Inspection Request Form

This inspection request form provides details of construction items ready for inspection at a project site. It lists the contractor, project number, inspection date and time, description of items to be inspected, and confirms coordination with relevant subcontractors. The second page documents the consultant's inspection of items like shuttering, steelwork, and concreting and their approval or requests for revision.

Uploaded by

Yash Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Inspection Request Form

This inspection request form provides details of construction items ready for inspection at a project site. It lists the contractor, project number, inspection date and time, description of items to be inspected, and confirms coordination with relevant subcontractors. The second page documents the consultant's inspection of items like shuttering, steelwork, and concreting and their approval or requests for revision.

Uploaded by

Yash Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

China Harbour Engineering Co.L.L.C.

INSPECTION REQUEST FORM


CONTRACTOR: Construction General Contracting House Ltd Request No.: ________________
Project No.: ____________________________________ Date: _____________________
Previous Request No.: ___________

TO: The Consultant


The following items are ready for your inspection on (Date): ____________________ at (time) ________________
Location ______________________________________ Level ____________________ Axis __________________
Drawing ref.: __________________________________________________________________________________

Description:

We certify that the above items have been coordinated with the following Subcontractors and other relevant projects

Electrical __________________ Mechanical _________________ Elevators ________________ Others _________________

All requests must be submitted at least 24 hours prior to the required inspection and approval.

Request Date ______________________ Time ____________________ Project Manager ______________________________


(Contractor)

2222
Received Date ________________ Time _______________ Consultant (Stamp & Sign) ________________

Consultant’s Inspection Report


*Shuttering *Steel / Openings *Concreting
Dimension / Stability ____ Edges / chamfers _____ Brand _________ Cage Stability______ Class & Type _____ Amb Temp ________
Cleanliness ___________ Release Agent _______ Size Spacing ____ Box Out __________ Slump __________ No. of Cubes ______
Straightness ___________ Lifting Accessories ____ Conc. Cover ____ Dowel Bars _______ Conc. Temp _____ Vibration _________

Inspector Signature & Date

Surveyor

Material Engineer

Electrical / Mechanical Engineer

ARE

Consultant’s Approval / Comments: Approved Approved as Noted Revise & Resubmit Rejected

PM / RE

Sign & Date

Received Date ____________________________________________ Time ___________________ Contractor’s Rep ___________________________________

cc: Consultant ( ), Contractor, ( ) Other, ( )