Wind Loading (ASCE7-10)
Wind Loading (ASCE7-10)
24.8 ft
32 ft 65 ft
Plan Elevation
Building data
Type of roof; Monoslope
Length of building; b = 32.00 ft
Width of building; d = 65.00 ft
Height to eaves; H = 18.00 ft
Pitch of roof; 0 = 6.0 deg
Mean height; h = 18.00 ft
General wind load requirements
Basic wind speed; V = 100.0 mph
Risk category; II
Velocity pressure exponent coeff (Table 26.6-1); Kd = 0.85
Exposure category (cl.26.7.3); B
Enclosure classification (cl.26.10); Partially enclosed buildings
Internal pressure coef +ve (Table 26.11-1); GCpi_p = 0.55
Internal pressure coef –ve (Table 26.11-1); GCpi_n = -0.55
Gust effect factor; Gf = 0.85
Topography
Topography factor not significant; Kzt = 1.0
Velocity pressure equation; q = 0.00256 Kz Kzt Kd V2 1psf/mph2;
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 576.00 ft2
Projected vertical area of roof; Avert_r_0 = b d tan(0) = 218.62 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 11.0 kips
Leeward net force; Fl = Fw,wB = -8.3 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 0.8 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 11.0 kips
Roof load case 2 - Wind 0, GCpi -0.55, -1cpe
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_0 = b H = 576.00 ft2
Projected vertical area of roof; Avert_r_0 = b d tan(0) = 218.62 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 11.0 kips
Leeward net force; Fl = Fw,wB = 3.1 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 = 9.0 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 11.0 kips
Roof load case 3 - Wind 90, GCpi 0.55, -cpe
Ext pressure Peak velocity
Ref. Net pressure Area Net force
Zone coefficient pressure
height (ft) p (psf) Aref (ft2) Fw (kips)
cpe qp, (psf)
A (-ve) 18.00 -0.93 13.06 -17.46 588.22 -10.27
B (-ve) 18.00 -0.87 13.06 -16.89 588.22 -9.94
C (-ve) 18.00 -0.52 13.06 -13.01 915.01 -11.90
Total vertical net force; Fw,v = -31.93 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 3 - Wind 90, GCpi 0.55, -cpe
Ext pressure Peak velocity
Ref. Net pressure Area Net force
Zone coefficient pressure
height (ft) p (psf) Aref (ft2) Fw (kips)
cpe qp, (psf)
A1 15.00 0.80 12.40 1.25 975.00 1.22
A2 15.00 0.80 12.40 1.25 0.00 0.00
A3 24.83 0.80 14.33 2.56 417.03 1.07
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d (H + d tan(0) / 2) = 1392.03 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 22.3 kips
Leeward net force; Fl = Fw,wB = -17.7 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 2.3 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 22.3 kips
Roof load case 4 - Wind 90, GCpi -0.55, +cpe
Ext pressure Peak velocity
Ref. Net pressure Area Net force
Zone coefficient pressure
height (ft) p (psf) Aref (ft2) Fw (kips)
cpe qp, (psf)
A (+ve) 18.00 -0.18 13.06 5.18 588.22 3.05
B (+ve) 18.00 -0.18 13.06 5.18 588.22 3.05
C (+ve) 18.00 -0.18 13.06 5.18 915.01 4.74
Total vertical net force; Fw,v = 10.78 kips
Total horizontal net force; Fw,h = 0.00 kips
Walls load case 4 - Wind 90, GCpi -0.55, +cpe
Ext pressure Peak velocity
Ref. Net pressure Area Net force
Zone coefficient pressure
height (ft) p (psf) Aref (ft2) Fw (kips)
cpe qp, (psf)
A1 15.00 0.80 12.40 15.61 975.00 15.22
A2 15.00 0.80 12.40 15.61 0.00 0.00
A3 24.83 0.80 14.33 16.93 417.03 7.06
B 18.00 -0.50 13.06 1.63 1392.03 2.27
C 18.00 -0.70 13.06 -0.59 576.00 -0.34
D 18.00 -0.70 13.06 -0.59 794.62 -0.47
Overall loading
Projected vertical plan area of wall; Avert_w_90 = d (H + d tan(0) / 2) = 1392.03 ft2
Projected vertical area of roof; Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 22.3 kips
Leeward net force; Fl = Fw,wB = 2.3 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 22.3 kips
Overall horizontal loading; Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 22.3 kips
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_180 = b (H + d tan(0)) = 794.62 ft2
Projected vertical area of roof; Avert_r_180 = b d tan(0) = 218.62 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_180 + pmin_r Avert_r_180 = 14.5 kips
Leeward net force; Fl = Fw,wB = -6.0 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 1.4 kips
Overall horizontal loading; Fw,total = max(Fw - Fl - Fw,h, Fw,total_min) = 14.5 kips
Roof load case 6 - Wind 180, GCpi -0.55, -cpe
Ext pressure Peak velocity
Ref. Net pressure Area Net force
Zone coefficient pressure
height (ft) p (psf) Aref (ft2) Fw (kips)
cpe qp, (psf)
A (+ve) 18.00 -0.18 13.06 5.18 289.59 1.50
B (+ve) 18.00 -0.18 13.06 5.18 289.59 1.50
C (+ve) 18.00 -0.18 13.06 5.18 579.17 3.00
D (+ve) 18.00 -0.18 13.06 5.18 933.11 4.84
Total vertical net force; Fw,v = 10.78 kips
Total horizontal net force; Fw,h = 1.13 kips
Walls load case 6 - Wind 180, GCpi -0.55, -cpe
Project Job Ref.
Overall loading
Projected vertical plan area of wall; Avert_w_180 = b (H + d tan(0)) = 794.62 ft2
Projected vertical area of roof; Avert_r_180 = b d tan(0) = 218.62 ft2
Minimum overall horizontal loading; Fw,total_min = pmin_w Avert_w_180 + pmin_r Avert_r_180 = 14.5 kips
Leeward net force; Fl = Fw,wB = 2.2 kips
Windward net force; Fw = Fw,wA_1 + Fw,wA_2 + Fw,wA_3 = 12.8 kips
Overall horizontal loading; Fw,total = max(Fw - Fl - Fw,h, Fw,total_min) = 14.5 kips
32 ft
29 ft
D
65 ft
18 ft
C
9 ft
B
9 ft
A
Wind - 0o
A2
18 ft
A1
32 ft
Windward face
24.8 ft
24.8 ft
D B
65 ft 32 ft
Side face Leeward face
32 ft
Wind - 90o
65 ft
A B C
9 ft 9 ft 14 ft
A3
24.8 ft
A2
A1
65 ft
24.8 ft Windward face
24.8 ft
B
D
32 ft 65 ft
Side face Leeward face
Wind - 180o
9 ft
A
9 ft
B
18 ft
C
65 ft
29 ft
32 ft
A3
24.8 ft
A2
A1
32 ft
Windward face
18 ft
18 ft
D B
65 ft 32 ft
Side face Leeward face