0% found this document useful (0 votes)
53 views1 page

Lor 03130

New 490m Retaining Wall Permanent Road Diversion New 205m Viaduct Carrying Up Trent Valley Lines over New High Speed Lines. New 80m Bridge over Flood Plain New Wood End Lane Overbridge and Permanent Road Diversion. New 205m Viaduct carrying up the valley lines over the New high speed line. New Route 878 Route 848 New 95m Retaining Wall Plan Scale 1:10000 160. 160. 140. Route 878 130.

Uploaded by

HighSpeedRail
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

Lor 03130

New 490m Retaining Wall Permanent Road Diversion New 205m Viaduct Carrying Up Trent Valley Lines over New High Speed Lines. New 80m Bridge over Flood Plain New Wood End Lane Overbridge and Permanent Road Diversion. New 205m Viaduct carrying up the valley lines over the New high speed line. New Route 878 Route 848 New 95m Retaining Wall Plan Scale 1:10000 160. 160. 140. Route 878 130.

Uploaded by

HighSpeedRail
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A1 A B C D E F G H I J K L M N O P

RW -
DR- dgn
03130.
N

07-
ARP-
1 New 490m Retaining Wall

HS2-
e 3\
Permanent Road Diversion

Rout
New 205m Viaduct carrying New 80m Bridge over Flood Plain
Up Trent Valley lines over

es\
New High Speed Lines

of
an and Pr l
i
ForCont

Pl
Pe

e\
r
ma

_Rout
ne
nt
La
nd

ne_of
Re
2 New Wood End Lane Overbridge

inuat
and permanent road diversion

07_Li
ngs\
ion Ref

awi
0_Dr
ngs\
erTo HS2-

awi
03 Dr
Route 878 Route 848

oj a\
ectDat 4-
3

ARP-

er
nt nalPr
07-

4I
00\
209742-
DR-
New 95m Retaining Wall

RW -

209000\
185+000
186+000
187+000
188+000
188+628

\
031 29

J:
4

Plan
Scale 1:10000

160.0 160.0

150.0 150.0

6 140.0 140.0
Route 878 Route 848

130.0 130.0
New 205m Viaduct Carrying
Up Trent Valley Lines over
120.0 New High Speed Lines 120.0
80m Bridge over Flood Plain

110.0 110.0
New Wood End Lane Overbridge

100.0 100.0

90.0 90.0
7

80.0 80.0

70.0 70.0

60.0 60.0

50.0 50.0

All of Cut Materials Are Reusable


40.0 40.0

188+600

188+500

188+400

188+300

188+200

188+100

188+000

187+900

187+800

187+700

187+600

187+500

187+400

187+300

187+200

187+100

187+000

186+900

186+800

186+700

186+600

186+500

186+400

186+300

186+200

186+100

186+000

185+900

185+800

185+700

185+600
188+629
8

Chainage

L=3939.7
Horizontal Alignment

L=3342.
8
G=0.
04%
Vertical Alignment
1

1
2

2
4

4
7

7
8

8
5
79.

77.

71.
79.

79.

77.

78.

80.

80.
78.

77.
80.

78.

78.

76.

75.

79.

77.

76.

77.

80.

81.
78.

80.

75.

76.

76.

77.

78.

77.

73.
78.
9
Existing Level

1
2

2
4

0
7

6
8

8
5

78.

78.
78.

78.

78.
78.

78.

78.

78.

78.
78.

78.

78.

78.

78.

78.

78.

78.

78.

77.

77.

77.
78.

77.

77.

77.

77.

77.

77.
78.

78.

78.
Proposed Level

1
2

2
4

0
6

7
9

8
5

5
+0.

+2.

+0.

+0.

+0.

4.
2.

+1.
0.

2.

+1.

2.

+4.

3.
0.

+0.

0.

+1.

+2.

0.

+1.

+6.
0.

+0.
+2.

1.

+0.

+0.

+0.

2.

-
-
-

-
-

-
-

-
Cut and Fill

250km/h
Maximum Speed:
10

Profile
Scale H 1:10000 V 1:1000
Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown
copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.

Environmental Features Legend Special Areas of Conservation National Parks


Notes Client Job Title Drawing Title

High Speed 2 Route 3


Listed buildings Special Protection Areas Flood Risk Zones 1.For notes and legend information refer to the 2.0 11/1109
/ MJEP CB PH Feasibility Study Plan and Profile
keyplan information on drawing no.:
Area of Outstanding Natural Beauty National Nature Reserves HS2-ARP-07-DR-RW-03100
Additional Features Shown Sheet 30 of 30
2.For an outline summary of material and ground Drawing Status Job No
The Arup Campus, Blythe Gate, Blythe Valley Park
RAMSAR Parks and Gardens conditions present beneath scheme refer to final 1.0 22/
10/
09 HW CL PH
Solihull, West Midlands B90 8AE
report.
Scale at A1 T +44(0)121 213 3000 F +44(0)121 213 3001 For Co-ordination 209742-00
For Co-ordination 1:10000
www.arup.com
World Heritage Site Scheduled Ancient Monuments 3. Refer to drawing HS2-ARP-05-DR-RW-15106 Drawing No Issue
Discipline
for more detailed information on the Rail
Historical Battlefields
Issue Date By Chkd Appd
HS2-ARP-07-DR-RW-03130 2.0
SSSI West Coast Tie-in arrangement

Do not scale ' Arup

You might also like