Package Ss
Package Ss
VISUAL INSPECTION
Yes No
a Inspect for physical damage to main tank, radiators and bushings, control cabinet tap
changer compartment and ancillary equipment. ^/
Z Campare transformer nameplate information with latest single line diagram and
proiect specifications. ^/
3. Check and record transfoffner main tank pressure. ./
4lf thr transformer is shipped with oil, Check and record the oil level in the main tank,
reservoir and load tap changer and bushings. ^/
5. Check and record oil temperature. {
6lrspe.t transformer main tank, tap changer, rudiators, pumps, bushings, fiffings, and
^/
auxiliary oil reservoir for oil leaks. Record and report any leaks.
7. Ct eck that instrument, control cabinet, and tank grounding is correctly installed and {
connected to the main ground system.
8. Wirittg ftom CT's, VT's, pumps, fans, temperature gauges/alarms, oil level {
indicators. and pressure relief devices is properly terminated in the conlrol 94bin9!
9. Veriff dehydrating breather is correctly installed. {
MECHANICAL INSPECTION
Yes No
1 Che.k ..ch"ricaloperation of off load tap changer or on-load tap changer through {
complete tap range. Verifl, the movement is positive and there is no dragging or
2. Cooting Ars and circulating pumps are properly installed and lubricated and rotate
^l
freely.
3. Check primary, secondary and ground connections.
^/
4. Inspect arresters for proper connection and alignment.
^/
1ectro-mechanical,therma1,hydraulic,pneumatic,
pressure relays and/or devices on or incorporated in ^/
and
ration/Maintenance Contraclor
Signature & Date
Copyright@Saudi Aramco 2009. All rights reserved.
Form No. P- 051 Issue Date: March 2006 Sheet 2 of I
SAUDI ARAMCO PRE.COMMISSIONING FORM
. :. OIL FILLED POWER TRAI\SFORMERS
Equipment Type: Package Substation User Fleference: NA
Equipment Tag No: 53207 Equipment Description: 53207
BI/JO No: NA Plant No" I Location: UdhalliYah
Ref. Drawings & Documents: NA
Manufacturer: STC
Model No: NA Serial No: 2018S08583
Test Completion Date: 25'12'2018
ELECTRICAL TESTS
Yes No
1. CT's checked for proper polarity, ratio and burden.
^/
2. VT's checked for proper polarity, ratio and burden. {
3. Radirtor fans and oil circulating pumps rotate in the correct direction.
^/
4. Nrltras".e and record relief and reset pressure and proper reset of pressure relief ./
devices. Check operation of electrical al
5. Check operation of auxiliary relays and alarm setting.
^/
@dtestperANSI/IEEEC57,l06.Seetableofacceptabletestvalues {
in the data section of this form..
7. @owerfactorofbushingsandwindingswithaDoble.Valuesof {
0.5% and lower are acceptable for transformers. Bushings should be within
manufacturer's published tolerance.
e of the core to ground with a250 volt megger by {
removing the intentional core ground and testing between the core ground shunt and
the transfoffner case.
9. Ivle"rsrre and record the resistance of each winding at each tap position. ./
turn'Sratiooneachtap.Deviationmustofnotmorethan+l- ./
0.5% are allowed.
@tolow&ground,lowtohigh&ground,highand[owtoground. ^/
12. @factortestset,meaSuretheexcitingcurrentforeachwinding. {
Two ii*ilur current readings for the outside phases and a lower current reading for
the center phase of a three unit is to be expected.
erswillbeverifiedtoconfirTnagreementwiththenameplate
^/
and contract specifications.
noftheon.loadtapchanger,localandremoteoperation
^/
and indication and operation of voltage sensing re
Witness i lOPeration/Mai
Signature & Date @fu,r