0% found this document useful (0 votes)
648 views

Shoring Pile Sheet

This document provides input data and calculations for the design of a braced shore pile. Key details include: - Pile length is 49.1 feet (minimum required is 15.11 feet) - Maximum moment on the pile is 11 kip-feet - Negative moment per pile is 32.77 kip-feet - Depth of embedment (D1) is calculated to be 11.795 feet - Point of zero shear is 7.775 feet below the water level - Reaction at the bracing level is 0 kips The document calculates earth pressures, moments, shear forces and other parameters to design a braced shore pile to support a 2-story

Uploaded by

Fatima tuz Zohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
648 views

Shoring Pile Sheet

This document provides input data and calculations for the design of a braced shore pile. Key details include: - Pile length is 49.1 feet (minimum required is 15.11 feet) - Maximum moment on the pile is 11 kip-feet - Negative moment per pile is 32.77 kip-feet - Depth of embedment (D1) is calculated to be 11.795 feet - Point of zero shear is 7.775 feet below the water level - Reaction at the bracing level is 0 kips The document calculates earth pressures, moments, shear forces and other parameters to design a braced shore pile to support a 2-story

Uploaded by

Fatima tuz Zohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 34

DESIGN OF BRACED SHORE PILE

12 ft
R 12 ft R
O

H = 31 ft
19 ft
19 ft

h = 46.1 ft

O''

Y= 3.31 ft

D 15.11 ft
D1= 12 ft
INPUT DATA

Length of free end H = 31 ft

Depth of passive pressure D1 = 11.795 ft , eqn = -505196

No. of storey of building close to the boundary = 2 storied

Assumed load per floor of this building (DL+LL) w = 70 psf

Assumed depth of isolated footing of this building = 6 ft

Assumed depth of influence of surcharge pressure (5xB) = 30 ft (assuming B = 6 ft)

Dia of pile = 36 inch

Spacing of pile = 3 ft

Depth of bracing from EGL = 12 ft

Spacing of bracing = 16 ft

Depth water table from EGL = 12 ft

Angle of internal friction (above dredge line) φ1 = 28 deg

Angle of internal friction (below dredge line) φ2 = 32 deg

Unit wt of soil (Wet) above dredge line y = 125 Pcf


Unit wt of soil (Dry) above dredge line y' = 120 Pcf

Unit wt of water yw = 62.4 Pcf

Unit wt of soil (Dry) below dredge line yb' = 120 Pcf

Factor of safety (F.S.) = 1.5

CALCULATION

Active earth pressure coeff. (above dredge line) = Ka = 0.361

Active earth pressure coeff. (below dredge line) = Ka' = 0.307

Passive earth pressure coeff (below dredge line) = Kp = 3.255

Calculation of Pressure

12 ft R
120 x 12 = 1440
x 0.36 = 519.8882162 psf (dry)
125 x 19 = 2375
x
0.36 = 857.4545233 psf (wet) 19 ft
3815
x 0.31 = 1172.191271 psf

pp'-pa' = yb' x (kp-ka') = 353.68 Pcf

Y = 1172.191271 354 = 3.31 ft


Y= 3.31 ft
Surcharge pressure = 0.36 x 70 x 2= 50.5 psf
pp'-pa' = 354

CALCULATION OF EMBEDMENT DEPTH

Taking moment about bracing level

12 ft R

3119.3 x -4 = -12477.3171897 ft-lb 0 ft

9877.9 x 9.5 = 93839.823030848 ft-lb


19 ft
8145.8 x 12.7 = 103180.4 ft-lb

1942.5 x 20.1 = 39053.1 ft-lb X ft

1516.3 x 9= 13647.065676231 ft-lb


237243.06250795 ft-lb
24602 # Y= 3.31 ft

Now,
Pp = 0.5 x 354 x D12
equn = Pp x X = 237243.06
By trial D1 = 11.795 ft

equn = -505196 ≈ 0

Therefore total embedment required, D = 15.11 ft

For F.S. = 1.5

D= 15.11 x 1.2 = 18.1 ft

Therefore minimum pile length required, = 49.1 ft

Provided length of pile = 50 ft O.K.

