Testing and Measuring Equipment/Allowed Subcontracting IEC 61010-1, Edition 3.0
Testing and Measuring Equipment/Allowed Subcontracting IEC 61010-1, Edition 3.0
PROVISIONAL
“R” Required
“S” May be subcontracted, see OD 2012
“SF” Specialized Facility, see IECEE 02-2
“W” Witness testing in the categories “MED” and “MEAS”
“3PPS” Three Phase Power Supply required