Location: Project: Date:: Bus Directly Connected Load Total Bus Load

The document summarizes the loading and losses of key components in an electrical distribution system. It shows that Cable1 is overloaded at 122% capacity and identifies two other branches with loads exceeding their capabilities. Total losses were calculated to be 1.8 kW and 8.6 kVAR. Voltage drop on the system was highest at 2.24% on the T2 transformer branch.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views5 pages

Location: Project: Date:: Bus Directly Connected Load Total Bus Load

The document summarizes the loading and losses of key components in an electrical distribution system. It shows that Cable1 is overloaded at 122% capacity and identifies two other branches with loads exceeding their capabilities. Total losses were calculated to be 1.8 kW and 8.6 kVAR. Voltage drop on the system was highest at 2.24% on the T2 transformer branch.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 5

ETAP

Project: Page: 1
12.6.0H
Location: Date: 10-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SLD_Aang_tugas_1 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 20.000 0 0 0 0 0 0 0 0 0.425 75.3 12.3


Bus2 6.600 0 0 0 0 0 0 0 0 0.423 75.5 37.2
Bus3 6.600 0.166 0.072 0 0 0 0 0 0 0.423 75.5 37.2
Bus4 0.400 0.152 0.067 0 0.133 0 0 0 0 0.251 60.8 372.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 10-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SLD_Aang_tugas_1 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
(Amp) Amp (MVA)
ID Type % MVA % MVA %

* Cable1 Cable 30.47 37.17 122.00

T1 Transformer 5.000 0.425 8.5 0.423 8.5

T2 Transformer 0.500 0.257 51.3 0.251 50.2

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 10-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SLD_Aang_tugas_1 Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 0.320 0.280 -0.320 -0.277 0.2 2.3 100.0 99.6 0.40

Cable1 0.320 0.277 -0.319 -0.277 0.2 0.0 99.6 99.6 0.05

T2 0.154 0.205 -0.153 -0.199 1.3 6.2 99.6 97.3 2.24

1.8 8.6
ETAP
Project: Page: 4
12.6.0H
Location: Date: 10-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SLD_Aang_tugas_1 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Cable1 Cable Overload 30.468 Amp 37.172 122.0 3-Phase

CB6 LV CB Overload 150.000 Amp 372.069 248.0 3-Phase

CB7 LV CB Overload 150.000 Amp 246.736 164.5 3-Phase

CB8 LV CB Overload 150.000 Amp 196.655 131.1 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus4 Bus Under Voltage 0.400 kV 0.389 97.3 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 10-08-2018
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SLD_Aang_tugas_1 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 0.320 0.280 0.425 75.29 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 0.320 0.280 0.425 75.29 Lagging

Total Motor Load: 0.318 0.138 0.347 91.69 Lagging

Total Static Load: 0.000 0.133 0.133 0.07 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.002 0.009

System Mismatch: 0.000 0.000

Number of Iterations: 2