Pp = 24602.3 #
now
R= T/ 16 = 24601.84596 - 24602.3092299788 = -0.46327 #

(30% increment for bracing & wale design) -0.4632706518 x 1.3 = -0.60 #

Reaction per bracing, T = 0.00 x 16 = 0 kip

Calculation Maximum Moment


z

Let the point of zero shear be at z below water level 12 ft R


= 0.36 x 125 z
= 45.1 z
Then equn is

-0.46 = 3119.3292974243 + 520 z + 50.54 (z+ 6) + 0.5 x 45.1 z2 19 ft


By trial z = 7.775 ft

equn = -9222 ≈ 0

Maximum Moment 3.31 ft

3119.329297 x 11.8 = 36730.102477171 ft-lb

519.89 x 7.78 = 4042.130881 x 3.89 = 15713.783800843 ft-lb


354
0.5 x 45.1 x z2
= 1364.043733 x 2.59 = 3535.1466739453 ft-lb

50.54 x 13.8 = 696.2530729 x 6.89 = 4795.4430397795 ft-lb


60774 ft-lb

9221.756984 x 7.78 = 71699.160552997 ft-lb 4171.65


Maximum moment = 10925 ft-lb
= 11 kip-ft

Negative moment per pile = 32.77405368 kip-ft

Ultimate moment= 32.77405368 x 1.5 = 49 kip-ft


6 ft
12 ft

19 ft

30 ft
519.888 psf 6 ft
12 ft

19 ft

857 psf 30 ft

1172.19 psf
D1

surcharge pressure
= 50.54 psf

12 ft 6 ft
3119.33 #

19 ft
9877.88 #
30 ft
8145.82 #
1516 #

1942.48 #

D1 = 12 ft
519.888 psf 6 ft
12 ft

z ft
19 ft

857 psf 30 ft

1172.19 psf

12 ft

surcharge pressure
psf = 50.54 psf
DESIGN OF UNBRACED SHORE PILE

0 ft
R 0 ft R 2.5 ft
O 22 ft

H = 22 ft
22 ft
22 ft 0 ft

h = 24.3 ft 30 ft

O''

Y= 2.29 ft

D 2.29 ft
D1= 0 ft

INPUT DATA

Length of free end H = 21.976 ft

Depth of passive pressure D1 = 0 ft , eqn = 179244

No. of storey of building close to the boundary = 1 storied

Assumed load per floor of this building (DL+LL) w = 250 psf

Assumed depth of isolated footing of this building = 2.5 ft

Assumed depth of influence of surcharge pressure (5xB) = 30 ft (assuming B = 6 ft)


Dia of pile = 30 inch

C/C Spacing of pile = 2.78 ft

Depth of bracing from EGL = 0 ft

C/C Spacing of bracing = 0 ft

Depth water table from EGL = 21.98 ft

Angle of internal friction (above dredge line) φ1 = 32 deg

Angle of internal friction (below dredge line) φ2 = 32 deg

Unit wt of soil (Wet) above dredge line y = 125 Pcf

Unit wt of soil (Dry) above dredge line y' = 110 Pcf

Unit wt of water yw = 62.4 Pcf

Unit wt of soil (Dry) below dredge line yb' = 110 Pcf

Factor of safety (F.S.) = 2

CALCULATION

Active earth pressure coeff. (above dredge line) = Ka = 0.307

Active earth pressure coeff. (below dredge line) = Ka' = 0.307

Passive earth pressure coeff (below dredge line) = Kp = 3.255

Calculation of Pressure

0 ft R 742.89 psf 2.5


110 x 22 = 2417.8 0 21.98 ft
x 0.31 = 742.8896606 psf (dry)
125 x 0= -0.5
x
0.31 = -0.153629262 psf (wet) 22 ft
2417.3 -0.004 ft
x 0.31 = 742.7360313 psf
-0.15 psf 30
pp'-pa' = yb' x (kp-ka') = 324.21 Pcf

