found in GROW,
which are updated on a weekly basis.
Note: If zero candidates are found who match the search criteria, try removing the
check from the mandatory check box for competencies.
8
9
Step Action
8. The Workflow Confirmation screen appears. The proper workflow has begun to add the
competency.
A resource requirement will default to 100% scheduled (i.e. 8 hrs per day). This value should be updated
in order to reflect the planned need for the resource. Usable Resource Availability details depend on
Project Manager's reflecting actual need as opposed to leaving schedules as default. Project Managers
should look to ensure that resources are not overcommitted, which will occur if actual planned hours are
not properly reflected.
119
Q1FY10 Edition
CISCO CONFIDENTIAL
Note: Updating a schedule results in an approval request being reissued from the Resource
Manager if a resource has been named.
There are three ways in which the schedule for a resource requirement can be updated:
• Hours Per Day – This option allows the Manager to update the hours per day a resource
spends on that particular Project.
• Duration – This option allows the Manager to update the length of time a resource spends on
the Project.
• Duration Shift – This option allows the Manager to push back or forward the entire set of
scheduled days for the resource on a Project.
• Work Pattern - This option is especially helpful for countries whose calendars are not
formatted correctly. Project Managers can change which days the resource is required to
work via updating the work pattern. For example, the work pattern may default to 8 hours a
day Monday thru Friday, but the PM may change that from Saturday to Wednesday, if they so
wish.
120
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
3. Select the Team Role to update and click the check box.
Step Action
121
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
4. From the Select Team Roles drop-down menu, select Update Hours per Day. Click
the Go button.
Step Action
5. Populate the From Date and To Date fields. Populate the New Hours per Day.
6. Click the Apply and Submit button. The Submit for Approval: <Team Role Name>
displays.
122
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
7. Review the details on this page. Click the Submit button. The Scheduled People
screen returns.
A notice is sent to the resource’s Resource Manager. The Resource Manager must
approve the new hours.
Identifying Resources
123
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
2 1
Step Action
3. Click the Match Resource icon next to the resource requirement to be matched.
4 5
Step Action
124
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
4. The Resource Search Results screen lists all resources available for the Project listed
in order based on a score.
This score is based on resource availability, competency matches and job level. These
three factors are averaged together to create the score. A 100% score would mean the
resource matches all three criteria perfectly.
100% availability in the results means that the returned resource is available for 100%
of the requested time. For example, if the needed time was 2 hours per day and the
resource had 2 hours per day open in his schedule, this would show as 100%
availability. If the resource had 1 hour per day available, it would show as 50%
availability.
5. Click the Assign Person icon next to the resource to match the resource requirement
to.
Step Action
125
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
6. Review the Basic Information provided to ensure the resource requirement Start Date,
End Date and Person are correct.
Step Action
7. The Submit for Approval screen appears. The Submit for Approval screen shows the
approvers who receive an approval notification.
Depending on the candidate whom the user chooses to assign, the approval or
submission options vary.
126
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
8. Click the OK button. Confirmation notifications are sent to the listed approvers.
Note: All resources can be and should be added as team members to the Project. This is done
automatically for all resource requirements that have been approved. However, the Project Manager will
need to manually add other roles such as Delivery Manager, Work Manager, Financial Analyst, Project
Coordinator and Deal Support Team members, if they have not already been added to the team members
list of the Project. Adding these resources to the team members list enables the use of Project
Assignment template in OTL.
127
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
3. Click the Match Resource icon next to the resource requirement to be matched.
Step Action
128
Q1FY10 Edition
CISCO CONFIDENTIAL
7
Step Action
5. Change the ‘Starting Organization’ to the theatre the user would like to view resources
in.
Note: Lowering the minimum availability percentage will enable the PM to find
plausible resources in a different theatre. It is unlikely that different theatres will have
the same holiday schedules as the Project’s theatre and therefore will never match
100% availability.
7. Click Search.
129
Q1FY10 Edition
CISCO CONFIDENTIAL
9
8
Step Action
8. The Resource Search Results screen lists all resources available for the Project listed
in order based on a score.
This score is based on resource availability, competency matches and job level. These
three factors are averaged together to create the score. A 100% score would mean the
resource matches all three criteria perfectly.
9. Click the Assign Person icon next to the resource to match the resource requirement.
130
Q1FY10 Edition
CISCO CONFIDENTIAL
10
Step Action
10. Review the Basic Information provided to ensure the resource requirement Start Date,
End Date and Person are correct.
11
Step Action
131
Q1FY10 Edition
CISCO CONFIDENTIAL
11. The Submit for Approval screen appears. The Submit for Approval screen shows the
approvers who receive an approval notification.
Depending on the candidate whom the user chooses to assign, the approval or
submission options vary.
12
Step Action
12. The Resource Overcommitment screen appears. Click Continue with Conflicts
button.
132
Q1FY10 Edition
CISCO CONFIDENTIAL
13
Step Action
13. Click the OK button. Confirmation notifications are sent to the listed approvers.
Creating a Candidate
Creating candidates for a resource requirement is an optional process, but can be very useful as it allows
the Project Manager to review the resources information, capture status and then find and decide on a
resource from a list with updated availability.
When a resource is listed as a candidate, other Project Managers can see that the resource has been
listed as a candidate, which can help prevent over-allocation of resources. In addition, the resource can
see when they have
been selected as a Steps at a Glance
candidate.
1. From within the Project, click the Resources tab.
To create a 2. Click the Match Resource icon next to the resource requirement to be
candidate for a matched. The Resource Search Results screen appears with the names of
resource resources matching the resource requirements.
requirement, follow 3. Select the resources to convert to candidates by selecting the checkbox next to
the Steps at a their name.
Glance on the right 4. Click the Create As Candidates button. The Add Candidates screen appears.
or the detailed steps 5. Click the Apply button.
with screenshots 6. The Candidates: <Team Role Name> screen appears. The resources selected
below: have now been added as candidates for the Project and can now be ranked and
reviewed.
133
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
2. Click the Match Resource icon next to the resource requirement to be matched.
The Resource Search Results screen appears with the names of resources matching
the resource requirements.
4
3
134
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
3. Select the resources to convert to candidates by selecting the checkbox next to their
name.
4. Click the Create As Candidates button. The Add Candidates screen appears.
Step Action
Step Action
The resources selected have now been added as candidates for the Project and can
now be ranked and reviewed.
135
Q1FY10 Edition
CISCO CONFIDENTIAL
There are two ways to directly assign a resource to a resource requirement. Either the Project Manager
can simultaneously enter the resource requirement and the person filling that resource requirement into
the system, or a person can be assigned to an existing resource requirement.
Note: If necessary, a resource can be assigned to a Project outside the date range of the Project.
This is not common practice, but can be done; however, this is not a common or best practice.
