7" Liner Cement Calculation Proposal: Marvin Peter Bjservices (M) SDN BHD
7" Liner Cement Calculation Proposal: Marvin Peter Bjservices (M) SDN BHD
Tail
Open Hole 8 1/2 inch Material gal/sk Total gal Gal/10bbl Drm
Casing OD 7 inch Cmt G 160.1
Casing ID 6 1/5 inch FP9L 0.05 8.0 2.7 0.1
R21L 0.05 8.0 2.7 0.1
CD33L 0.35 56.0 18.9 1.0
BJXL 0.60 96.0 32.3 1.7
BA58L 0.80 128.0 43.1 2.3
MCS-A 20
MCS-W Spacer 3600 6 Kits
Landing Collar 5947.64 Displacement
Description Size From To Volume (bbls)
Csg. Shoe 6035.00 ft Stickup 5.5 22.00 0.00 0.49
Total Depth 6040.00 ft 5 1/2" Drillpipe 5.5 106.88 0.0 2.37
5 1/2" HWDP 5.5 567.30 106.88 9.06
5 1/2" Drillpipe 5.5 4458.43 567.3 86.18
Hanger / ZXP Packer / Running Tools 47.0 0.41
Shearing Plug @ +/- 98.50 bbls 7" Liner 7 5947.6 4505.39 53.58
Bump Plug @ +/- 1 152.08 bbls Surface Line 2.00
Under Displacement
Total Displacement Volume(bbls) 152.08