Y = 742.7360313 324 = 2.29 ft


Y= 2.29 ft
Surcharge pressure = 0.31 x 250 x 1= 76.8 psf 742.736 psf
pp'-pa' = 324 D1

surcharge pressure
= 76.81 psf

CALCULATION OF EMBEDMENT DEPTH

Taking moment about bracing level

0 ft R 22 ft 2.5
8164.36 #
8164.4 x 14.7 = 119635.049993437 ft-lb 22 ft

-2.9716 x 22 = -65.3089158418 ft-lb


22 ft 0 ft
0.0003 x 22.0 = 0.0 ft-lb -2.9716 #
30
850.78 x 22.7 = 19346.4 ft-lb X ft 0.00031 #

2304.4 x 17.5 = 40327.681343574 ft-lb


179243.878198167 ft-lb
F = 11317 # Y= 2.29 ft 850.781 #

Now,
Pp = 0.5 x 324 x D12
equn = Pp x X = 179243.88 D1 = 0 ft

By trial D1 = 0 ft

equn = 179244 ≈ 0

Therefore total embedment required, D = 2.29 ft

For F.S. = 2

D= 2.29 x 1.3 = 3.0 ft

Therefore minimum pile length required, = 25.0 ft

Provided length of pile = 35 ft O.K.

Pp = 0 #
now
R= T/ 0 = 11316.60564 - 0 = 11316.6056 #

(30% increment for bracing & wale design) 11316.6056412641 x 1.3 = 14711.59 #

Reaction per bracing, T = 14.71 x 0 = 0 kip


As there is no need to provide anchor, therefore we provide Cantilever Shore Pile instead of Anchored Shore Pile.

Assume a Trial Depth of Shore Pile below 'Y' distance D = 21 ft


0 ft 22 ft 2.5
Calculation of p1 & p2 0#

p1 = yb' x (Kp-Ka') x D = 6808 Psf 22 ft 0 ft


0#
P yb' x (H + Y + D) x Kp = 16205.77667 Psf 30
8520.4 #
P' yb' x (Y + D) x Ka' = 787.1972705 Psf
n
p2 = P - P' = 15418.579 Psf
Y= 2.29 ft 755.95 #
zero pressure plane
Calculation of z & a a= 8.35531 ft

z = ( p1xD - 2xF)/(p1+p2) zero shear plane O'


D= 21 ft
z = 5.41423661 ft
z = 5.4 ft
Force in Anchor, by summing all moments @ O
O
For Cantilever Shore Pile, R should be zero otherwise try another depth, D

R = -112.3658113 Kip p1 = 6808 Psf p2 = 15419 Psf

D+Y = 23.29 ft

Factor of Safety = 1.30

Therefore total Length of Pile required = 52.25 ft

Provided Length of Pile = 68.5 ft OK

a = √ (2 x F / ( yb' (Kp - Ka')))

= 8.355306391 ft

Calculation of Mmax
Mmax applied on Pile by summing moment @ O'

Mmax = 101500.0211 lb-ft

= 137.0250285 kip-ft/ft

Net Mmax = 380.9295793 Kip-ft


at each pile
ft

ft
ft

ft

2304 #
ft

ft

2304 #
DESIGN OF UNBRACED SHORE PILE

0 ft
R 0 ft R 0 ft
O 22 ft

H = 22 ft
21.976 ft
22 ft 0 ft

h = 52.2 ft 30 ft

O''

