100% found this document useful (1 vote)
382 views

ISDP Introductionary

The document discusses an integrated service delivery platform and provides revision history for the solution package and application value. It outlines procedures for registering and verifying a Uniportal user ID and accessing the ISDP. The document also provides clocking procedures for office and site work and lists target resources and roles for different areas.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
382 views

ISDP Introductionary

The document discusses an integrated service delivery platform and provides revision history for the solution package and application value. It outlines procedures for registering and verifying a Uniportal user ID and accessing the ISDP. The document also provides clocking procedures for office and site work and lists target resources and roles for different areas.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Integrated Service Delivery Platform

Create the New Leading Practice!


Solution Package of ISDP Application Value
(Smart Report)
Revision History
Version Date Content of Modification Author
01 2015-12-29 First Release based on 1205 version Liuchusheng 00123248

02 2016-01-21 Release based on 0116 version Xiebin 00340960

03 2016-02-29 Release based on 0229 version Xiebin 00340960

04 2016-08-5 Release based on 0730 version

Page 2
ACCESSin to ISDP

Page 3
Register and Verify Uniportal/User ID

1 REGISTER REGISTER by Email

http://support.huawei.com/carr
ier/en/anony/index.html

2 VERIFY LOGIN

COMPILE TO PIC and Template:


3 iRESOURCES
PLATFORM ERIKA

Page 4
Register and Verify Uniportal/User ID

Page 5
Consultant Employee Support Project

NPS Virtual Project


Office Clocking Who Can Access for Consultant
Clocking?? Registered!!!
“Indonesia NPS
Management”

You are NEW Ask to NPS Admin


Consultant under (AMALIA) to Add in to
NPS?? >>>

Page 6
CLOCKING PROCEDUREs

1
OFFICE
OSS, RNO, RF, Planning, CLOCKING
Project Admin

DT Team & RIGGER

Do Clocking at Least 2
3 Times each of single
day SITE CLOCKING

Page 7
Target Resources TSEL RO & NPM ex JABO area

1
NW (WJ, EJ) = RO LMT RO = WJ, EJ
NPM = Jabo NPM = WJ, SS
PIC = done PIC = done
2

MGS
RO = NS, SS G1
PIC = ?

3
GCI
RO = CJ, EJ, CS, WJ
PIC = ?

Page 8

You might also like