Tt=[0.091(nL)0.8/(P2)0.5S0.4]
Where: Tt = travel time, hr
n = Manning's roughness coefficient 0.013
L = flow length, m 100
P2 = 2-year, 24-hour rainfall, mm 33.4664053403
S = slope of hydraulic grade line (land slope), m/m based on topographic map
n = Manning's roughness coefficient
1 Sheet Flow(hr)
Subcatchment slope p2(mm) L(m) n
CM-1 0.04 33.466 100 0.17
CM-2 0.03 33.466 100 0.17
CM-3 0.02 33.466 100 0.17
CM-4 0.03 33.466 100 0.17
CM-5 0.025 33.466 100 0.17
CM-6 0.04 33.466 100 0.17
CM-7 0.03 33.466 100 0.17
CM-8 0.025 33.466 100 0.17
CM-9 0.01 33.466 100 0.17
CM-10 0.01 33.466 100 0.17
CM-11 0.01 33.466 100 0.17
CM-12 0.015 33.466 100 0.17
Factor Tc
3600 0.07
3600 0.02
3600 0.11
3600 0.05
3600 0.19
3600 0.08
3600 0.04
3600 0.11
3600 0.16
3600 0.09
3600 0.28
3600 0.24
Adequacy of Existing Drainage Structures
Subcatchment slope Depth(m) width(m)
CM-1 0.015 0.5 1.2
CM-2 0.01 0.45 1.2
CM-3 0.01 0.4 1.2
CM-4 0.02 0.5 1.1
CM-5 0.03 0.5 0.6
CM-6 0.025 0.5 1.2
CM-7 0.03 0.5 1
CM-8 0.04 0.5 1
CM-9 0.01 0.5 1.2
CM-10 0.01 0.5 0.6
CM-11 0.01 0.45 0.5
CM-12 0.015 0.4 0.6
Intensity from
IDF(for 25 year
Frequency)
(mm/hr) Runoff Coefficient Discharge(m3/s) 140
56 0.57 4.02
54.5 0.57 3.82
120
47 0.57 3.07
52 0.57 4.12
45 0.57 3.06
100
56 0.57 4.83
53 0.57 4.09
50.5 0.57 8.938
[ntens i ty(mm/hr)
80
40 0.57 2.23
39 0.57 2.95
36.5 0.57 2.83 60
39.5 0.57 3.05
40
20
60
[nte
40
20
0
0 0.5 1
Discharge(m3/s)
2.38
1.68
1.43
2.45
1.31
3.07
2.64
3.05
1.94
0.76
0.51
0.70
140
Alamata IDF
25 Year
25 Yea r
0.08 126.9228
120
0.17 102.3915
0.25 92.83498
0.33 81.31852
100
0.5 65.2746
1 42.06585
80
1.5 31.42851
2 25.02193
2.17 23.73014
60 2.33 22.72315
2.67 20.10121
3 18.13183
40
20
60
40
20
0
0 0.5 1 1.5 2 2.5 3 3.5
dUration(hr)
Sub-catchment slope Depth Width n
CM-1 0.04 0.6 1.2 0.04
CM-2 0.03 0.5 1.2 0.02
CM-3 0.02 0.5 1.2 0.035
CM-4 0.03 0.5 1 0.013
CM-5 0.025 0.3 0.6 0.03
CM-6 0.04 0.6 1.3 0.035
CM-7 0.03 0.5 1.2 0.016
CM-8 0.03 0.3 0.5 0.04
CM-9 0.01 0.4 1.2 0.04
CM-10 0.01 0.5 0.6 0.014
CM-11 0.01 0.3 0.5 0.035
CM-12 0.015 0.4 0.6 0.035
Depth=2*width
that is y=2*y A channel=2y^2, P=4y and R =
Q=
Excess Discharge
nation Using Rational Formula
0.5y
Peak Runoff Determination Using Rational Formula
For Chatchment -8
Year 2 Year 5 Year
Intensity (mm/hr) 25.00 28.00
p1=tc(hr)*I(mm/hr) 31.83 35.64
For Tc 1.27301395 Ia 21.63 21.63
(p-Ia)^2 103.99 196.47
(p-Ia)+S 118.34 122.15
Q=(P-Ia)^2/(P-Ia)+S(mm) 0.88 1.61
qu=α10^Co+C1logtc+C2(logtc)^2 0.13 0.13
qu*A*Q 3.51 6.43
For Chatchment -6
Year 2 Year 5 Year
Intensity (mm/hr) 32.00 40.00
Tc 0.87 p1=tc(hr)*I(mm/hr) 27.84 34.80
Ia 0.88 0.88
(p-Ia)^2 727.11 1150.91
(p-Ia)+S 135.10 142.06
Q=(P-Ia)^2/(P-Ia)+S(mm) 5.38 8.10
qu=α10^Co+C1logtc+C2(logtc)^2 0.17 0.17
qu*A*Q 1.95 2.94
Area(Km^2) Tc(hr)
0.9739 0.1108367778 56
1.6655 0.2477214003
31.7265 0.4981513082 46
36
S
108.1379263208
Depth=2*width
that is y=2*y A channel=2y^2, P=4y and R =
Q= R
0.5y
0.5
2.6666666667
y 2y Sub-catchment slope Depth
2.667 0.56 1.120673047057140 CM-1 0.04 0.6
2.667 0.11 0.225850893844619 CM-2 0.03 0.5
2.667 0.48 0.958150632099252 CM-3 0.02 0.5
2.667 0.04 0.087218088229502 CM-4 0.03 0.5
2.667 0.23 0.469110488449551 CM-5 0.025 0.3
2.667 0.64 1.275908252874390 CM-6 0.04 0.6
2.667 0.07 0.148798054144131 CM-7 0.03 0.5
2.667 6.91 CM-8 0.025 0.3
2.667 0.74 CM-9 0.01 0.4
2.667 0.09 CM-10 0.01 0.5
2.667 0.97 CM-11 0.01 0.3
2.667 0.69 CM-12 0.015 0.4
2.6666666667 2.666667
width n V(m/s) Discharge(m3/s)
1.2 0.04 2.24 2.581
1.2 0.02 3.64 2.185
1.2 0.035 1.70 1.020
1 0.013 5.29 2.644
0.6 0.03 1.49 0.268
1.3 0.035 2.63 2.392
1.2 0.016 4.55 2.732
0.5 0.04 1.05 2.480
1.2 0.04 0.97 0.463
0.6 0.014 2.34 0.702
0.5 0.035 0.76 0.114
0.6 0.035 1.08 0.259
SR=25.4[1000/CN-10]
PAGE 21 HE-232