Y= 4.03 ft

D 30.27 ft
D1= 26 ft
INPUT DATA

Length of free end H = 21.976 ft

Depth of passive pressure D1 = 26.246 ft , eqn = -2575231

No. of storey of building close to the boundary = 1 storied

Assumed load per floor of this building (DL+LL) w = 250 psf

Assumed depth of isolated footing of this building = 0 ft

Assumed depth of influence of surcharge pressure (5xB) = 30 ft (assuming B = 6 ft)

Dia of pile = 30 inch

C/C Spacing of pile = 2.78 ft

Depth of bracing from EGL = 0 ft

C/C Spacing of bracing = 0 ft

Depth water table from EGL = 21.98 ft

Angle of internal friction (above dredge line) φ1 = 32 deg

Angle of internal friction (below dredge line) φ2 = 32 deg

Unit wt of soil (Wet) above dredge line y = 125 Pcf

Unit wt of soil (Dry) above dredge line y' = 110 Pcf

Unit wt of water yw = 62.4 Pcf

Unit wt of soil (Sat.) below dredge line ɣs' = 62.6 Pcf (y-yw)

Factor of safety (F.S.) = 1.5


CALCULATION

Active earth pressure coeff. (above dredge line) = Ka = 0.307

Active earth pressure coeff. (below dredge line) = Ka' = 0.307

Passive earth pressure coeff (below dredge line) = Kp = 3.255 2.947

Calculation of Pressure

0 ft R 742.89 psf 0 ft
110 x 22 = 2417.8 0 21.98 ft
x 0.31 = 742.8896606 psf (dry)
125 x 0= 0
x
0.31 = 0 psf (wet) 21.98 ft
2417.8 -0.004 ft
x 0.31 = 742.8896606 psf dry earth pressure
0 psf 30 ft
pp'-pa' = ɣs' x (kp-ka') = 184.5 Pcf

Y = 742.8896606 184.5 = 4.03 ft


Y= 4.03 ft
Surcharge pressure = 0.31 x 250 x 1= 76.8 psf 742.89 psf

pp'-pa' = 185 D1

surcharge pressure
= 76.81 psf
CALCULATION OF EMBEDMENT DEPTH

Taking moment about bracing level

0 ft R 22 ft 0 ft
lb/ft 8164.36 #
8164.4 x 14.7 = 119635.049993437 ft-lb/ft due to dry earth above dredge line 22 ft

0x 22 = 0 ft-lb/ft due to water above dredge line


21.98 ft 0 ft
0x 22.0 = 0.0 ft-lb/ft due to water above dredge line -2.9716 #
30 ft
1495.6 x 23.3 = 34874.6 ft-lb/ft due to dry earth below dredge line X ft 0#
2304 #
2304.4 x 15 = 34566.5840087777 ft-lb/ft due to surcharge
189076.263105927 ft-lb/ft
F = 11964 # Y= 4.03 ft 1495.6 #

Now,
Pp = 0.5 x 185 x D12
equn = Pp x X = 189076.26 D1 = 26.25 ft

By trial D1 = 26.246 ft

equ = n
-2575231 ≈ 0

Therefore total embedment required, D = 30.27 ft

For F.S. = 1.5

D= 30.27 x 1.2 = 36.3 ft

Therefore minimum pile length required, = 58.3 ft

Provided length of pile = 50.512 ft Not O.K.

Pp = 63547.624201 #
now
R= T/ 0 = 11964.39668 - 63547.6242014462 = -51583.22752 #

(30% increment for bracing & wale design) -51583.2275171942 x 1.3 = -67058.20 #

Reaction per bracing, T = -67.06 x 0 = 0 kip


As there is no need to provide anchor, therefore we provide Cantilever Shore Pile instead of Anchored Shore Pile.

