embracing a full digitalization of the construction industry using the requirement of passing construction designs in paper
construction 4.0. The term ‘construction 4.0’ was coined from the
format through different construction professionals that are
industry 4.0 concept which is regarded as the fourth industrial
revolution that originated from Germany. A questionnaire was predisposed to making errors. Authors such as [6]-[8] opined
utilized for sourcing data distributed to practicing construction that the use of only BIM as a form of ICT for construction
professionals through a convenience sampling method. Using SPSS work is coming of age due to its interoperability and disjointed
v24, the hypotheses posed were tested with the Mann Whitney test. method of application. These shortcomings give rise to the
The result revealed that there are no differences between the adoption of industry 4.0 concepts as the future direction for
consulting and contracting organizations on the readiness for
the construction industry. Reference [9] suggested that
adopting construction 4.0 concepts in the construction industry.
Using factor analysis, the study discovers that adopting construction industry 4.0 has its origin in Germany manufacturing sector
4.0 will improve the performance of the construction industry and used as a synonym for the scheduled 4th industrial
regarding cost and time savings and also create sustainable buildings. revolution which represents the increase in the digitization of
In conclusion, the study determined that construction professionals the manufacturing sector towards enabling communication
have a low awareness towards construction 4.0 concepts. The study between the products, business, and customers.
recommends an increase in awareness of construction 4.0 concepts
Reference [10] asserted that applying industry 4.0 concepts
through seminars, workshops and training, while construction
professionals should take hold of the benefits of adopting to construction industry is a new concept using the Internet of
construction 4.0 concepts. The study contributes to the roadmap for Things (IoT) for the integration of information among
the implementation of construction industry 4.0 concepts in the South different platforms and adopting new gadgets like laser
African construction industry. scanning, drones, 3D printing with the expectation of
enhancing the ability to monitor construction projects at the
Keywords—Building information technology, Construction 4.0, design, construction and in use stages towards delivering
Industry 4.0, Smart Site.
sustainable and smart buildings. Similarly, [11] opined that the
construction industry 4.0 involves the digitalization of the
I. INTRODUCTION
industry towards producing a smart and intelligent way of
International Scholarly and Scientific Research & Innovation 12(3) 2018 206 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
industry. With most of the studies relating to construction with cost and time. Reference [23] asserted that finalizing
industry 4.0 concept such as; [10]-[12] carried out in countries construction projects on time and within the proposed budget
like the United Kingdom, America, and Germany pointing has remained a major challenge for the South Africa
towards the use of the concept in such countries and construction industry. Reference [24] attributed the delays to
highlighting the challenges of adopting construction industry the advancement and intricacy of construction projects;
4.0. Against this background, this study will examine the thereby, putting pressure on construction workers to deliver on
awareness and readiness of construction professionals towards time at the stipulated cost and at the right quality. Likewise,
adopting construction industry 4.0 in South Africa with the [14] affirmed that the construction industry is presently
intention of creating a roadmap for the implementation of characterized by the low performance of construction
construction industry 4.0 concepts in the South Africa professionals thereby leading to low quality of work and
construction industry. reduced productivity.