136
Q1FY10 Edition
CISCO CONFIDENTIAL
Directly Adding an Assignment
Step Action
137
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
3-9
Step Action
3. Enter text in the Role field and search by clicking the flashlight icon to access the list
of values.
The Search and Select: Role return screen appears with the search results.
Click on the appropriate radio button to select that role and click Select.
Note: If the Role name is unknown, click on the Go button in the pop up box
and a list of role results appears.
The Team Role name, Start Date, End Date, Staffing Owner, Schedule Status and
Project Calendar all automatically populate on the Add Requirements page.
Rename the Team Role to something meaningful to help identify the purpose for the
resource on the Project. This name should help users to understand the resource
need.
138
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
5. Modify dates in the Start Date and End Date fields, if applicable.
The start and end date of the resource requirement default to the Project duration. In
many cases, this may not be the dates needed for the resource requirement. If
necessary, modify the start or end dates to match the resource need.
6. Enter the name of the person who is filling the resource requirement in the Person
field.
If the organization the resource requirement is being created for does not have a
Primary Resource Authority established, the Staffing Owner defaults to the Project
Manager.
If the user knows that someone other than the Project Manager (or Primary Resource
Authority, if applicable) is responsible for filling this resource requirement, then the
user should enter this individual’s name here. Otherwise, leave the field with its default
value.
8. Ensure that Provisional is in the Schedule Status field. This is the default value.
This field indicates which whether a resource requirement is Critical, High, Medium, or
Low priority for the Project. This is for the benefit of any Project Manager or Resource
Manager that is looking to fill the role.
12
10-11
Step Action
139
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
• Country
• State / Region
• City
These fields default to that of the Project. They only need to be changed if the resource
is located in a different location.
This only needs to be changed if the resource is located in another location requiring a
different work calendar. To further the example above, if a resource from the United
States is going to be put on the Project that has been created for Japan, the calendar
would need to be changed to that of the United States so that the correct holidays and
work days are used.
The resource is now provisionally added to the Project pending approval from the
resource’s approvers.
Assigning a Resource to an
Steps at a Glance
Existing Resource Requirement
To assign a resource to an existing 1. From within the Project, click the Resources tab.
Resource Requirement, PMs should 2. Select the resource requirement to be filled by clicking the
follow the Steps at a Glance on the right Team Role Name link in the Team Role column.
or the detailed steps and screenshots 3. The Requirement Details screen appears. From the Apply
below: and drop-down menu, select Direct Assign. Click the Go
button. The Assign: <Team Role Name> screen appears.
4. Enter the name of the person to be assigned to the
resource requirement in the Person field, or click the
Flashlight Icon to apply the resources name.
5. Click the Submit for Approval Button.
6. The Submit for Approval screen appears. The Submit for
Approval screen shows the approvers who receive an
approval notification.
7. Click the Submit button. The Confirmation screen
appears.
8. Click the OK button. The request has now been sent to the
resource’s approvers.
140
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
2. Select the resource requirement to be filled by clicking the Team Role Name link in
the Team Role column.
Step Action
Click the Go button. The Assign: <Team Role Name> screen appears.
141
Q1FY10 Edition
CISCO CONFIDENTIAL
5
Step Action
4. Enter the name of the person to be assigned to the resource requirement in the
Person field, or click the Flashlight Icon to apply the resources name.
Step Action
6. The Submit for Approval screen appears. The Submit for Approval screen shows the
approvers who receive an approval notification.
Depending on the candidate whom the user chooses to assign, the approval or
submission options vary.
142
Q1FY10 Edition
CISCO CONFIDENTIAL
Step Action
Step Action
143
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
Step Action
1. From within the Project, navigate to the Resources tab. The Scheduled People page
displays.
3. From the Select Team Roles drop-down, select the Delete Team Role option. Click
the Go button. The Warning page displays.
Step Action
4. Click Yes on the Warning page. The Scheduled People page reappears.
The resource requirement has now been removed from the Project.
Chapter 4 - Summary
In Chapter 4, Project Managers have learned about the Project Activation process and what activities the
Project Manager is responsible for in the project. Project Managers should have a good grasp of the
differences between the Cost/Revenue Budgets and Forecasts, how to update, add or delete Project
144
Q1FY10 Edition
CISCO CONFIDENTIAL
Manager and team member information, how to link all the necessary documents in Oracle Projects and
ASDW-CM, how and when to update and publish the Workplan and forecasts for the project and how to
manage, add or delete all the resources in the Resources tab within Oracle.
In the coming chapters, Project Managers will gain a better understanding of Project Execution and
Project Closure within Oracle Projects.
145
Q1FY10 Edition
CISCO CONFIDENTIAL
Chapter 5 - Project Execution
Project Manager action items and concepts from Chapter 5:
• Project Managers should maintain their Project’s Workplan, Resources and Forecasts.
• Why Project Managers should lock down their Projects and how to perform this tasks via Oracle
Forms.
• Different types of cost capture.
• How to view reports in the Reporting tab
• Project Managers Milestone Completion Certificates (MCCs) and Revenue Recognition.
• How to manage through Change Requests
In order to control who is able to log time against the Project and/or for which kind of expense type, OP
offers the possibility to lock down the Project via Transaction Controls.
Transaction controls are possible for as well Cisco resources as vendors which log time. If set, they will
apply on Project level.
Transaction controls can be set for named resources as well as for roles on the Project and can be set for
specific expenditure types or for all possible expenditure types.
For example, vendor resources which log time could be limited to only enter Vendor straight labor and
Vendor travel time as expenditure types on their timecard, not AS employee labor or AS employee travel
time.
Note: Locking down a Project applies to Transaction Projects only. Transaction Controls must
stay open for Subscription Projects because virtual team members need to be able to enter their time.
146
Q1FY10 Edition
CISCO CONFIDENTIAL
To lock down a Steps at a Glance
project, follow the
Steps at a Glance 1. Log in to Oracle Projects as a Project Manager.
on the right or the 2. From the menu items list, select Projects, under the Cisco AS Project
detailed steps with Manager - <OU> section.
screenshots below: 3. Enter the Project Number.
4. Click the Find button.
5. Select the Project.
6. Click the Open button.
7. Scroll down and double-click on Transaction Controls.
8. To limit the ability for individuals to charge time and expenses to the Project to
what is listed on the form, click the Limit to Transaction Controls check box.
With this box checked, if a user is not listed on this form, the resource cannot
charge time against the Project.
9. To allow an individual to charge time on the Project, enter Category: Labor and
Type: Advanced Services Employee Labor. Enter the person's Name and
ensure the Chargeable flag is checked.
10. To allow the Project Manager to charge various things to the Project (batch
travel expenses, Partner costs, etc.), enter the Project Manager's Name under
the Employee field, but leave all other fields blank.
11. Click the Save icon in the toolbar when finished. Close Oracle Forms.
2
1
Step Action
2. From the menu items list, select Projects, under the Cisco AS Project Manager -
<OU> section.
