Implementation of Critical Path Method and Project Evaluation and Review Technique
Implementation of Critical Path Method and Project Evaluation and Review Technique
net/publication/265421349
CITATIONS READS
2 7,553
2 authors, including:
Ali Göksu
University of Eurasia
30 PUBLICATIONS 86 CITATIONS
SEE PROFILE
Some of the authors of this publication are also working on these related projects:
Working on organization of the International Conference on Economic and Social Studies 2017 (ICESoS 2017) View project
All content following this page was uploaded by Ali Göksu on 09 September 2014.
Porter, M. E. (2009). The Competitive Advantage of Nations, States, and Regions, Harvard
Business School, Advanced Management Program.
Singh, A., (1999). Competition Policy, development and developing Countries, Indian
Council for research on international economic relations, New Delhi.
Vietor, R.H.K. (2006). Strategy, Structure, and Government in the Global Economy, Harvard
Business School Press ,Boston, Massachusetts.
Abstract
Because of the growing effects of the globalization in various business environments,
the manufacturing industry is expected to be effective and yet efficient. According to this, in
205
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
1.INTRODUCTION
Planning, Scheduling (or organising) and Control are considered to be basic Managerial
functions, and CPM/PERT has been rightfully accorded due importance in the literature on
Operations Research and Quantitative Analysis. Far more than the technical benefits, it was
found that PERT/CPM provided a focus around which managers could brain-storm and put
their ideas together. Most important, it became a useful tool for evaluating the performance of
individuals and teams. The research study is fueled by the following objectives: First is to
determine the activities that are involved in the manufacturing proces in selected company.
Second is to demonstrate the benefits, as well as the drawbacks that those methods might
create in the organization. And third is to demonstrate the influence of CPM and PERT in the
entire furniture industry and its competitiveness. This paper comprises the possibility to
generate importance of CPM and PERT methods in reducing the project completion time and
costs in furniture industry. The study can gain advantages that are helpful in the continuous
progress of the investigation. One of those advantages is to cover the literature gaps
concerning the past studies related to the same subject. In addition, through the collection of
information, the study can emphasize the idea about the methods applied in production
process in furniture industry.
the deterministic CPM presents few problems of interest. Feng, Liu, & Burns, (2000)
presented a hybrid approach that combines simulation techniques with a genetic algorithm to
solve the time-cost trade-off problem under uncertainty. Lu and Li (2003) suggest that
redundant relationships be removed before the backward pass, but they do not provide a
procedure as to how to remove them. In response to some shortcomings of the CPM model,
Kuchta (2002) proposed a fuzzy method to measure the criticality of project activities and the
whole project. In another study, Jassbi (2008) proposed a fuzzy inference system to
determine activities’ criticality in deterministic networks. Mota (2009) presented a model for
supporting project managers to focus on the main tasks of a project. They used a multiple
criteria decision aid (MCDA) approach and considered several points of view in their study.
2.MATHEMATICAL PROGRAMMING
Mathematical Programming (MP) is the use of mathematical models, particularly
optimizing models, to assist in taking decisions. The term 'Programming' antedates computers
and means 'preparing a schedule of activities'. Mathematical Programming is more restrictive
in what it can represent than other techniques and it is very suitable for problems involving
blending, continuous flow processing, production and distribution, and strategic planning.
Critical path is the sequence of activities which add up to the longest overall duration. It
is the shortest time possible to complete the project. Any delay of an activity on the critical
path directly impacts the planned project completion date (there is no float on the critical
path). A project can have several, parallel, near critical paths. An additional parallel path
through the network with the total durations shorter than the critical path is called a sub-
critical or non-critical path.
Critical activity – activity with zero float .
207
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
3.FURNITURE INDUSTRY
The furniture industry is essentially an assembling industry, which employs various raw
materials to manufacture its products. They range from wood and wood based panels to
metals, plastics, textile, leather and glass. The European furniture sector comprises
around 150,000 companies, generates a turnover of almost €126 billion and an added value of
€38 billion and employs around 1.4 million people (EU27, 2006). From 2005 production
volumes increased slightly but in 2008 this positive trend was reversed and production
dropped again. Major factors of competitiveness for the sector consist of research and
innovation, skills and quality, design and added value, knowledge and know-how, together
with better access to third country markets.
3.1. Current trends in Bosnia
A major trend is taking a page from the past and giving it a fresh new look. Old
furnishings are looking new again, adding features and new tricks of the trade to give them an
updated look that is perfect for today's homes. After years of dulled hues and beige, walls are
coming alive with colors. Some are even adopting an extremely bright palette to rid their
home of the bland colors associated with bland economic times. Others are adding just a
splash of color to make a room really pop. Another current trend is adding décor that is
influenced by the music scene. Furniture is all about comfort, too. Look for large, overstuffed
pieces and ergonomic designs that welcome you to relax and recharge. Modular furniture is
208
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
still popular, since it allows those on a budget to mix and match furnishings. This style is
especially popular in urban communities, which tend to also gravitate toward modern and
contemporary furniture, which by the way never seems to go out of style.
3.2.Manufacturing Process
Before start of manufacturing of any furniture product a desired design is selected.
Selection of elegant design is important to ensure attractive finished product. The seasoned
wood blocks are cut into desired shape and slices according to the requirement of design.
The slices of wood are molded into the desired shape according to the design. Carving means
different elegant pattern carved in the wood. Quality of carving depends on the skills of the
labor. Once the different pieces are carved & molded than these parts/pieces are assembled
or fixed together to give the shape to the final product. Assembled product is grind to make
the surface smooth. Once the surface is smooth, finishing material is applied to make the
surface ready for paint or polish. After the base is prepared final finishing is applied
depending on requirement in term of paint/polish. Upholstery of fabric is carried out
according requirement of design.
This paper describes the implementation of the traditional PERT/CPM algorithm for
finding the critical path in a project network. An example of manufacturing furniture with
various activities will be used. The completion time of each activity is not known with
certainty; only estimates are available. It is expected that final, quantitative results will point
out the importance of implementing those methods in planning, scheduling and controlling a
project in terms of providing effectiveness and efficiency of furniture company.
209
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
4.4.Defining Problem
To answer to research question, six products from different product lines have been
selected. In order to define ‘critical path’, project duration and cumulative project costs for
all of this products, time and cost of all activities in production process need to be presented
in table. The obtained findings are expected to show that these techniques considerably
reduce the project completion time. All findings will be compared with previous data of the
company (project duration and cumulative project costs of selected products). This paper
will help to all managers in furniture industry to implement CPM and PERT to their projects,
and by doing that, they will improve effectivness and efficiency of their organizations.
Futhermore, it may challenge other researchers to fullfil gaps in literature reviews related to
this topic.
4.5.Study Restriction
PERT is a probabilistic tool used with three and its basically a tool for planning while
CPM is a deterministic tool and also allows and explicit estimate of and control of time.
PERT is more suitable for R&D related while CPM is best suited for routine and those
projects where the project is performed for projects where time and cost estimates can the
210
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
first time and the estimate of duration be accurately calculated. The probability factor is
major in PERT while in CPM the deterministic factor is more so values outcomes may not be
exact.
5.RESULT
CPM and PERT considerably reduce the project completion time in furniture comapany
Dallas. At the end of the study, the result is expected to help all the individuals as well as
the companies to understand more the concept of CPM and PERT methods in reducing the
project completion time and costs. Apparently, as it is expected the final, quantitative results
point out the importance of implementing those methods in planning, scheduling and
controlling a project in terms of providing effectiveness and efficiency of furniture company.
The same routine have been done on six selected products and obtained findings showed that
these techniques considerably reduce the project completion time. All findings are compared
with previous data of the company (project duration and cumulative project costs of selected
products). Because it confirms the hypothesis, this paper will help to all managers in
furniture industry to implement CPM and PERT to their projects, and by doing that, they will
improve effectivness and efficiency of their organizations.
6.CONCLUSION
One of the most challenging jobs that any manager in furniture companies can take on is
the management of a large-scale project that requires coordinating numerous activities
throughout the process of making the final product. A myriad of details must be considered in
planning how to coordinate all these activities, in developing a realistic schedule, and then in
monitoring the progress of the project. Fortunately, two closely related operations research
techniques, PERT (program evaluation and review technique) and CPM (critical path
method), are available to assist the project manager in carrying out these responsibilities.
These techniques make heavy use of networks to help plan and display the coordination of
all the activities. They also normally use a software package to deal with all the data needed
to develop schedule information and then to monitor the progress of the project. Project
management software, such as MS Project in your OR Courseware, now is widely available
for these purposes.
REFERENCES
[1] Dan Trietsch , Kenneth R. Baker, PERT 21: Fitting PERT/CPM for use in the 21st
century, International Journal of Project Management 30 (2012) 490–502, Available
online at www.sciencedirect.com
211
3rd International Symposium on Sustainable Development, May 31 - June 01 2012, Sarajevo
[5] Rafael Herrer&'as Pleguezuelo, Jos&e Garc&'a P&erez, Salvador Cruz Rambaud, A
note on the reasonableness of PERT hypotheses, Operations Research Letters 31 (2003)
60 – 62, Available online at www.sciencedirect.com
[6] S.M.T. Fatemi Ghomi, E. Teimouri, Path critical index and activity critical index in
PERT networks, European Journal of Operational Research 141 (2002) 147–152,
Available online at www.sciencedirect.com
[7] U.,A., Bakshi and A.,V.,Bakshi, (2010) Network Analysis, Technical Publications,
Pune
[8] http://www.eudoxus.com/lp-training/1-what-is-mathematical-programming
[9] http://www.mindtools.com/critpath.html
[10] http://www.netmba.com/operations/project/pert/
[11] http://people.brunel.ac.uk/~mastjjb/jeb/or/netanal.html
[12] http://www.stanford.edu/class/cee320/CEE320B/CPM.pdf
212