Studies done by [25], [3], [26] revealed that poor
II. REVIEW OF THE CONSTRUCTION INDUSTRY AND communication among construction sector members is one of
CONSTRUCTION 4.0 the major factors responsible for the poor performance of
A. Construction Industry in South Africa construction projects in Africa, with nearly two-thirds of
project problems caused by the inadequate exchange of
All over the world, including South Africa, the construction information, and inefficient communication. Likewise, [27]
industry is a significant sector of the economy that creates job
Open Science Index, Civil and Environmental Engineering Vol:12, No:3, 2018 waset.org/Publication/10008621
International Scholarly and Scientific Research & Innovation 12(3) 2018 207 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
small and medium-sized firm with low capabilities for improved construction project performance. The smart factory
investments in new technologies, make it difficult for the is further breaking down to the use of IoT, RFID (radio
applying industry 4.0. Reference [1] submitted that the low frequency identification) cyber-physical systems and many
investment in research and development of the construction others. The creation of the smart construction site is borne out
industry is responsible for the lack of innovation and of the innovative thinking of using internet sensors to monitor
technological progress. Despite this hindrance to the adoption construction work on site. Reference [16] opined that the use
of innovation in the construction industry, it has evolved of RFID in construction promotes the automation of the
through various stages as shown in Fig. 1. construction process by allowing effective tracking of
From Fig. 1, the first stage involves the use of crude tools equipment and tools, theft prevention and inventory
for construction such as shovels, diggers, and hoes; the second management, as the attached sensors can act as a tracker to
stage is driven by mechanization and the use of machinery like locate stolen items. Reference [34] suggested that the use of
backhoes, loaders, and cranes; while, the third stage is driven RFID could assist the construction industry in moving away
by information technology that has given birth to the rise of from reactive maintenance, as it will provide an opportunity
software such as BIM, and Revit, among others. This study for equipment and machines to automatically send
proposed the fourth stage referred to as construction 4.0 that performance data to engineers.
involves the digitalization of the construction industry, where The second stage of the conceptual framework is the
the internet, wireless sensors, software and other advanced simulation of construction projects due to the complex nature
Open Science Index, Civil and Environmental Engineering Vol:12, No:3, 2018 waset.org/Publication/10008621
technology such as lasers and drones work together towards of construction works. This stage involves the use of BIM,
enhancing construction project performance and improve virtual reality, 3D printing and many others. Reference [35]
client satisfaction. proclaimed that BIM is often used on construction sites due to
The main idea of construction 4.0 is directed at creating a its ability to provide a simulation about the technical
digital construction site assisted by attaching internet- information of the building regarding its cost estimate,
connected sensors on the equipment and each stage of the material inventories and time for completion. This suggests
construction project to monitor progress coupled with the use that BIM can be regarded as one of the first innovations
of drones and virtual simulation [1]. This opinion recognizes providing the background for construction 4.0. Authors such
construction 4.0 as the process of implementing modern as [7], [8], [23] reported the shortcomings of BIM and that to
technology to encourage the digitization of the construction enjoy its full benefits, the use of BIM needs to be merged with
industry as well as the supply chain; thereby, leading to an other technologies like cloud computing that facilitate the
increased performance of the sector. free-flow of information within the industry, as it is expected
Fig. 2, which shows the conceptual framework, recognizes to deliver fast information for construction professionals using
construction 4.0 as the creation of the smart construction site, cloud data storage.
simulation, and virtualization that will in return lead to
International Scholarly and Scientific Research & Innovation 12(3) 2018 208 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
III. METHODOLOGY (8%) have studied to the PhD level. The table shows that half
The success of a construction project is dependent on the (50%) of the respondents have work experience in the
communication and interaction among project theme construction industry in the range of 11-20 years, 30% have
members, so this study is based on the perspective of about 1-10 years, 14% have about 31-40 years, while 6% have
construction sector professionals. Towards meeting the work experience in the range of 41-50 years.
objectives of the study, which entails determining the
TABLE I
awareness and readiness of construction sector professionals SUMMARY OF BACKGROUND INFORMATION
in South Africa with the construction 4.0 concept, a Cumulative
Category of Respondents Frequency Percent (%)
quantitative research approach was adopted. This approach Percent
was used due to the ability to effectively study the relationship Consulting base 25 50 50
between facts and relate them in accordance with findings or Contracting organization 25 50 100
Total 50 100
theories from existing or past studies.
Highest Academic
The study adopted a convenience sampling technique, the Qualification
non-probabilistic sampling method. The instrument of data ND/Diploma 15 30.0 30.0
collection was a close-ended questionnaire addressed to B.Sc/ B.Tech 19 38.0 68.0
practicing construction professionals within Gauteng province M.sc/ MBA/ MPM 12 24.0 92.0
in Johannesburg, South Africa. The questions posed by the PhD 4 8.0 100
Open Science Index, Civil and Environmental Engineering Vol:12, No:3, 2018 waset.org/Publication/10008621
International Scholarly and Scientific Research & Innovation 12(3) 2018 209 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
Mean Rank
the chosen factors (importance of adopting construction 4.0)
Smart Construction Site
and supportive criterion for factorability.
