Electrical Checklist All

The document provides maintenance instructions for various electrical systems. It lists 7 systems: 1) distribution board, 2) rising and literal mains, 3) sub-main wiring/cabling, 4) wiring accessories, 5) structured cabling system, 6) final sub-circuit, and 7) lighting management control system. For each system, it outlines various work descriptions to check on and inspection results to record during preventative maintenance. The goal is to inspect for issues like loose connections, abnormal sounds or smells, and ensure systems are functioning properly.

Uploaded by

dinie90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
5K views

Electrical Checklist All

The document provides maintenance instructions for various electrical systems. It lists 7 systems: 1) distribution board, 2) rising and literal mains, 3) sub-main wiring/cabling, 4) wiring accessories, 5) structured cabling system, 6) final sub-circuit, and 7) lighting management control system. For each system, it outlines various work descriptions to check on and inspection results to record during preventative maintenance. The goal is to inspect for issues like loose connections, abnormal sounds or smells, and ensure systems are functioning properly.

Uploaded by

dinie90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 32

KFM/P7.5.

1/MI01(01)
MAINTENANCE INSTRUCTION SHEET
(DISTRIBUTION BOARD)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 Distribution Board

a Cleaned the room

b Checked the lighting

c Checked the emergency light

d Retighten termination

e Checked the MCB

f Checked MCCB

g Checked ELCB / ELR

h Checked by pass switch

i Checked the relay

j Any abnormal sound (spark/harming)

k Any abnormal smell

l Running Ampere ( max = 70% )

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI02(01)
MAINTENANCE INSTRUCTION SHEET
(RISING AND LITERAL MAINS)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 RISING AND LITERAL MAINS

a Cleaned the room

b Checked the lighting

c Checked the emergency light

d Any abnormal sound

e Any abnormal smell

f Visual check for all termination ( loose/contact)

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI03(01)
MAINTENANCE INSTRUCTION SHEET
(SUB-MAIN WIRING/CABLING)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 SUB-MAIN WIRING/CABLING

a Clean the room

b Checked the lighting

c Retighten cable termination

d Condition of cable tray ( loose/tight )

e Any abnormal sound

f Any abnormal smell

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI04(01)

MAINTENANCE INSTRUCTION SHEET


(WIRING ACCESSORIES)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 WIRING ACCESSORIES
Check the coloring for conduit and trunking not
a
damage
Check termination clamp for conduit and
b
trunking
Check cover for trunking and conduit accessories
c
not missing
d Check all joint in good condition ( loose/contact )

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI05(01)

MAINTENANCE INSTRUCTION SHEET


(STRUCTURED CABLING SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 STRUCTURED CABLING SYSTEM

a Retighten cable termination

b To check incoming cable

c To check outgoing cable


To visual check insulation cable incoming and
d
outgoing
e Condition of cable tray

f Condition of cable clamp

g Condition of fire barrel

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI06(01)
MAINTENANCE INSTRUCTION SHEET
(FINAL SUB-CIRCUIT)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 FINAL SUB-CIRCUIT

a Clean the room

b Checked the lighting

c Retighten cable termination

d To check incoming cable

e To check outgoing cable


To visual check insulation cable incoming and
f
outgoing

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI07(01)
MAINTENANCE INSTRUCTION SHEET
(LIGHTING MANAGEMENT CONTROL SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 LIGHTING MANAGEMENT,CONTROL SYSTEM

a Blow dust

b Retighten cable termination

c Test system ( Auto/Manual )

d Check the isolator / MCCB

e To check indicator light

f To check incoming cable

g To check out going cable

e Lighting control system

i. To visually check controller relay

ii. To check manual switch

iii. To visually check main controller

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI08(01)

MAINTENANCE INSTRUCTION SHEET


(FIRE BARRIEL)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 FIRE BARRIEL

a Check the colouring not damage


Check the enclosed area of the paste fully
b
covered
Check the joint between trunking with paste
c
secure
Check the surrounding area of the paste not
d
cracked
Check the surface of the paste not hardebed or
e
brittle