147
Q1FY10 Edition
CISCO CONFIDENTIAL
3
Step Action
148
Q1FY10 Edition
CISCO CONFIDENTIAL
5
Step Action
149
Q1FY10 Edition
CISCO CONFIDENTIAL
7
Step Action
150
Q1FY10 Edition
CISCO CONFIDENTIAL
8
Step Action
8. To limit the ability for individuals to charge time and expenses to the Project to what is
listed on the form, click the Limit to Transaction Controls check box.
With this box checked, if a user is not listed on this form, the resource cannot charge
time against the Project.
9. To allow an individual to charge time on the Project, enter Category: Labor and Type:
Advanced Services Employee Labor. Enter the person's Name and ensure the
Chargeable flag is checked.
Note: Leaving the settings blank and only including an Employee Name allows
that person to charge anything to the Project. Assigning them specific categories only
allows the person to charge in that particular cost (i.e. labor, expense, or travel).
Note: A Non-Labor line item will appear in the Transaction Control screen. Do not delete this item
as it will allow the Partner and T&E Costs to be uploaded.
151
Q1FY10 Edition
CISCO CONFIDENTIAL
10
Step Action
10. To allow the Project Manager to charge various things to the Project (batch travel
expenses, Partner costs, etc.), enter the Project Manager's Name under the
Employee field, but leave all other fields blank.
11. Click the Save icon in the toolbar when finished. Close Oracle Forms.
Time Entry
Time entry via Oracle Time and Labor (OTL) is described in a separate solutions document on Oracle
Projects Resource Management and Oracle Time and Labor (see references at the end of this document)
Delivery Costs are a result of a direct feed from the hours entered in Oracle Time and Labor (OTL) and
translate to dollar value cost. The costs are determined based on the global labor rates as defined by
Advanced Services Global Finance.
152
Q1FY10 Edition
CISCO CONFIDENTIAL
Metro and iExpense on monthly basis. The employee details, expenses and the Project ID are provided
to make the upload successful.
Hardware Costs
Hardware Costs refer to costs when a Customer engagement requires hardware tools to complete the
delivery and are captured as a part of the Project actual cost, which is loaded by the Project Manager
Consolidated operational and analytical reporting will be made available in a standardized format by the
BI team.
A subset of OP data will be made available in the Business Objects environment to a limited group of
people that received the proper training.
The actual costs per sub-task will be shown as a link. Clicking on the link will give the details on how this
cost is composed and when the actual cost elements were incurred.
153
Q1FY10 Edition
CISCO CONFIDENTIAL
Revenue and Cost Distribution over Time: Periodic Summary
154
Q1FY10 Edition
CISCO CONFIDENTIAL
Profitability for Multiple Projects
A personalized view has been created for an AS P&L report, giving an overview of all the Projects
regardless the role the person logged in plays in any of these Projects.
This view can be personalized further according to the needs. Columns can be added or deleted and the
Projects mentioned in the report can be filtered upon any basic element of the Project: by organization,
Project manager, Project status, Project type, etc.
The result of this report can be exported to excel for further analysis.
Example P&L view for AS-T Projects in Active status only, where Eder, William is the PM
Resource Utilization
The utilization metrics align to industry standards.
In OP, any resource working on the Project will be able to see his personal utilization. The Resource
Manager will be able to see the utilization and usage of all resources reporting to him.
On Time and Material (T&M) engagements, the Customer sign off on the monthly timesheet instead of a
MCC and invoicing occurs at timesheet sign off. Revenue is recognized on a monthly basis, per the
invoiced amount. Very rarely will invoicing be upfront. In those instances, the revenue is deferred until
timesheets are received.
155
Q1FY10 Edition
CISCO CONFIDENTIAL
Consulting (CONS) Projects do not require sign off by the Customer, since the invoicing happens upfront.
In this case, Project Managers should be aware of the upfront invoicing. A maximum amount of
consultancy days is defined during a set Project time frame. An invoice is due regardless of the maximum
number of days actually consumed by the Customer.
Subject Matter Expert (SME) Projects require the timesheet to be signed off by the Customer on a
monthly basis similarly to T&M engagements. Delivery is invoiced upfront during booking, unless
otherwise specified and T&E is invoiced separately. For Projects with duration of less than three months,
time and expense is billed at the end of the Project. For Projects with duration of greater than three
months, time and expense is billed once every quarter. Revenue recognition is done over time at a fixed
rate, since SME Projects are essentially a purchase of skills for a defined number of days.
Note: The manual signature process should be utilized only when necessary. The Deal Support
Team is not involved in the manual process.
If the Customer rejects the MCC or timesheet, Project Managers are responsible for following up with the
Customer to resolve the issues.
Once signed by the Customer, the MCC or timesheet is stored in the standard document storage location
by the Deal Support Team, as is the case for all other deal documents. The Project Manager then
processes the signed documents to Finance for invoicing and revenue recognition.
Financial Processing
The Revenue Accounting Operations (RAO) team checks the MCC signature, verifies if the amount
matches the SO line the Milestone refers to and checks if the SOW is signed and countersigned. These
quality checks happen outside of Oracle Projects. Following the quality checks, the RAO team releases
the invoice hold for the MCC amount in ERP and based on the applicable revenue recognition
methodology for each Project, releases or defers the revenue.
To reflect the invoice hold release and revenue recognition in Oracle Projects, the RAO team updates the
billing and revenue event dates in Oracle Forms. The released revenue displays as actual revenue in the
financial reporting tab in Oracle Projects.
156
Q1FY10 Edition
CISCO CONFIDENTIAL
Every PM will be able to see in the Reporting tab the status of the actual or accrued revenue.
In order to reflect the financial process in OP, a couple of manual steps will be executed:
The RAO team will update the billing and revenue event dates in OP in order to give visibility in OP of the
invoice hold being released as well as the revenue recognition.
The date on the billing events will reflect the date of the invoice hold release
The date on the revenue events will reflect the date at which the revenue is posted to the General Ledger.
Once that date passed, OP will reflect this revenue amount as actual or accrued revenue on the Project.
The PM will be able to see in the Reporting tab the status of the actual or accrued revenue.
157
Q1FY10 Edition
CISCO CONFIDENTIAL
5.2.6 Change Request (CR) Management
For any change to the Project in terms of scope, any important schedule changes or changes in the
project execution requiring a sign-off by the customer in order to properly manage his expectations, a
Change Request (CR) document must be drafted as addendum to the initial contract. The term ‘Change
Request’ in this document is used only in its legal sense.
For any Change Request with financial implications a separate pricing sheet will be created with the
calculation of the cost of this change.
The business rules and (MDM) approval process around change management are not globally consistent
and will definitely need to become.
Project Managers should ensure that each Change Request will need to be signed by the customer and
countersigned by Cisco. This signature must be preferably obtained via e-signature (Click to Accept) in
the theatres where e-signature has been rolled out or otherwise via manual signature.