Assume a Trial Depth of Shore Pile below 'Y' distance D = 26.246 ft


0 ft 22 ft 0 ft
Calculation of p1 & p2 0#

p1 = ɣs' x (Kp-Ka') x D = 4842 Psf 21.98 ft 0 ft


0#
P = ɣs' x (H + Y + D) x Kp = 10644.95235 Psf 30 ft
8520.4 #
P' = ɣs' x (Y + D) x Ka' = 582.2717275 Psf 2304 #
10062.68063 n
p2 = P - P' = 10062.681 Psf
Y= 4.03 ft 755.95 #
zero pressure plane
Calculation of z & a a= 11.3883 ft

z = ( p1xD1 - 2xF)/(p1+p2) from base upto max passive pressure zero shear plane O'
D= 26.25 ft
z = 6.921534403 ft
z = 6.92 ft
Force in Anchor, by summing all moments @ O
O
For Cantilever Shore Pile, R should be zero otherwise try another depth, D

R = -71.31673735 Kip p1 = 4842 Psf p2 = 10063 Psf

D+Y = 30.27 ft 19.5 43.79 calculated from eq 20.4


Factor of Safety = 1.30

Therefore total Length of Pile required = 59.71 ft

Provided Length of Pile = 50.12 ft NOT OK

ybar 11.353107
a = √ (2 x F / ( ɣs' (Kp - Ka'))) Pp'' 5220.219
C1 28.293434
= 11.38829916 ft 11.38829916 C2 -518.77343
c3 -8834.6886
c4 -141800
Calculation of Mmax
solving 4
Mmax applied on Pile by summing moment @ O' degree Do 22.92
eqn D=Do+Yo 26.95

Mmax = 148146.6092 lb-ft 1.4xD 37.7250162


total= D+H 59.71
= 199.9979225 kip-ft/ft
Mmax 226669.16 lb-ft
Net Mmax = 555.9942245 Kip-ft 226.66916 k-ft/ft
at each pile 1008.2244 KN-m/m
753.7526091 KN-m/Pile

886.7677754 KN-m/m
DESIGN OF UNBRACED SHORE PILE

0 ft
R 0 ft R 0 ft
O 25 ft

H = 24.6 ft
24.6075 ft
25 ft 0 ft

h = 56.1 ft 0 ft

O''

Y= 5.10 ft

D 31.46 ft
D1= 26 ft
INPUT DATA

Length of free end H = 24.608 ft

Depth of passive pressure D1 = 26.361 ft , eqn = -2792829

No. of storey of building close to the boundary = 0 storied

Assumed load per floor of this building (DL+LL) w = 0 psf

Assumed depth of isolated footing of this building = 0 ft

Assumed depth of influence of surcharge pressure (5xB) = 0 ft (assuming B = 6 ft)

Dia of pile = 30 inch

C/C Spacing of pile = 2.78 ft

Depth of bracing from EGL = 0 ft

C/C Spacing of bracing = 0 ft

Depth water table from EGL = 24.61 ft

Angle of internal friction (above dredge line) φ1 = 32 deg

Angle of internal friction (below dredge line) φ2 = 32 deg

Unit wt of soil (Wet) above dredge line y = 125 Pcf

Unit wt of soil (Dry) above dredge line y' = 110 Pcf

Unit wt of water yw = 62.4 Pcf

Unit wt of soil (Dry) below dredge line ɣs' = 62.6 Pcf

Factor of safety (F.S.) = 2


CALCULATION

Active earth pressure coeff. (above dredge line) = Ka = 0.307

Active earth pressure coeff. (below dredge line) = Ka' = 0.307

Passive earth pressure coeff (below dredge line) = Kp = 3.255 2.947

Calculation of Pressure

0 ft R 831.78 psf 0 ft
110 x 24.6 = 2707.1 0 24.61 ft
x 0.31 = 831.7795517 psf (dry)
125 x 2.84 = 355
x
0.31 = 109.0767762 psf (wet) 24.61 ft
3062.1 0 ft
x 0.31 = 940.8563279 psf earth pressure
109 psf 0 ft
pp'-pa' = ɣs' x (kp-ka') = 184.5 Pcf

