0% found this document useful (0 votes)
296 views

Package Ss

package substation

Uploaded by

Nagaraj Vj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
296 views

Package Ss

package substation

Uploaded by

Nagaraj Vj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Form No.

F- 051 Issue Date: March 2006 Sheet 1 of 8

SAUD! ARAMCO PRE.COMMISSIONING FORM


OIL FILLED POWER TRANSFORMERS
Equipment Type: Packaqe Substation User Reference: NA
ent Taq No: 53207 Equipment Description: 53207
BI/JO No: NA Plant No. / Location; Udhalli
Ref. Drawinqs & Documents: NA
Manufacturer: STC
Model No: NA Serial No: 2018508583
Test Com n Date: 25-12-2018

FIELD INSTALLATION CHECKLIST

VISUAL INSPECTION

Yes No
a Inspect for physical damage to main tank, radiators and bushings, control cabinet tap
changer compartment and ancillary equipment. ^/
Z Campare transformer nameplate information with latest single line diagram and
proiect specifications. ^/
3. Check and record transfoffner main tank pressure. ./

4lf thr transformer is shipped with oil, Check and record the oil level in the main tank,
reservoir and load tap changer and bushings. ^/
5. Check and record oil temperature. {
6lrspe.t transformer main tank, tap changer, rudiators, pumps, bushings, fiffings, and
^/
auxiliary oil reservoir for oil leaks. Record and report any leaks.
7. Ct eck that instrument, control cabinet, and tank grounding is correctly installed and {
connected to the main ground system.
8. Wirittg ftom CT's, VT's, pumps, fans, temperature gauges/alarms, oil level {
indicators. and pressure relief devices is properly terminated in the conlrol 94bin9!
9. Veriff dehydrating breather is correctly installed. {

MECHANICAL INSPECTION

Yes No
1 Che.k ..ch"ricaloperation of off load tap changer or on-load tap changer through {
complete tap range. Verifl, the movement is positive and there is no dragging or

2. Cooting Ars and circulating pumps are properly installed and lubricated and rotate
^l
freely.
3. Check primary, secondary and ground connections.
^/
4. Inspect arresters for proper connection and alignment.
^/
1ectro-mechanical,therma1,hydraulic,pneumatic,
pressure relays and/or devices on or incorporated in ^/
and

ration/Maintenance Contraclor
Signature & Date
Copyright@Saudi Aramco 2009. All rights reserved.
Form No. P- 051 Issue Date: March 2006 Sheet 2 of I
SAUDI ARAMCO PRE.COMMISSIONING FORM
. :. OIL FILLED POWER TRAI\SFORMERS
Equipment Type: Package Substation User Fleference: NA
Equipment Tag No: 53207 Equipment Description: 53207
BI/JO No: NA Plant No" I Location: UdhalliYah
Ref. Drawings & Documents: NA
Manufacturer: STC
Model No: NA Serial No: 2018S08583
Test Completion Date: 25'12'2018

ELECTRICAL TESTS

Yes No
1. CT's checked for proper polarity, ratio and burden.
^/
2. VT's checked for proper polarity, ratio and burden. {
3. Radirtor fans and oil circulating pumps rotate in the correct direction.
^/

4. Nrltras".e and record relief and reset pressure and proper reset of pressure relief ./
devices. Check operation of electrical al
5. Check operation of auxiliary relays and alarm setting.
^/

@dtestperANSI/IEEEC57,l06.Seetableofacceptabletestvalues {
in the data section of this form..
7. @owerfactorofbushingsandwindingswithaDoble.Valuesof {
0.5% and lower are acceptable for transformers. Bushings should be within
manufacturer's published tolerance.
e of the core to ground with a250 volt megger by {
removing the intentional core ground and testing between the core ground shunt and
the transfoffner case.
9. Ivle"rsrre and record the resistance of each winding at each tap position. ./

turn'Sratiooneachtap.Deviationmustofnotmorethan+l- ./
0.5% are allowed.
@tolow&ground,lowtohigh&ground,highand[owtoground. ^/
12. @factortestset,meaSuretheexcitingcurrentforeachwinding. {
Two ii*ilur current readings for the outside phases and a lower current reading for
the center phase of a three unit is to be expected.
erswillbeverifiedtoconfirTnagreementwiththenameplate
^/
and contract specifications.
noftheon.loadtapchanger,localandremoteoperation
^/
and indication and operation of voltage sensing re

Witness i lOPeration/Mai
Signature & Date @fu,r
Copyright@Saudi Aramco 2009. All rights reserved.