Each Change Request must reference the Project ID (PID) of the delivery project the contract it relates to.
The description below is limited to the way any scope change will be triggering additional set ups in the
Workplan and on the financial side of the delivery Project.
Even if any change to the initial deal is entered as new opportunity in SFDC, has a separate deal ID but is
still an addendum to an existent contract and project, this change will be executed within the same project
that was set up for the delivery of that initial contract.
Therefore, it must be possible to capture multiple deal ID’s in one delivery project.
Scope increase
Scope decrease
158
Q1FY10 Edition
CISCO CONFIDENTIAL
Important Schedule slip
Chapter 5 - Summary
In Chapter 5, Project Managers have learned about the Project Execution process with Oracle Projects.
PMs should continue to maintain their Transaction Project’s Workplan, resources and forecasts per
Cisco’s Project Management Policy. In addition to maintaining and updating the project in Oracle
Projects, Project Managers have learned when and how to lock down their project, the four different types
of cost capture, the types of reporting available to PMs and DMs in the Reporting tab, how to complete
MCCs and recognize revenue and how to manage change requests.
In the coming chapter, Project Managers will learn how to work within Oracle Projects to close the project.
159
Q1FY10 Edition
CISCO CONFIDENTIAL
Chapter 6 - Project Closure
Project Manager action items and concepts from Chapter 6:
Transactional project closure consists of the following high-level activities completed by the Project
Manager:
AS Finance will perform the following high-level activities prior to officially closing the project:
• Perform a final validation that all booking line items are invoiced or cancelled.
• Perform a final validation that all invoices are closed.
• Perform a final validation that all revenue has been recognized.
• Update the project status to Closed.
The graphic below illustrates the ‘Delivery Close’ status in the Project lifecycle:
160
Q1FY10 Edition
CISCO CONFIDENTIAL
6.1 Delivery Close vs. Close
‘Delivery Close’ indicates that all delivery work has been completed on a Project and revenue must be
recognized. The Project Manager is responsible for changing the status of a Project to ‘Delivery Close’
after Project delivery is completed and all items on the project checklist have been completed. Upon
‘Delivery Close’ status change, automatic notifications are sent to the Deal Support Team and Finance.
‘Closed’ indicates that all work has been completed and all revenue has been collected. Finance will
ensure that all invoices are paid and all revenue is recognized using a Project Closure Checklist. Finance
is also responsible for changing the status of a Transaction Project to ‘Closed’.
The most recent Project Manager activities checklist can be found here:
http://ework.cisco.com/Livelink/livelink.exe?func=ll&objId=39315264&objAction=Open
Note: Since the Project Manager has been regularly updating the Cost Forecast, the Estimate to
Complete (ETC) values in the Cost Forecast should be set to zero. If not, the Project Manager should
update the final Cost Forecast and ensure that the ETC values are zeroed out.
161
Q1FY10 Edition
CISCO CONFIDENTIAL
Closing Delivery Tasks
The Project Manager must close all Steps at a Glance
of the active project delivery tasks or
work assignments before moving the 1. From within the Project, click on the Workplan tab.
project to ‘Delivery Close’ status. 2. Select Update Current Working Version from dropdown and click
This is done by setting the Scheduled the Go button.
finish date to the current date. 3. Set all Scheduled Finish dates to the current date (if the
Scheduled Finish date has not already occurred).
To close the remaining delivery 4. Click the Go button. Select Continue Updating from the Apply
tasks, complete the Steps at a and drop-down menu.
Glance on the right or the detailed 5. Rename the Workplan according to the naming convention and
steps and screenshots below: click the Review and Publish button.
6. Click the Publish button.
Step Action
1. From within the Project, click on the Workplan tab.
2. Select Update Current Working Version from dropdown and click the Go button.
162
Q1FY10 Edition
CISCO CONFIDENTIAL
3
4 5
Step Action
3. Set all Scheduled Finish dates to the current date (if the Scheduled Finish date has not
already occurred).
4. Click the Go button. Select Continue Updating from the Apply and drop-down menu.
5. Rename the Workplan according to the naming convention and click the Review and
Publish button.
Step Action
6. Click the Publish button.
163
Q1FY10 Edition
CISCO CONFIDENTIAL
Update Percentage of Complete for Partner Tasks
As part of the Project closure process, Project Managers should update the percentage of complete for all
Partner tasks and at the project level to 100%. Per the Project Management Policy, Project Managers at a
minimum are required to update the percentage complete of the work being performed by Partners.
To update the
Steps at a Glance
percentage complete
of Partner tasks and 1. From within the Project, click on the Financial Tab.
at the top level of the 2. Click on Percent Complete from the blue menu bar.
project to 100%, 3. Select Expand All to view all tasks.
follow the Steps at a 4. Update the Physical % Complete to ‘100%’ for all Partner tasks (if a Partner
Glance on the right was used) and at the project top level.
or the detailed steps 5. Enter the current date in the As Of Date fields of each completed task.
and screenshots 6. Click the Save button.
below:
1
2
Step Action
1. From within the Project, click on the Financial Tab.
2. Click on Percent Complete from the blue menu bar.
164
Q1FY10 Edition
CISCO CONFIDENTIAL
6
3
5 4
Step Action
3. Select Expand All to view all tasks.
4. Update the Physical % Complete to ‘100%’ for all Partner tasks (if a Partner was used) and
at the project top level.
5. Enter the current date in the As Of Date fields of each completed task.
6. Click the Save button.
165
Q1FY10 Edition
CISCO CONFIDENTIAL
Detailed Steps with Screenshots
1
2
Step Action
1. From within the Project, click on the Project Tab.
2. Click Setup from the blue menu bar.
3. Click the Change Status button.
5
4
Step Action
4. Select Delivery Close from the drop-down menu.
5. Click the Apply button.
AS Finance Activities
Once a notification of ‘Delivery Close’ status is received, the Finance team reviews the project tasks to
ensure all tasks are complete. At this time, Finance ensures all MCC’s have been processed, validates all
166
Q1FY10 Edition
CISCO CONFIDENTIAL
Customer invoices are paid and project revenue has been recognized. Finance also ensures that the last
Cost Forecast has been zeroed out and that the Partner PO’s have been issued and paid.
The graphic below illustrates the ‘Closed’ status in the project lifecycle:
Chapter 6 - Summary
In Chapter 6, Project Managers have learned all the various activities for project closure. PM’s should
have a good understanding of the differences between ‘Delivery Close’ and ‘Closed’ statuses, what PM’s
should do before moving the project into ‘Delivery Close’ status and what exactly DST and Finance take
care of to close the entire project.
By the end of this chapter, PMs have learned the basics of Oracle Project, what Cisco Advanced Services
is and how the two work together to help Project Managers better manage their projects.