Prefabrication/ Modularization 3.82 1
TABLE IV
Internet of things 3.55 2 KMO AND BARTLETT’S TEST
Automation 3.45 3 Kaiser-Meyer-Olkin Measure of Sampling Adequacy 0.642
Internet of services 3.27 4 Bartlett’s Test of Sphericity:
Product-lifecycle management (PLM) 3.18 5 Approx. Chi-square 1007.007
Human-computer interaction (HCI 2.64 6 Degree of freedom 120
Addictive manufacturing 2.64 7 Significant level 0.000
Radio-frequency identification (RFID) 2.45 8
Robotics 2.36 9
The study adopted the varimax rotation method, which
Cyber-physical systems (CPS) embedded systems 2.00 10
shows the 16 factors loaded differently on three components
Simulation tools
Building information modeling (BIM) 3.55 1
which form the importance of adopting construction 4.0, as
Augmented /virtual/mixed reality 2.82 2 reported in Table V.
Virtualization Items that have the highest coefficient in all the three
Mobile computing 3.64 1 components are usually considered. On the first component,
Social media 3.45 2 ‘creating sustainable buildings’ and ‘waste minimization’ are
Big data 2.91 3 the items with the highest component. Regarding the second
Cloud computing 2.36 4 component, ‘ensuring adequate construction planning’ and
‘encouraging seamless communication’ are the highest
C. Readiness to Adopt and Importance of Construction 4.0 loading factors; while in the third component, ‘time savings’
Having explained the different concepts of construction 4.0 and ‘cost savings’ were highly loaded.
to construction industry professionals, they were asked to The name given to the components is usually adopted from
indicate their readiness to adopt the concept and the assumed the highest item within each component; therefore, the three
importance they will derive when it is fully embraced within components obtained in the analysis are named thus; 1)
the industry. developing sustainable buildings, 2) increased communication
1) Readiness to Adopt Construction 4.0 among construction professionals, and 3) better performance
(cost and time savings) of construction projects. These are
Table III presents the response of respondents regarding
recognized as the three benefits of adopting construction 4.0
their readiness to adopt construction 4.0. The table shows that
for construction projects the sector in South Africa.
more than half of the respondents are ready to fully embrace
Although construction 4.0 is a new concept within the
the concept of construction 4.0 in their day-to-day
construction industry, some studies such as [27], [5], [28] also
construction work. This finding also corroborates the findings
discovered that digitalizing the industry through using various
of the study done by [11], [3], when they discovered that
internet-based communication systems (part of the
construction professionals are ready to adopt the use of
construction 4.0 concept), will enhance communication among
modern technologies for their day-to-day activities, but are
construction professionals, and in return, enhance
inhibited by their level of understanding of the technologies. It
sustainability of buildings and increase the performance of the
can be implied from these findings that low research into
construction industry. The advantages of applying industry 4.0
modern technologies is the main factor hindering the adoption
in the construction industry is similar to the same benefits of
of construction 4.0 within the South African construction
International Scholarly and Scientific Research & Innovation 12(3) 2018 210 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
using it in the manufacturing sector, as indicated by authors construction industry are on par in the willingness to adoption
such as [29]-[32], when they discovered that the application of of construction 4.0 for the construction industry.
the industry 4.0 concept has the capability of increasing the
performance of the manufacturing industry. V. CONCLUSION AND RECOMMENDATIONS
It can be implied from the findings of this study that to The construction industry is one of the most dynamic and
increase the sustainability of infrastructures provided by the responsive industrial sectors of any economy. This is because
construction industry and increase the overall performance of it is vital for the social and economic development of all
the sector in South Africa, there is a need to apply nations as a driver of the economic development providing an
construction 4.0 concepts to the industry. atmosphere where resources such as equipment, materials,
labor, and capital are traded to create an infrastructure within
TABLE V
ROTATED COMPONENT MATRIX an economy. Despite the industry importance to the country,
Component activities within the construction industry are characterized
1 2 3 with traditional approaches and little implementation of ICT
Creating sustainable buildings 0.894 that results in production of low quality infrastructure,
Waste minimization 0.823 thereby, affecting the overall performance of the construction
Enhancing safety 0.795 industry.
