F.hse.07 Work Permit
F.hse.07 Work Permit
Work clearance from __________hrs of date__________To________hrs of date __________(Valid for the shift unless renewed)
Issued to (Department / Section / Contractor)
___________________________________________________________
Exact Location of work (Area / Unit / Equipment no.
etc)________________________________________________________
Description of work _____________________________________________________________________________________
_____________________________________________________________________________________________________
_
THE FOLLOWING ITEMS SHALL BE CHECKED BEFORE ISSUING THE PERMIT
(Tick mark in the appropriate box)
Sr Done Not Sr Done Not
no
Item Reqd. no.
Item Reqd
A General points D Entry to confined Space
1 Work Area inspected 1 Portable equipment / nozzles properly grounded
Standby persons provided for entry to confined
2 Surrounding area checked, cleaned and covered 2 space
Sewers, manholes, etc and hot surfaces nearby
3
covere 3 Portable equipemts inspected
Considered hazard from other operations and
4 4 Proper means of exit / escape provided
concerned persons alerted.
5 Tool box conducted 5 Proper ventilation and Lighting providing
Area cordoned off and Precautionary tags / Boards Proper Rescue Equipments identified and easily
6
provided. 6 acesible
7 PPE provided 7 24 V hand lamp provided
Gas / Oxygen deficiency test done
8. Equipments & power supply checked 5 (Oxygen level -19.5% - 23.5%)
REMARKS:
1. The activity has the following expected residual hazards (Tick the relevant items): Lack of
Oxygen / H2S, Toxic Gases / Combustible gases / Pyrophoric Iron / Corrosive Chemicals / Steam – Condensate / Others
2. Following PPEs to be used in addition to standards PPEs (Helmet, Safety Shoes, Hand gloves,
Boiler suit): Face Shield / Apron / Goggles / Dust Respirator / Fresh Air Mask / Lifeline / Full body Safety Harness with
double lanyard / Airline / Earmuff etc.
3. Additional precautions if
any:.___________________________________________________________________________
___________________________________________________________________________________
1. Contractor (Receiver) Contractor
2. Applicant Name &
Representative Name & Representative Applicant Signature
Designation
Designation Signature
Clearance renewal
Additional Issuer Name,
Contractor
Time precautions Designation and
Representative Applicant Name,
if any, Signature EHS Name, Designation
Name, Designation &
Date Otherwise Sign
From To Designation, & Signature
mention
Signature
“NIL”
Date & Time Name & Designation Signature Date & Time Name & Designation Signature
Issuer: Verified that the job has been completed and area EHS (Concur):
cleaned and is safe from any hazard.
Date & Time Name & Designation Signature Date & Time Name & Designation Signature
Authority:
Issuer: Any area incharge/ Plant manager/ Maintenance manager/ Plant head engineer and above, responsible for the area can
be an issuing authority.
Receiver: Site –in-charge or his representative from the contractor who has good knowledge about the work to be the receiver
of the permit.
Applicant: Any supreme engineer followed which work can be started.
Concur: supreme SO/E will be the Concurring party. Once the Work started after the receiver, applicant, issuer. Supreme
SO/E will be re ensure the Permit compliances.
………………………………………………………………………………………………………
General Instructions:
1. The work permit shall be filled up carefully and accurately in clear handwriting ensuring that complete information is provided in all sections / subsections and none of column is
left blank. Sketches should be provided wherever possible to avoid miscommunication.
2. Appropriate safe guards and required personnel protective equipment shall be determined by a careful analysis of the potential hazards and the operations to be performed prior to
starting the work.
3. In case of fire alarm / siren, all work must immediately be stopped.
4. Only certified vehicle / engines and permitted type of electrical equipment and tools are allowed in operating areas.
5. Welding machines should be located in non-hazardous and ventilated areas.
6. No hot work should be permitted unless the explosive meter reading is Zero.
7. When a person is entering confined space, the receiver must keep minimum two standby-designated persons at the manhole or entry point.
8. Before box up of any vessel manhole cover, ensure that no men / materials are inside the vessel.
9. For renewal of work clearance, the issuer shall ensure that the conditions are satisfactory for the work to continue. If the conditions have changed, it may be necessary to issue a new
permit or amend the existing permit.
10.This clearance on the same permit can be renewed / extended upto a maximum of seven calendar days.
11.This permit must be available at work site at all times.
12.On completion of the work, the permit must be closed and kept as record.
13.The industry may add other relevant instructions based on their operating and maintenance practices.
14.Tool box talk conducted by job supervisor
15.Relevant inspection checklist must be attached with permit
16.Job safety analysis must be attached with permit
HSE: 07 REV : 01 Issue No: 02 Issue Date : 03.02.2019