Y = 940.8563279 184.5 = 5.10 ft


Y= 5.10 ft
Surcharge pressure = 0.31 x 0x 0= 0.0 psf 940.856 psf

pp'-pa' = 185 D1

surcharge pressure
= 0.00 psf
CALCULATION OF EMBEDMENT DEPTH

Taking moment about bracing level

0 ft R 25 ft 0 ft
lb/ft 10235 #
10235 x 16.4 = 167923.010748408 ft-lb/ft due to dry earth 25 ft

0x 24.6 = 0 ft-lb/ft due to water


24.61 ft 0 ft
278.11 x 24.6 = 6843.9 ft-lb/ft due to wet 0#
0 ft
2398.9 x 26.3 = 63108.8 ft-lb/ft due to dry earth below dredge line X ft 278.114 #
0#
0x 0= 0 ft-lb/ft due to surcharge
237875.726434767 ft-lb/ft
F = 12912 # Y= 5.10 ft 2398.91 #

FOR ANCHOR SHORE PILE


Now,
Pp = 0.5 x 185 x D12
equn = Pp x X = 237875.73 D1 = 26.36 ft

By trial D1 = 26.36 ft

equ = n
-2792829 ≈ 0

Therefore total embedment required, D = 31.46 ft

For F.S. = 2.0

D= 31.46 x 1.4 = 44.0 ft

Therefore minimum pile length required, = 68.7 ft

Provided length of pile = 53.81 ft Not O.K.

Pp = 64100.863729 #
now
R= T/ 0 = 12912.069 - 64100.8637287539 = -51188.79473 #

(30% increment for bracing & wale design) -51188.7947261221 x 1.3 = -66545.43 #

Reaction per bracing, T = -66.55 x 0 = 0 kip


As there is no need to provide anchor, therefore we provide Cantilever Shore Pile instead of Anchored Shore Pile.

Assume a Trial Depth of Shore Pile below 'Y' distance D = 26.3609 ft


0 ft 25 ft 0 ft
Calculation of p1 & p2 0#

p1 = ɣs' x (Kp-Ka') x D = 4864 Psf 24.61 ft 0 ft


0#
P = ɣs' x (H + Y + D) x Kp = 11423.10093 Psf 0 ft
8520.4 #
P' = ɣs' x (Y + D) x Ka' = 605.1197427 Psf 0#
10817.98119 n
p2 = P - P' = 10817.981 Psf
Y= 5.10 ft 755.95 #
zero pressure plane
Calculation of z & a a= 11.8307 ft

z = ( p1xD1 - 2xF)/(p1+p2) from base upto max passive pressure zero shear plane O'
D= 26.36 ft
z = 6.529057514 ft
z = 6.53 ft
Force in Anchor, by summing all moments @ O
O
For Cantilever Shore Pile, R should be zero otherwise try another depth, D

R = -161.3314142 Kip p1 = 4864 Psf p2 = 10818 Psf

D+Y = 31.46 ft
Factor of Safety = 1.30

Therefore total Length of Pile required = 55.23 ft

Provided Length of Pile = 53.81 ft NOT OK

ybar 13.302747
a = √ (2 x F / ( ɣs' (Kp - Ka'))) Pp'' 5954.3202
C1 32.272241
= 11.83072568 ft 11.83072568 C2 -559.86428
c3 -11171.774
c4 -199856.77
Calculation of Mmax
solving 4
Mmax applied on Pile by summing moment @ O' degree Do 16.77
eqn D=Do+Yo 21.87

Mmax = 104838.1152 lb-ft 1.4xD 30.6171792


total= D+H 55.23
= 141.5314556 kip-ft/ft
Mmax 273605.42 lb-ft
Net Mmax = 393.4574464 Kip-ft 273.60542 k-ft/ft
at each pile 1216.9969 KN-m/m
533.4040603 KN-m/Pile

627.5341885 KN-m/m

You might also like