Facilitating harmonious relationships with other
0.736 This study proposes the adoption of construction 4.0 by
Open Science Index, Civil and Environmental Engineering Vol:12, No:3, 2018 waset.org/Publication/10008621
professionals
construction industry professionals in order to improve the
Improving the image of the construction industry 0.643
Improving the quality of construction project 0.595
overall performance of the sector in South Africa. The concept
Ensuring adequate construction planning, of construction 4.0 was developed from industry 4.0, which
0.839
monitoring, and control represents the 4th industrial revolution, and which has thrived
Encouraging seamless communication throughout successfully in the manufacturing sector and entails the
0.810
the organization
Automation of site production activities 0.725
merging of the physical and virtual world using the Internet of
It encourages employee’s participation in the Things, simulation and virtualization. This study recognizes
0.668
decision-making process that construction 4.0 will be driven by the need to create a
Enhancing client satisfaction 0.661 smart construction site, as well as adopt simulation tools and
Reducing errors 0.571 virtualization for construction works. The study concludes that
Improving communication among construction
professionals
0.560 construction professionals in South Africa have a low
Time savings 0.879 awareness towards construction 4.0 principles but are ready to
Cost savings 0.821 adopt it due to its benefits which include the development of
On-time and on budget delivery 0.636 sustainable buildings, better communication among
construction professionals and elimination of construction
D. Difference between Contracting and Consulting project delays in the form of cost and time overrun.
Organization on the Readiness to Adopt Construction 4.0 The study recommends that stakeholders in the construction
Concepts industry should take advantage of the construction 4.0
The analysis deploys Mann-Whitney U test, a non- concept, and therefore, create more awareness. Also,
parametric alternative of the Independent t-test, to carry out an investment should be made into research on the adoption of
inferential investigation on the difference between the modern technologies and innovative ideas for the construction
contracting and consulting organization on the readiness to industry in South Africa. Finally, construction sector
adopt construction 4.0 concepts. The results of the analysis are professionals should adopt a proactive thinking approach to
presented in Table VI. their daily construction activities.
TABLE VI
MANN-WHITNEY U TEST FOR SIGNIFICANT DIFFERENCE IN READINESS TO
ACKNOWLEDGMENT
ADOPT CONSTRUCTION 4.0 BETWEEN CONTRACTING AND CONSULTING The authors appreciate the respondents who took their time
CONSTRUCTION FIRMS
to diligently fill out the questionnaire.
Readiness to adopt
construction 4.0
Mann-Whitney U 12.500 REFERENCES
Wilcoxon W 33.500 [1] T. D. Oesterreich and F. Teuteberg, “Understanding the implications of
Z -0.457 digitisation and automation in the context of industry 4.0.A triangulation
approach and elements of a research agenda for the construction
Asymp. Sig. (2-tailed) 0.647
industry”, Computer in industry Vol.83, No.10, 2016, pp. 121-139.
Remark Not Sig. [2] CIDB, “Construction quality in South Africa, a client perspective,”
Retrieved on 13th September 2017 from
As depicted in Table VII, since p<0.05 (i.e. 0.03), at a 5% https://bizconnect.standardbank.co.za/sector-
news/construction/swotanalysis-of-the-construction-sector-in-south-
level of significance, a statistically significant difference was africa.aspx, 2016.
not found between contracting and consulting firms in the [3] L. G. Tipili, P. O. Ojeba and M. S. Ilyasu, “Evaluating the effects of
readiness to adopt. This means that all stakeholders within the communication in construction project delivery in Nigeria” Journal of
environmental science and technology, Vol.2, No.5,2014, pp.48-54.
