Test Strategy Example
Test Strategy Example
TEST PLAN
Version <1.0>
<mm/dd/yyyy>
Page 2 of 9
[Insert appropriate disclaimer(s)]
TABLE OF CONTENTS
1 INTRODUCTION..............................................................................................................4
1.1 Purpose of The Test Plan Document ............................................................4
2 TEST ITEM........................................................................................................................4
2.1 Project description ...............................................................................................4
2.2 Items to be Tested / Not Tested ..........................................................................4
2.3 Items to be excluded............................................................................................4
2.4 Test Approach(s) .................................................................................................4
2.5 Test Pass / Fail Criteria .......................................................................................4
2.6 Test Entry / Exit Criteria .....................................................................................4
2.7 Test Deliverables .................................................................................................5
2.8 Test Suspension / Resumption Criteria ...............................................................5
2.9 Staffing / Training Needs ....................................................................................5
3 RISK AND MITIGATION ...............................................................................................5
3.1 Test Risks / Issues ...............................................................................................5
4 TEST ENVIRONMENT AND INFRASTRUCTURE ...................................................5
4.1 Required Infrastructure .......................................................................................5
4.2 Availability Plan .................................................................................................5
5 ROLES AND RESPONSIBILITIES ................................................................................5
5.1 Roles and assigned responsibilities .....................................................................5
6 TEST SCHEDULE ............................................................................................................6
6.1 Milestones and schedule .....................................................................................6
TEST PLAN APPROVAL .....................................................................................................7
APPENDIX A: REFERENCES ............................................................................................8
APPENDIX B: KEY TERMS ................................................................................................9
Page 3 of 9
[Insert appropriate disclaimer(s)]
1 INTRODUCTION
1.1 PURPOSE OF THE TEST PLAN DOCUMENT
[Brief introduction about the project and objective of the current release. Project could
be platform configuration tool and objective could new mobile App interface or new
feature / enhancement in existing product or defect fixes.]
2 TEST ITEM
2.1 PROJECT DESCRIPTION
[Describe the project for which Test Plan is prepared.]
2.2 ITEMS TO BE TESTED / NOT TO BE TESTED
[In scope features. This could be newly added or updated features. Indirect features that
has technical or functional dependency on newly added or updated features. Out of
scope feature. Excluded product features from current Test Plan.]
Page 4 of 9
[Insert appropriate disclaimer(s)]
2.7 TEST DELIVERABLES
[Describe the deliverables that will result from the testing process (documents, reports,
charts, etc.).]
2.8 TEST SUSPENSION / RESUMPTION CRITERIA
[Describe the suspension criteria that may be used to suspend all or portions of testing.
Also describe the resumption criteria that may be used to resume testing.]
2.9 STAFFING / TRAINING NEEDS
[Describe any specific requirements needed for the testing to be performed (staffing,
skills training, etc).)]
Role Responsibility
Page 5 of 9
[Insert appropriate disclaimer(s)]
6 TEST SCHEDULE
6.1 MILESTONES AND SCHEDULE
[Describe the describe key milestones, deliverables, efforts, start date and end date]
Page 6 of 9
[Insert appropriate disclaimer(s)]
TEST PLAN APPROVAL
The undersigned acknowledge they have reviewed the <Project Name> Test Plan
document and agree with the approach it presents. Any changes to this Requirements
Definition will be coordinated with and approved by the undersigned or their designated
representatives.
[List the individuals whose signatures are required. Examples of such individuals are
Business Steward, Technical Steward, and Project Manager. Add additional signature
lines as necessary.]
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Page 7 of 9
[Insert appropriate disclaimer(s)]
Appendix A: References
[Insert the name, version number, description, and physical location of any documents
referenced in this document. Add rows to the table as necessary.]
The following table summarizes the documents referenced in this document.
Document Description Location
Name and
Version
<Document [Provide description of the <URL or Network path where
Name and document] document is located>
Version Number>
Page 8 of 9
[Insert appropriate disclaimer(s)]
Appendix B: Key Terms
[Insert terms and definitions used in this document. Add rows to the table as necessary.]
The following table provides definitions for terms relevant to this document.
Term Definition
[Insert Term] [Provide definition of the term used in this document.]
Page 9 of 9