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI09(01)
MAINTENANCE INSTRUCTION SHEET
(FEEDER PILLAR)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 FEEDER PILLAR

a Vacuum dust

b Retighten termination

c Check contactor

d Check timer ( bypassed )

e Check ELCB / EFR

f Check MCCB

g Check indicator lamp

h Lighting

i Any abnormal sound and smell

j Earth leakage test

k Functionality & availability test (control circuit)

l Functionality & availability test (lamp)

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI10(01)

MAINTENANCE INSTRUCTION SHEET


(PABX)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 PABX

a To check power supply (240 V +5%)

b Ensure all termination is well terminated


To check all the patch cords cable and ensure no
c
damage
d Clean and service panel

e Retighten the connection it necessary

f Ensure all labeling are tally with as built drawing

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI11(01)
MAINTENANCE INSTRUCTION SHEET
(LIGHTNING PROTECTION SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 LIGHTNING PROTECTION SYSTEM

Visual inspection all components of lightning


a protection system, air termination, down drop
and test connections

Ensure that all final/copper tape in good


b
condition ( Connection/corrosion/continuity )

Ensure structural support for system and check


c
support addles for copper tape

Check down conductor from test joint too earth


d
chambers ( Connection/corrosion/continuity )
Test conductor for earth continuity and ensure
e that the overall impedance does not exceed 10Ω
( x≤ 5Ω )

f Record counter device reading

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI12(01)
MAINTENANCE INSTRUCTION SHEET
(EARTHING SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 EARTHING SYSTEM

a Retighten all connections, terminations, earthing


Retighten all earth electrode terminations and
b
ensure corrosive free at rod
Test and measure earth electrode impedance
c
(Only for January and July)
Ensure that concrete inspection box for earth
d
electrode in good condition
Ensure marking & tagging of earth electrode in
e
intelligible
f Check connection to electrode/continuity check

g Check connection at equipment side

h Check for burn marks


Visually inspect all component of lightning
i
arrester
j Check copper tape connection
Check air termination ( roof top )
k
(Only for January and July)

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI13(01)

MAINTENANCE INSTRUCTION SHEET


(MATV SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 MATV SYSTEM

a Check the TV set condition

b Check the TV picture quality

c Check for all TV channels


Ensure the volume are follow standard level
d
( ≤ 35 dB )
e Ensure all the labeling is according to the drawing
Check all connectors & terminators
f
( Connection/corrosion/continuity )
g Clean the TV set

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI14(01)

MAINTENANCE INSTRUCTION SHEET


(WATER HEATER)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 WATER HEATER

a Clean Water Heater


Ensure That No Water Leakage To The
b Connecting Pipe And Tank-Replace/Repair If
Faulty
c Ensure Indicator Light Working Properly

d Ensure Pressure Control Function Properly

e Ensure Safety Valve Function Perfectly

f Verify and Load Record (Running Amp ≤ 70%)

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI15(01)
MAINTENANCE INSTRUCTION SHEET
(AUDIO AND VIDEO SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 AUDIO AND VIDEO SYSTEM
(1.1) Video Screen & Projection System
Inspect metal base frame of monitor, screen, and
a
rollers for corrosion, repair or paint if corroded.
Service video cassette player, laser vision player,
b caption camera, computers and related
equipment as per duration.
c Test master power supply.
d Retighten all connections and termination.
e Ensure screen unit is functional.
f Clean large screen PMMA for stain dirt’s.
(1.2) Sound Reinforcement System
Inspect for functionality of complete sound
a
reinforcement system.
Clean power amplifier, speakers, paging and
b
other audio related equipment.
c Retighten all connections & termination
(1.3) Conference System
Inspect for functionality of complete conference
a
system.
Clean power amplifier, delegate conferences sets
b
and other related equipment
c Retighten all connections & termination.