167
Q1FY10 Edition
CISCO CONFIDENTIAL
Appendix
168
Q1FY10 Edition
CISCO CONFIDENTIAL
This role is assigned to the resources that belong to
Business Operations Manager (BOM)
the AS Business Operations team.
This role is assigned to the Finance representative of
a project. Financial Analysts have the ability to view
the project’s budget information. They are
Financial Analyst
responsible for ensuring that the project revenue has
been recognized during the Pending Close phase of
the project.
169
Q1FY10 Edition
CISCO CONFIDENTIAL
Chart B – Responsibilities in Oracle Projects
Oracle Responsibilities Description
This responsibility is used by the AS Operations to
view reports and drill into Projects.
Cisco AS Operations Manager Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their Projects are located.
This responsibility is used by Deal Support Team
(DST) members to create, activate and maintain
Projects.
Cisco AS Project Administrator
Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their Projects are located.
This responsibility is used by Project Managers to
manage and maintain Projects.
Cisco AS Project Manager (PM) Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their Projects are located.
This responsibility is used by Staffing Managers to
maintain and manage resource demand and fill open
requirements. It allows the Staffing Managers to
Cisco AS Staffing Manager manage resources that do not directly report to them.
Note: Users with this responsibility will need to have
a similar responsibility in every Operating Unit/Buy
Sell in which their requirement ownership is located.
This responsibility is used by any user that is
assigned to a Project. The most typical use of this
responsibility is by engineers as Project Managers
will typically use the Project Manager responsibility,
but it will be given to all delivery users. This also
Cisco AS Team Member includes a Team Home page to provide the ability to
link directly to Time Entry and Admin Assignments
(PTO Assignments, etc.).
Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their Projects are located.
This responsibility is used by AS Finance Team
members to trigger invoice/revenue generation,
financially close out the Project and validate
Cisco AS Finance Manager financials on the Project.
Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their Projects are located.
170
Q1FY10 Edition
CISCO CONFIDENTIAL
This responsibility is used by Resource Managers or
HR Managers (where resources directly report to
them) to manage resources, view utilization and
approve resource assignments. Each user with direct
Cisco AS Resource Manager reports should have this responsibility.
Note: Users with this responsibility will need to have
a similar responsibility in each Operating Unit/Buy
Sell in which their resource ownership is located.
171
Q1FY10 Edition
CISCO CONFIDENTIAL
Chart C - Summary Table of Billing Events
Project sub-type Number of billing events Date of the billing event Amount of the billing
at set up event at set up
SOW – milestone (MDM One per SO line
will note “Milestones” (delivery work + T&E if
or “Completed separate SO line) Blank Match the SO line
Contract”) amount
T&M One per month for the Blank Total booking amount
duration of the entered in the last
engagement event.
SME (MDM will note One for the delivery Booking date for Total booked amount
“SME/Staff Augm/ work + one for T&E delivery tasks minus T&E amount
Ratable”) entered in the first
End of project date for event.
T&E
T&E amount entered
in the event of the T&E
task
172
Q1FY10 Edition
CISCO CONFIDENTIAL
Chart D – Overview of OP Statuses and PM Activities
Oracle Projects Mandatory PM Activities Where and How to?
Status
Pipeline (DST 1. PMs may start adding resource Resources Tab and add resource
creates each requirements to their projects, if they deem requirements (Chapter 4.3.4)
project in necessary for upcoming Pre-Sales activities.
Pipeline)
2. Assign resources to open requirements Search for or assign your team's
for upcoming Pre-Sales activities resources to the open requirements
(Chapter 4.3.4)
3. Update their Pre-Sales sub-tasks if Pre- Workplan Tab and Update Current
Sales will be necessary Working Version. Only copy or
update Pre-Sales sub-tasks.
4. Create a Pre-Sales cost budget Financial Tab, select AS Approved
Cost Budget and Create a plan
version (Chapter 3.3.2)
5. Change project status from Pipeline to Project Tab; select Setup in the blue
Pre-Sales when ready to start Pre-Sales menu bar. (Chapter 3.3.2)
effort.
Pre-Sales 1. Project Managers must ensure that all Workplan Tab and Update Current
sub-tasks and dates are complete and Working Version. Only copy or
accurate in their Pre-Sales Workplan. update Pre-Sales sub-tasks. Update
Scheduled Start/Finish Dates at the
sub-task level. When finished
updating the Workplan, ensure you
update the version number of your
Workplan, delete the word, 'Copy'
from the beginning and Review and
Publish your Workplan. Once
published your Scheduled
Start/Finish Dates will roll up to the
milestone level and to the
Transaction Start/Finish Dates. After
publishing the Workplan, unlock the
workplan by clicking the Change
Control lock(Chapter 3.3.2)
2. Continue updating your Pre-Sales cost Financial Tab, select AS Approved
budget Cost Budget and click your Update
pencil to update (Chapter 3.3.2)
3. Project Managers continue to add or Resources Tab and add resource
start to define resource requirements to a requirements or maintain a
project. resource's schedule (Chapter 4.3.4)
173
Q1FY10 Edition
CISCO CONFIDENTIAL
4. Close Pre-Sales milestone and sub-tasks. Workplan Tab, select Update Current
Working Version and update the
Scheduled Finish Dates of the Pre-
Sales sub-tasks. Update the version
of your Workplan using the Update
pencil and Review and Publish your
Workplan. Only after publishing the
Workplan, will the dates update at
the milestone level and for all
Transaction Finish Dates. After
publishing the Workplan, unlock the
workplan by clicking the Change
Control lock. (Chapter 3.3.2)
Active 1. Verify that the data entered by the Deal Project Tab, view customer
Support Team matches the SOW and information. In the Workplan Tab,
Purchase Order view workplan milestones.
2. Verify that team members, such as the If team members need to be revised:
Project Manager, Delivery Manager, go to the Project tab and the Setup
Finance and any other project team tab in the blue menu bar. Select
members are listed correctly. Team Members at the bottom of the
screen and update accordingly.
(Chapter 4.3.1)
3. Start delivering to the Customer Deliver to the Customer
4. Continue updating your Workplan and Workplan Tab, select Update Current
maintaining your sub-tasks. Working Version and update sub-
tasks as necessary with correct
Scheduled Start/Finish Dates.
Remember, milestones cannot be
altered by PMs. A Change Request is
needed to update the project's
milestones and done by DST. Always
remember to update your workplan
name and version and Review and
Publish your workplan to view your
changes. Unlock your workplan in the
Change Control field in the Maintain
Versions screen if you will need
others to be able to update the
Workplan too. (Chapter 4.3.2)
6. Continue updating any and all resources Resources Tab, Add Resource
and resource requirements on your project. Requirements and Assign Resources
functions. Send resource requests for
approval to their Managers. (Chapter
4.3.4)
174
Q1FY10 Edition
CISCO CONFIDENTIAL
7. Update Financials: Cost and Revenue Financial Tab, click the Maintain
Forecasts and Partner Percent Complete. Versions pencil of either Cost or
Revenue Forecast and update
accordingly. For Partner Percent
Complete, in the Financial Tab, click
on the Percent Complete in the blue
menu bar. Update the As Of Date and
% Complete for all Partner Tasks.
(Chapter 4.3.2)
8. Lockdown project as necessary. Go to Oracle Forms and lockdown
your project. This is optional but
highly recommended! (Chapter 5.2.1)
9. Project Health Reporting Ensure to view your project's health
by viewing your reports in the
Reporting tab.
10. Complete MCCs and Invoicing as (Chapter 5.2.4)
milestones or a set of milestones are
completed.
Delivery Close 1. End date all delivery sub-tasks and In the Workplan tab, select Update
milestones. Publish a final Workplan. Current Working Version. Set all
Scheduled Finish dates to the current
date (if the Scheduled Finish date has
not already occurred). Rename your
workplan and Review and Publish the
Workplan. (Chapter 6.1.2)
2. Set the percentage complete of all In the Financial Tab, click on the
Partner tasks and the top task to 100% Percent Complete in the blue menu
bar. Update the As Of Date to the
current date and % Complete for all
Partner Tasks. (Chapter 6.1.2)
3. Move the project status to ‘Delivery Project Tab; select Setup in the blue
Close’ menu bar. (Chapter 6.1.2)
Close No PM Activities necessary. Finance NONE
changes status from Delivery Close to
Close.
175
Q1FY10 Edition
CISCO CONFIDENTIAL
Chart E – Helpful Websites
Name Website
Project http://wwwin-
eng.cisco.com/CA/AS/Global_Policy_and_Process/Policy/Project_Management_Pol
Management icy.doc
Policy Site
Work at Risk http://wwwin-
eng.cisco.com/CA/AS/Global_Policy_and_Process/Policy/AS_Work_at_Risk
Policy Site _Policy_20070927_1.doc For Policy and http://wwwin-
eng.cisco.com/CA/AS/Global_Policy_and_Process/ for Process
176
Q1FY10 Edition
CISCO CONFIDENTIAL
Glossary
A
‘Active’ status indicates that a project is booked and project delivery is approved and ready to begin.
During ‘Active’ status, project delivery is being executed and the Project Manager is responsible for
updating the project Workplan and schedule, as well as the Cost and Revenue Forecasts.
Account is the business relationship that a party can enter into with another party. An Account has
information about the terms and conditions of doing business with the party.
Actual Capacity is the net capacity for the organization based on the resource’s country calendar, less
time charged to PTO (total calendar hours minus time charged to PTO).
Actual Cost is the official cost associated with the project. For example, each time one hour is charged to
a project, the amount of cost associated with one hour of the resource’s cost rate is added to the project.
Actual Utilization (%) represents the weighted actual hours expressed as a % of Actual Capacity or
Actual Worked hours, calculated by dividing the weighted actual hours by the calculation method selected
(Capacity or Total Worked Hours).
Actual Worked, in the context of the Project Profitability report, indicates the hours recorded from
reported timecards.
Administrative status within Resource Management indicates that the resource is on holiday or paid time
off (PTO).
Analytical Reporting is reporting that synthesizes data across multiple Projects, geographies, etc.
Analytic reports are frequently used for planning and forecasting or for making strategic directional
changes based on data.
AS Advertisement Rule allows any Staffing Manager to see the requirement in Oracle Projects. In
addition, after the requirement is created and not filled within 7 and 14 days, Oracle Projects sends
notifications to the Staffing Owner and Project Manager respectively.
Available status within Resource Management indicates that the resource is available to be assigned to
a project
Available Budget is the total Cost Budget minus the sum of planned costs of all completed or planned
Deliverable Units.
Available Units are the total number of Deliverable Units minus Consumed Units.
B
Baselined Cost Budget, which is set up by the Deal Support Team, refers to the initial setup of the Cost
Budget at activation. The Baselined Cost Budget is matched to the cost information section of the pricing
177
Q1FY10 Edition
CISCO CONFIDENTIAL
sheet. It will never be updated or rebaselined by the Project Manager. The first version of the Cost
Forecast Plan will be generated from the Baselined Cost Budget.
Baselined Revenue Budget, created by the Deal Support Team, is generated from the Funding
Agreement and will be locked upon creation. A Revenue Budget can only be rebaselined by upon change
request submitted by the Project Manager to the Deal Support Team. Baselined Revenue Budgets are
used in both Transaction and Subscription Projects.
Billable is an Oracle term indicating an invoice is generated and a bill is sent to the Customer. Billability
will remain unpopulated in the standard Oracle reports.
Billing Address is the address specified on the Sales Order. This is the address where the project billing
information is sent. It will include the name of the Customer organization where the project charges are
directed. In Oracle Projects, the Billing Address, also known as ‘Bill To’ address, is a field that is used to
capture the end Customer billing information.
Billing Event is set up for each Sales Order line, as each of the Sales Order lines represent an amount
to be billed once a milestone is complete.
Budget refers to estimated costs, revenue, labor hours, or other quantities for a project or task.
Burdened Costs indicates the labor rates generated from Advanced Services Global Finance. Burden
Costs are used in reporting.
C
‘Cancelled’ Status is an additional status that is used if Projects must be removed. A project can only be
cancelled if no time has been logged against them. If time has been submitted and the project must be
removed, it must be set to ‘Closed’.
‘Closed’ status is the final status in the project status workflow. When a project is closed, all financial
and work tasks have been completed and no more work should be performed on the project in any form.
‘Closed’ status indicates time and expenses can no longer be logged against a project.
Capacity Hours is defined as the total resource capacity hours minus any assignment hours with a
reduced capacity work type, such as unassigned time.
Chargeable is term used to describe an attribute of a task. It is the first condition that allows resources to
log time and capture costs against task. A Chargeable flag is used in Oracle Projects in order for
resources to log time against a task or sub-task. Although resources can log time against a task, not all
chargeable tasks will be invoiced to the Customer.
Confirmed status within Resource Management indicates that the resource is confirmed to work on a
project.
Consumed Units are the units of a deliverable that have been utilized. Consumed Units can be in either
‘Open’ or ‘Closed’ status.
178
Q1FY10 Edition
CISCO CONFIDENTIAL
Cost Budget indicates the estimated cost for a project at completion. Budget amounts can be a summary
or detailed. The Cost Budget, set up at activation by the Deal Support Team based on the pricing
information, is baselined and only changed upon a project change request.
Cost Forecast Plans are Projections that predict effort and expenses for a project. Cost Forecast Plans
indicate if the project will be within, above or below budget and is an effective tool in predicting if a project
will need a change request. The Cost Forecast Plan will be monitored by the Project Manager to ensure
the project is within budget.
D
‘Delivery Close’ status indicates the delivery of the project is complete. ‘Delivery Close’ status is selected
in Oracle Projects when all deliverable tasks have been completed. When a project is complete, the
Project Manager changes the project to ‘Delivery Close’ status.
Deliverable is often used in the Subscription Model and refers to a task that a client has purchased. In
Subscription Projects, Deliverables are the third level in the service hierarchy under Service Program and
Service Component.
Deliverable Unit Cost is often used in the Subscription Model and refers to the cost of one unit of a
deliverable. The two types of costs associated with Deliverable Units are the planned cost that comes
from the ASPT Quote and the actual cost based on time entered against the Deliverable Unit.
Delivery Plan Window is often used in the Subscription Model, within the context of Delivery Planning. It
is the time window in which all delivery plans should fall. More specifically, plan dates cannot be before a
project delivery start date or after a project delivery end date.
F
Financial Hierarchy is a reporting hierarchy structure based on financials. This form of reporting allows
people to be held accountable for the organizations Profit & Loss responsibilities. The hierarchy is broken
out by Cost of Goods Sold (COGS) and Operating Expenses (Op-Ex), which are further broken out by
Theatre.
Forecast refers to the prediction of costs or revenue that will be incurred or collected in the future.
Fully Executed Deal refers to a deal that is considered fully executed when the following documentation
is in place:
2. A customer Statement of Work (SOW) that is in effect (signed by both parties). (See Service
Bookings Policy for definition of Active Legal Agreement.
179
Q1FY10 Edition
CISCO CONFIDENTIAL
3. The customer has provided a valid purchase order (PO) (or funding is secured via revenue
according to the Funding Source Requirements policy: http://wwwin-
eng.cisco.com/CA/ASNS/Security_Consulting/Templates/Funding-Source-Policy.doc@1.
A fully executed deal is evidenced by a booked order by Cisco and an activated Advanced Services
Project.
Funding Agreement is created by the Deal Support Team in Oracle Projects. A Funding Agreement
defines and specifies what project a particular Customer is funding. The baselined Revenue Budget is
generated from the Funding Agreement.
Functional Hierarchy is a reporting hierarchy structure based on the functional segregation of the
organization. It shows the functional structures of the team. It is independent of HR structure and financial
structure and may include individuals across multiple financial and geographical boundaries. This
hierarchy allows a view into the “dotted line” relationships of a team.
H
HR Hierarchy is a reporting hierarchy structure based on HR roles. It indicates the organization reporting
structures according to the HR definitions, showing solid line relationships between teams and
organizations. It allows information to be viewed and shared across individuals and their supervisors.
I
Inception to Date (ITD) is the time interval from the beginning of the project to the current date.
J
Job Level is a value which indicates the level of a particular role. For example, an NCE could be
anywhere between Job Level 10 and Job Level 13. A Project Manager could be anywhere between Job
Level 20 and Job Level 23. Job Levels do not correspond to Cisco Job Grades.
M
Milestone is considered an important deliverable on a given project. Milestones are taken directly from
the Statement of Work and payment for work is received upon Milestone completion.
O
‘On Hold’ status is used by the Project Manager to indicate a temporary pause in the project. No time
may be logged in Oracle Time and Labor for any tasks while a project is in ‘On Hold’ status. However,
some project maintenance work may be performed, such as updating Cost and Revenue Budgets and
Cost and Revenue Forecasts. This is only used for Transaction Projects.
Operational Reporting is reporting focused on the health and success of a given Project or region. This
type of reporting typically focuses on point in time reporting. It does not provide trending analysis
information.
180
Q1FY10 Edition
CISCO CONFIDENTIAL
Oracle Forms are the back-end project setup screens in Oracle. These are typically used for financial
related set up items on a project.
Oracle Projects is the web-based Project Management system where the majority of all project activity
occurs.
Oracle Responsibility is a set of data, menus and forms that defines the user’s particular level of
authority in Oracle Projects. Each user has at least one responsibility. Some users may be able to logon
with additional areas of responsibility.
Oracle Time & Labor (OTL) is a module within the Oracle Application Suite that allows users to track and
submit time in Oracle Projects.
Overcommitted status within Resource Management indicates that the resource has been over-allocated
and is committed to too many hours of work.
P
‘Pipeline’ status indicates an opportunity is identified for a potential service delivery project. Initially,
Projects are created in Oracle Projects in ‘Pipeline’ status. In this stage, the Project Manager can define
resource requirements and generally forecast and capture needs for an opportunity prior to the start of
the Pre-Sales phase. During ‘Pipeline’ Status no time can be logged against any task.
‘Pre-Sales’ status indicates Sales support is required. The Project Manager is responsible for changing
the project status to ‘Pre-Sales’ status. A project remains in ‘Pre-Sales’ status as long as the deal is not
ordered and booked. Projects are not required to include a ‘Pre-Sales’ phase and can move from
‘Pipeline’ directly to ‘Active’ status.
Per Unit Committed Hours is often used in the Subscription Model and refers to the number of hours per
Deliverable Unit. Per Unit Committed Hours originate from the ASPT Quote and are the result of cost
algorithms.
Period to Date (PTD) is the time interval from the start of the current financial period to the current date.
Primary Resource Authority employs a system in which an individual, who is not the PM nor the
Resource Manager has full authority over the resource scheduling and approvals, this individual could be
configured as the Primary Resource Authority. This would result in all requirements defaulting to this
individual as staffing owner, as well as this individual being the first approver in the approval field.
Project Finish Date is the date that the project is closed. The Finish Date defaults from the project
template to one year from the current date. It can be changed by the Project Manager if the project lasts
longer. The final project End Date will be set at project closure by Advanced Services Finance.
Project Numbers are assigned to a project when it is first created. Project Numbers are synonymous
with the term PID (Project ID) from A4 and may be used interchangeably.
Project Start Date is the project creation date. Note the Project Start Date is not the delivery start date.
181
Q1FY10 Edition
CISCO CONFIDENTIAL
Project Template is a custom web-based template used by the Deal Support Team to enter in both
required and optional information for project creation.
Provisional status within Resource Management indicates that the resource is provisionally assigned to
a project and awaiting Resource Manager Approval.
Publish to Everyone Rule is when any Staffing Manager has the ability to see the requirement in Oracle
Projects.
Q
Quote is used in the Subscription Model and refers to the set of services and prices of those services and
planned costs. The Quote is the basis for AS Subscription delivery scope.
R
Raw Costs is an Oracle specific term. Raw Costs are costs that are directly attributable to work
performed. Examples of Raw Costs are salaries and travel expenses. Raw Costs will not be populated in
the standard Oracle reports.
Reporting Hierarchy is the structure used within Oracle to define the organization of data. The Reporting
Hierarchy determines what type of data is visible in a report, which is determined by an individual’s role
and the Oracle Responsibility that they used to logged in to Oracle Projects. This enables vast reporting
needs while maintaining data confidentiality. There are three types of reporting hierarchies: Financial,
Functional and HR.
