7" Liner Cement Calculation Proposal: Marvin Peter Bjservices (M) SDN BHD

This document provides a cement calculation proposal for well J4-A11 Slot# 4. It details the volumes and capacities of the liner, drill pipe, and other downhole equipment. It then calculates the required slurry volume, mix water, cement quantities, and displacement volumes needed. The total displacement volume calculated is 152.08 barrels.

Uploaded by

shahaljawaie87
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

7" Liner Cement Calculation Proposal: Marvin Peter Bjservices (M) SDN BHD

This document provides a cement calculation proposal for well J4-A11 Slot# 4. It details the volumes and capacities of the liner, drill pipe, and other downhole equipment. It then calculates the required slurry volume, mix water, cement quantities, and displacement volumes needed. The total displacement volume calculated is 152.08 barrels.

Uploaded by

shahaljawaie87
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

7" Liner Cement Calculation Proposal

Well Name: J4-A11 Slot# 4

Volume And Capacity


Description Capacity
OD ID Hole ID bbl/ft
Swivel sub 22 ft Hanger / ZXP Packer /Running Tools 3 0.00874
Liner 7.00 6.184 0.03715
Open Hole 8.50 0.07018
5 1/2" DP 5 1/2" Drillpipe 5.50 4.78 0.02215
5 1/2" HWDP 5.50 4.50 0.01967
Liner - Csg 7.00 8.76 0.02686
Liner - Open Hole 7.00 8.50 0.02259
Rig Floor 0.00
Slurry Calculation Excess 10%
Lead Tail
Descriptions ft bbls ft bbls
Liner 0 0.0 87.4 3.2
Liner - Csg 0.0 0.0 228 6.1
Liner - Open Hole 0.0 0.0 1341.2 30.3
5 1/2" HWDP 106.88 ft Excess 0.0 3.0
Open Hole 0 0.0 5.0 0.35
5 1/2" DP 567.30 Excess 0.0

Descriptions Lead Tail Total


Slurry volume 0.0 43.0 43.0 bbl
Cuft 0.0 241.7 241.7 cuft
Cement (sxs) 0.0 160.1 160.1 sxs
Cement (MT) 0.0 6.8 6.8 MT
X Over Mix water(bbl) 0 30 30 bbl
Running Tools 4458.43 ft
Slurry Composition
ZXP Packer 4466.22 ft Description Lead Tail
Density (ppg) 0 14.5
Yield (cuft/sxs) 2.14 1.51
Liner Hanger 4488.04 ft Total Fluids (gps) 12.46 7.79

Wiper Plug 4505.39 ft Material Requirement


Lead
Material gal/sk Total gal Gal/10bbl Drm
Csg ID 8 3/4 inch Cmt G 0.0
FP9L 0.00 0.0 0.0 0.0
R21L 0.00 0.0 0.0 0.0
CD33L 0.00 0.0 0.0 0.0
9 5/8" Shoe 4693.79 ft BJXL 0.00 0.0 0.0 0.0
BA58L 0.00 0.0 0.0 0.0

Tail
Open Hole 8 1/2 inch Material gal/sk Total gal Gal/10bbl Drm
Casing OD 7 inch Cmt G 160.1
Casing ID 6 1/5 inch FP9L 0.05 8.0 2.7 0.1
R21L 0.05 8.0 2.7 0.1
CD33L 0.35 56.0 18.9 1.0
BJXL 0.60 96.0 32.3 1.7
BA58L 0.80 128.0 43.1 2.3
MCS-A 20
MCS-W Spacer 3600 6 Kits
Landing Collar 5947.64 Displacement
Description Size From To Volume (bbls)
Csg. Shoe 6035.00 ft Stickup 5.5 22.00 0.00 0.49
Total Depth 6040.00 ft 5 1/2" Drillpipe 5.5 106.88 0.0 2.37
5 1/2" HWDP 5.5 567.30 106.88 9.06
5 1/2" Drillpipe 5.5 4458.43 567.3 86.18
Hanger / ZXP Packer / Running Tools 47.0 0.41
Shearing Plug @ +/- 98.50 bbls 7" Liner 7 5947.6 4505.39 53.58
Bump Plug @ +/- 1 152.08 bbls Surface Line 2.00
Under Displacement
Total Displacement Volume(bbls) 152.08

Marvin Peter BJServices (M) Sdn Bhd.