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI16(01)

MAINTENANCE INSTRUCTION SHEET


(PA SYSTEM)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 PA SYSTEM

a Check the audio cable connector & termination

b Check the control cable connector & termination


Test the call station by making announcement &
observe the following operation :
a) Indicators on the button
c
b) Volume level ( ≤ 35 dB )
c) Variable volume
d) Selection buttons

d Clean call station

e Ensure the power supply is available

f Ensure the power supply cord in good condition

g Ensure the cassette player in good condition

h Ensure the CD player in good condition

i Ensure the radio in good condition


Ensure the speaker was function in all level
j
( ≤ 35 dB )
k Vacuum dust and clean the external casing cover

l To test microphone can be use

m retighten connection if necessary

n Ensure indication light in good condition

o Ensure CD and tape can be use


Check and test amplifier and ensure all are well
p
functioning
Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI17(01)
MAINTENANCE INSTRUCTION SHEET
(BCS)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 BCS

A Check monthly schedule calendar

B Check hardware condition

C Check software condition

D Check printer connection

E Check network controlling capability

F Check cabling condition

G Defrag disk

H Cleaning parts in computer

I Vacuum dust

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI18(01)
MAINTENANCE INSTRUCTION SHEET
(GENSET)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 GENSET

A Room is clean.

B Room is dry & no oil spot on floor.

C Generator set unit is clean & no dust.

D AMF board is clean & no dust.

E Engine oil at right level. ( Minimum 75% )

F Radiator water at the right level. (100%)

G Check any leakage at water pump.

H Check radiator fan belt.

I Check rubber hose.

J Check linkages between fuel pump & solenoid.

K Check color of smoke at exhaust.

L Check all gauge/meter.

M Check engine control panel.

N Check battery charger. ( minimum 0.5 A )

O Check battery voltage. (24 ≤ X ≤ 35) V

P Check battery SG. (5 ≤ X ≤ 7) ph

Q Check battery connections. (Corrosive/oxide)

R Check battery electrolyte at the right level.

S Check & retighten bolt/nut.

T Check turbocharger. (2 ≤ X ≤ 6) A
U Drain off diesel tank.
Check diesel level in main tank & service tank.
V
(Minimum 0.75 %)
W Check fuel transfer pump (diesel tank).
Load Test Data(5 min):
Time:

Voltage (415 V +5%)


R-Y:
Y-B:
B-R:

Ampere (max = 2000A)


X
R:
Y:
B:

Engine speed(1500 rpm):


Freq (50 Hz):
T. radiator( 70 deg. C):
T. Room( 32 deg. C):
Oil pressure:

Load Test Data(10 min):


Time:

Voltage (415 V +5%)


R-Y:
Y-B:
B-R:

Ampere (max = 2000A)


Y
R:
Y:
B:

Engine speed(1500 rpm):


Freq(50 Hz):
T. radiator(90 deg. C):
T. Room(35 deg. C):
Oil pressure:

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI19(01)
MAINTENANCE INSTRUCTION SHEET
(LV SWITCHGEAR SSB-1/BKN)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR SSB-1/BKN

(1.1) CONSUMERS SSB-1


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 800A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)

(1.2) CONSUMERS BKN


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 800A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)


Ensure all indicator light, selector switches, voltmeter,
F ammeter, power factor meter working properly - replace if
faulty
G Verify and retighten cable connecter

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:
Date: Date:
KFM/P7.5.1/MI20(01)

MAINTENANCE INSTRUCTION SHEET


(LV SWITCHGEAR A/C MSB-1/MSB-2)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR A/C MSB-1/MSB-2

(1.1) CONSUMERS A/C MSB-1


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 3200 A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)

(1.2) CONSUMERS A/C MSB-2


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 3200 A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)