Resource Type indicates the type of resource. During Phase I of the Oracle Projects release, all
resources will be Employee (vendor and non-vendor).
Responsibility is a set of functions attributed to a resource that allows them certain abilities across
multiple Projects and in Oracle Projects. Once granted a particular responsibility, the employee can
perform the actions granted to this responsibility.
Revenue Budget indicates the amount billed to the client. The revenue budget is created at the
milestone level and equals the ERP booked amount per milestone. Only the Deal Support Team is
authorized to add or update a Revenue Budget on a project.
Revenue Events are set up to signify when revenue is recognized. Revenue Events could be set up in
one of two ways. First, when revenue is recognized at the end of the project, one Revenue Event is
created for the total revenue amount at completion of the last milestone. Second, when the Revenue is
recognized per milestone, one Revenue Event is set up for each milestone.
Revenue Forecast is maintained by the Project Manager and is a Projection of when revenue will be
recognized from Revenue Events. The Revenue Forecast Plan will reflect the revenue recognition
182
Q1FY10 Edition
CISCO CONFIDENTIAL
schedule for the project. Should the schedule slip, the Project Manager will need to update the Revenue
Forecast accordingly.
Role gives the user the access to the project based on their assigned role. For example, an NCE may be
assigned a Project Manager role on a project and would be able to perform all the duties as a Project
Manager for that particular project.
S
Schedulable is the ability be staffed on a project and fill a requirement.
Scheduled Capacity is defined as calendar hours minus resource assignment hours flagged as reducing
capacity. These are assignments with a work type of paid leave, e.g. PTO.
Scheduled Dates are related to the planning of the delivery work. They indicate when the work on the
task is scheduled to start and finish. Scheduled Dates will be updated on the lowest level tasks and
automatically roll up to the milestone. Scheduled Dates are editable under the Workplan tab in Oracle
Projects by Project Managers.
Scheduled Finish Date on the project level is the end date of the latest ending task in the Workplan.
Scheduled Start Date on the project level is the start date of the earliest starting task in the Workplan.
Scheduled Utilization (%) is the weighted scheduled hours as a percentage of scheduled capacity or
total worked hours depending on the selected calculation method. This is calculated by dividing the total
scheduled weighted hours by the calculation method selected (Capacity or Total Worked Hours).
Scheduled Work is the sum total of scheduled hours based on the resource assignments.
Service Component is used in the Subscription Model and refers to the second level in the Services
Hierarchy, just below Service Program. Examples of Service Component are Design Support, Software
Strategy, Knowledge Transfer and Mentoring.
Service Program is used in the Subscription Model and refers to the highest level in the Services
Hierarchy. Examples of Service Programs are Focused Technical Support and Optimization.
Services are used in the Subscription model, within the context of ASPT Quotes. Services are the
second level in a Quote, just under a Service Program. Services are converted to Service Components by
the interface between ASPT and the AS Delivery tools. Examples are Continuous Learning, Annual
Assessment and Network Support.
Services Hierarchy is used in the Subscription model and refers to the hierarchical structure of the
services in Oracle Projects, namely, Service Program, Service Component, Deliverable and Deliverable
Unit.
Shipping Address is the address of the location where the Cisco services will be delivered. In Oracle
Projects, Shipping Address, also known as ‘Ship To’ address, is a field that is used to capture the end
Customer shipping information. The Shipping Address can be different from the Customer organization’s
Billing Address.
183
Q1FY10 Edition
CISCO CONFIDENTIAL
Sub-Task is the smallest sub-division of project Work. Sub-tasks are created and updated in relevance to
the Milestone they are created under.
Swap-In Budget is the budget minus the sum of costs of all Deliverable Units in the Work Breakdown
Structure (WBS).
Swap-In Deliverable Units are Deliverable Units that are not from a Quote and were not originally
purchased.
Swap-Out Deliverable Units are Deliverable Units that will be dropped from the project.
T
Target Start Date is the date that delivery of a project is expected to start. It is entered by the Deal
Support Team at project creation. Generally, the Target End Date should be left blank. The Target Start
Date is used at the project level.
Task is a subdivision of project work. Each project can have a set of top level tasks and a hierarchy of
sub-tasks below each top level task.
Template in Oracle Projects refers to a completed Timecard or portion of a Timecard that can be used
over and over again.
Timecard is a form users submit weekly within Oracle Projects to report time to particular Projects and
tasks within those Projects.
Total Cost Budget is the budget allocated to deliver the project. In the case of Subscription Projects the
Total Cost Budget is created pursuant to the Advanced Services Pricing Tool (ASPT) Quote. In the case
of Transaction Projects the Total Cost Budget is created pursuant to the Pricing Sheet.
Total Number of Units, a term used in ASDW-ADM, is the number of Deliverable Units that are
committed to the Customer. The Total Number of Units is always the sum of Consumed and Available
Units. This number includes any changes in Swap-In Deliverable Units as compared with the initial
number of units imported from Advanced Services Pricing Tool (ASPT).
Transaction Dates reflect the time frame within which the financial transactions in Oracle Projects can
happen. Main financial transactions are time entry and cost capture. The transaction dates need to be set
at the milestone level and will roll down to subordinate tasks. The Project Manager is responsible for
managing and updating Transaction Dates.
U
Unfunded Services are any un-financed additions to the Subscription project’s scope. Unfunded
Services only occur in Subscriptions Projects and require formal approval from a Profit and Loss (P&L)
Accountable Party. Under Unfunded Services, the project Cost Budget will increase by the sum of the
Quoted cost of the additional deliverable. However, Unfunded Services will not result in Revenue. The
184
Q1FY10 Edition
CISCO CONFIDENTIAL
Deal Support Team is responsible for entering in the Zero Dollar Quote into ASPT so that deliverables
can be added into Oracle Projects with accurate planned cost information.
Upsell is a set of services sold to the Customer as an incremental addition to the existing project or
Purchase Order. Since this is a new order, the Cost Budget will increase by the sum of the Quoted costs
of the additional deliverables and the Revenue Budget will increase by the booking amount associated
with the Upsell. An Upsell only occurs in Subscription Projects.
Utilization (%) is the hours for the resource expressed as a percentage of actual capacity or actual
worked (depending on the profile option).
W
Weighted Actual is the amount of time charged to Customer billable tasks. This is calculated by
multiplying the total from each timecard entry by the utilization/realization percentage of the work type
associated with the task. The only case a task is utilized or realized is with Customer billable work.
Weighted Schedule is the sum of weighted scheduled hours for the organization, calculated by
multiplying the total scheduled assignment hours associated with a resource assignment.
Work Breakdown Structure (WBS) is the breakdown of project work into tasks. These tasks can be
broken down further into sub-tasks, or hierarchical units of work.
Worked Hours is the sum of worked hours for the resource obtained from actual timecards.
185
Q1FY10 Edition
CISCO CONFIDENTIAL