International Scholarly and Scientific Research & Innovation 12(3) 2018 211 ISNI:0000000091950263
World Academy of Science, Engineering and Technology
International Journal of Civil and Environmental Engineering
Vol:12, No:3, 2018
[4] G. B. Shrestha and M. M Kumaraswamy, “Problems in Technology Engineering and Management, Vol. 15, No. 3, pp 269-280.
Transfer vs. Potential for Technology Exchange,” A Hong Kong [26] N. S. Priyadharshini and K. S. Satheesh, “Project communication is key
construction perspective, Vol. 2, No.3, 2011, pp. 23-34. to productive construction and its research needs in the future of
[5] S. Mak, “A model of information management for construction using construction engineering and management,” International journal of
information technology,” Automation in Construction, Vol. 21 No.10, science, technology and management, Vol.4, No.1,2015, pp 1493-1499.
2011, pp. 257–263. [27] X. Li, Q. Li, W. Wu, and W. Wang, “Application of supply chain
[6] O. A. Olatunji, “Modelling the costs of corporate implementation of management in construction project,” proceedings of the national doctor
building information modelling,” Journal of Financial Management of research forum, 21-23 Shanghai, China, 2007, pp 34-46.
Property and Construction, Vol.16, No.1, 2011, pp. 211-23. [28] P. Nitithamyong and M. J. Skibniewski, “Web-based construction
[7] P. L. Fernandes, “Advantages and disadvantages of BIM platforms on project management systems: how to make them successful,”
construction site,” Retrieved on the 29th August 2017 from Automation in Construction, Vol.4, No.13, 2004 491– 506.
https://repositorio-aberto.up.pt/bitstream/10216/68980/2/26948.pdf, [29] K. Daniel and R. Muller, “Industry 4.0 and its impact on
2013. internationalization,” Retrieved on 14th September 2017 from
[8] N. Thurairajah and D. Goucher, “Advantages and challenges of using https://www.s ge.com/sites/default/files/cserver/static/downloads/S-
BIM,” Retrieved on the 1st September 2017 from consultant perspective. GE_Whitepaper_Industry40_2016_final.pdf , 2016.
http://ascpro.ascweb.org/chair/paper/CPRT114002013.pdf, 2016. [30] V. H. Heynitz and M. Bremicker, “Industry 4.0 The factory of the future
[9] Y. Lu, “Industry 4.0 a survey on technologies, applications and open its challenges,” Retrieved on 13th September 2017 from
research issues. Journal of industrial information integration Vol. 6, https://assets.kpmg.com/content/dam/kpmg/es/pdf/2017/06/the-factory-
No.1, 2017, pp. 1-10. of-the-future.pdf, 2016.
[10] M. Buss and M. White, “The rise of construction 4.0,” Retrieved on the [31] F. Zezluka, P. Marcon, I. Vesley and O. Sajid, “Industry 4.0 an
1st September 2017 from introduction in the phenomenon,” IFAC-papers online Vol.49,
https://www.youtube.com/watch?v=BBNbpq24m9o&t=2702s, 2016. No.25,2016, pp. 008-012.
[11] D. Montgomery, “The future for construction product manufacturing. [32] R. M. Mahamood and E. T Akinlabi, E. T, “Functionality graded
Open Science Index, Civil and Environmental Engineering Vol:12, No:3, 2018 waset.org/Publication/10008621
Digitalisation, industry and the circular economy,” Retrieved on the 1st materials mining, metallurgy and materials engineering,” Springers
September 2017 from http://www.thefis.org/wp- eleven edition, 2017.
content/uploads/2016/10/cpa-future-of-construction-product- [33] BDC, “Industry 4.0 the new industrial revolution are Canadian
manufacturing-report-2016.pdf, 2016. manufacturers ready,” Retrieved on 13th September 2017 from
[12] R. Antunes and V. Gonzalez, “A production model for construction: a https://bridgr.co/wp-content/uploads/2017/06/bdc-etude-manufacturing-
theoretical framewok, “Buildings, MDPI journals, Vol.5, No.1, 2015, en.pdf, 2016.