Ensure all indicator light, selector switches, voltmeter,
F ammeter, power factor meter working properly - replace if
faulty
G Verify and retighten cable connecter

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:

Date: Date:
KFM/P7.5.1/MI21(01)
MAINTENANCE INSTRUCTION SHEET
(LV SWITCHGEAR MSB-1/MSB-2)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR MSB-1/MSB-2

(1.1) CONSUMERS MSB-1


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 3200 A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)

(1.2) CONSUMERS MSB-2


Voltage RY: YB: BR: (3phase=
A
415V +5%)
Voltage (1phase) RN: YN: BN:
B
(1phase= 240V +5%)
C AMP(A) (max = 3200 A)

D kA (max = 50 kA)

E PF (Main Panel) (0.85 ≤ X ≤ 1)


Ensure all indicator light, selector switches, voltmeter,
F ammeter, power factor meter working properly - replace if
faulty
G Verify and retighten cable connecter

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI22(01)
MAINTENANCE INSTRUCTION SHEET
(PV MSB)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) PV MAIN DB

A Voltage (V) RY: YB: BR:

B Voltage (1phase) RN: YN: BN:

C AMP(A)

D kA

E PF (Main Panel) (0.85 ≤ X ≤ 1)


Ensure all indicator light, selector switches, voltmeter,
F ammeter, power factor meter working properly - replace if
faulty
(1.2) PV MAIN DB 1

A Voltage (V) RY: YB: BR:

B Voltage (1phase) RN: YN: BN:

C AMP(A)

D kA

E PF (Main Panel) (0.85 ≤ X ≤ 1)


Ensure all indicator light, selector switches, voltmeter,
F ammeter, power factor meter working properly - replace if
faulty

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:
Date: Date:
KFM/P7.5.1/MI23(01)
MAINTENANCE INSTRUCTION SHEET
(HARMONIC FILTER)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) AHF MSB 1A

A Voltage HD (%) V1: V2: V3:

B AMP HD (%) I1: I2: I3:

C RUNNING AMP(A) :

D AHF TEMPERATURE (0C)

E VENTILATION FAN : OK / FAIL

F AHF CONDITION : CLEAN / DIRTY

(1.2) AHF MSB 1B

A Voltage HD (%) V1: V2: V3:

B AMP HD (%) I1: I2: I3:

C RUNNING AMP(A) :

D AHF TEMPERATURE (0C)

E VENTILATION FAN : OK / FAIL

F Voltage HD (%) V1: V2: V3:

AHF CONDITION : CLEAN / DIRTY

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI24(01)
MAINTENANCE INSTRUCTION SHEET
(HARMONIC FILTER)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) AHF MSB 2A

A Voltage HD (%) V1: V2: V3:

B AMP HD (%) I1: I2: I3:

C RUNNING AMP(A) :

D AHF TEMPERATURE (0C)

E VENTILATION FAN : OK / FAIL

F AHF CONDITION : CLEAN / DIRTY

(1.2) AHF MSB 2B

A Voltage HD (%) V1: V2: V3:

B AMP HD (%) I1: I2: I3:

C RUNNING AMP(A) :

D AHF TEMPERATURE (0C)

E VENTILATION FAN : OK / FAIL

F AHF CONDITION : CLEAN / DIRTY

G Voltage HD (%) V1: V2: V3:

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI25(01)
MAINTENANCE INSTRUCTION SHEET
(ROTARY UPS)
1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 ROTARY UPS
A Inspect for leakage of acid - replace cell if any.
B Record individual battery voltage. (24 ≤ X ≤ 35)V
C Clean terminal from acid corrosion, if any
Record individual battery impedance-
D
(5≤ X ≤ 20 mΩ).
Inspect connections between cells are secure
E
clean and lubricate with petroleum jelly.
Re-measure and records cell output voltage after
F
maintenance in battery log sheet.
G Record battery discharge curve.
H Ensure cleanliness at cubicles.
Tighten all connections (Mechanical and
I
Electrical).
Clean all heat sink, capacitor and P.C.B's (use dry
J
brush or vacuum cleaner)
K Ensure the cleanliness of cubicles
L Ensure all electrical connections perfectly
M Ensure control circuit working perfectly
N Inspect completeness of switch functions
Ensure the cleanliness of 'cubicles'(Maintenance
O
by-pass switch)
Inspect completeness of harmonic spectrum and
P
distortions
R Record downstream neutral earth voltage
Conduct mandatory power failure simulation test
S for UPS (to be done concurrently with gen-set
test)
Inspect for leaks deformation on A.C and D.C
T
capacitors

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:

Date: Date:
KFM/P7.5.1/MI26(01)
MAINTENANCE INSTRUCTION SHEET
(TRANSFORMER)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 TRANSFORMER
(1.1) Transformer No.T1A
Temperature :
A
(Alarm = 120 0C, Trip= 150 0C)
B Any sparking sounds (Yes/No) :

C Any Abnormal sounds (Yes/No) :

(1.2) Transformer No.T2A


Temperature :
A
(Alarm = 120 0C, Trip= 150 0C)
B Any sparking sounds (Yes/No) :

C Any Abnormal sounds (Yes/No) :

(1.3) Transformer No.T1B


Temperature :
A
(Alarm = 120 0C, Trip= 150 0C)
B Any sparking sounds (Yes/No) :

C Any Abnormal sounds (Yes/No) :

E Transformer No.T2B
Temperature :
F
(Alarm = 120 0C, Trip= 150 0C)
G Any sparking sounds (Yes/No) :

H Any Abnormal sounds (Yes/No) :

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:

Date: Date:
KFM/P7.5.1/MI27(01)
MAINTENANCE INSTRUCTION SHEET
(HT SWITCHGEAR)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 HT SWITCHGEAR

A All indicator light condition

B Battery charger DC amp (0.1 ≤X ≤6) A

C Battery charger DC volt (24 ≤ X ≤ 35)V

D Battery charger selector (float / booster)

E Battery charger water level (max / min)

F Panel condition

G Room condition (Dirty/Clean)

H Room temperature

I Voltage (KV) (11 kV)

J Incoming(ABB/SRDG) RY: YB: BR:


AMP(A) R: Y: B:
K
(max = 100 A)
AMP(T1A) R: Y: B:
L
(max = 100 A)
AMP(T2A) R: Y: B:
M
(max = 100 A)
AMP(T1B) R: Y: B:
N
(max = 100 A)
AMP(T2B) R: Y: B:
O
(max = 100 A)

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI28(01)
MAINTENANCE INSTRUCTION SHEET
(BIPV)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
1 Distribution Board

A Cleaned the board

B Checked the power generated (kW) & (A)

C Checked the voltage generated (V)

D Retighten termination

E Checked the MCB

F Checked MCCB

G Checked ELCB / ELR

H Checked by pass switch

I Checked the relay

J Any abnormal sound (spark/harming)

K Any abnormal smell

L Check the inverter

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI29(01)
MAINTENANCE INSTRUCTION SHEET
(PARANS SOLAR LIGHTING)

1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
A Check incoming supply

B Cleaned the solar receiver surface


Checked solar receiver status (facing the light
C
source)
D Checked light generated (indoor)

E Any abnormality

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date:
KFM/P7.5.1/MI30(01)
MAINTENANCE INSTRUCTION SHEET
(DPM SYSTEM)

1 Client / Institution PMO 4 Scheduled Date For PPM

2 Asset No. 5 Actual Date Work Done

3 Work Order No.

Result
No. Work Description Frequency
Yes No N/A Remark
a Check Status

b Data Logged

c Checked cleanness

d Any abnormality

Verification
Prepared by: Verified by:

………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)

Name: Name:

Date: Date: