10. Ensure that overload relays are selected & set as per the actual connected
load.
11. Ensure that the interlocking is done as speci ed.
12. Ensure the metering connections are proper.
13. Check manually the breakers of all the cubicles in the LV switchgear.
14. Check for proper sliding of the cubicles in the rails for all draw out modules.
15. Check the termination of the cables to the bus bars are tightened to the
required torque using torque wrench.