pp. 209-228. [34] J. M Sardroud, “Influence of RFID technology on automated
[13] M. D. Mathonsi and W. D. Thwala, “Factors influencing the selection of management of construction materials and components,” Science Iran,
procurement systems in the south African construction industry” African Vol. 19, No.3, 2012, pp.381-392.
journal of business management Vol.6, No.10, 2012, pp. 3583-3594. [35] J. Morrissy and Mansfield, “BIM best thing since sliced bread,”
[14] R. Fischer, “Productivity in the construction industry,” Unpublished BSc Retrieved on the 1st September 2017 from
thesis submitted at the faculty of engineering, built environment and https://www.dlapiper.com/~/media/Files/Insights/Publications/2012/01/
information technology at the University of Pretoria 2009. BIM%20%20Best%20thing%20since%20sliced%20bread/Files/Enginee
[15] N. T. Adugna, “A study of causes of delay and cost overrun in office ring_Construction_Legal_Upate_BIM_31_Janu__/FileAttachment/Engi
construction projects in the ethekwini municipal area, South Africa,” neering_Construction_Legal_Upate_BIM_31_Janu__.pdf, 2012.
Unpublished master thesis submitted to the faculty of Engineering and [36] W. Shahzad, J. Mbachu and N. Domingo, “Marginal productivity gained
built environment at Durban university of technology South Africa, through prefabrication building projects in Auckland,” Buildings, Vol. 5,
2009. No. 1, 2015, pp.196-208.
[16] A. M. Costin and J. Telzer, “Fusing passive RFID and BIM for [37] F. E. Boafo and J. Kim, “Performance of modular prefabricated
increased accuracy in indoor localization,” Visualization in Engineering, architecture case study based review and future pathways,”
Vol.3, No.17, 2015, pp 1-20. Sustainability, Vol. 8, No. 1, 2016, pp.1-16.
[17] A. S. Fitchett, “Skills development and employment creation through
small public buildings in south Africa,” Retrieved on 12st September
2017
http://wiredspace.wits.ac.za/bitstream/handle/10539/7217/A%20Fitchett.
PDF, 2009.
[18] S. Mbeki, “Causes, effects and impacts of shortage of skilled artisans on
contractor productivity,” Unpublished master thesis submitted to the
department of construction management and quantity surveying Cape
Peninsula University of Technology South Africa, 2009.
[19] N. Crampton, “Swot analysis of the construction sector in south Africa,”
Retrieved on 13th September 2017 from
https://bizconnect.standardbank.co.za/sector-news/construction/swot-
analysis-of-the-construction-sector-in-south-africa.aspx, 2016.
[20] M. G. Dzunisani, “Implementation of government housing delivery
programme in the gravellote area of ba-phalaborwa municipality,
“Unpublished master thesis submitted at the school of leadership
University of Limpopo, 2011.
[21] PWC, “Highlighting trends in the South African construction industry.
Retrieved on 12th September 2017 from
https://www.pwc.co.za/en/assets/pdf/sa-construction-2015.pdf, 2015.
[22] B. Flyvbjerg, M. K. Holm and S. L. Buhl, “How common and how large
are cost overruns in Transport infrastructure projects,” Transport
Reviews, Vol. 23, No. 2, 2003, pp 71-88.
[23] A. A. Olatunji, “Influence on Construction Project Delivery Time,”
University of Nelson Mandela Metropolitan University, and unpublished
PhD thesis, 2009.
[24] A. Enshassi, S. Mohammed and J. Mosa, “Risk management in building
projects: contractors' perspective,” Emirates Journal for Engineering
Research, Vol. 13 No.1, 2008 pp 29-44.
[25] A. Enshassi, S. Mohammed and S. Abushaban, “Factors affecting the
performance of construction projects in the Gaza Strip,” Journal of Civil
International Scholarly and Scientific Research & Innovation 12(3) 2018 212 ISNI:0000000091950263