ITR Overview Sample

This document appears to be a sign-off sheet for the completion of various processes in a piping system. It contains signatures from representatives of the contractor and client to verify the completion of 14 processes labeled P01 through P15 across three identified stages - piping ITR overview, precommissioning, and commissioning. The sign-off sheet is for a specific contract and work order related to piping.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

ITR Overview Sample

This document appears to be a sign-off sheet for the completion of various processes in a piping system. It contains signatures from representatives of the contractor and client to verify the completion of 14 processes labeled P01 through P15 across three identified stages - piping ITR overview, precommissioning, and commissioning. The sign-off sheet is for a specific contract and work order related to piping.

Uploaded by

Momo Itachi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Name

Signature
Designation

Date Signed
SYSTEM

100 - PROCESS

SIGN OFF
SUB SYSTEM

110 - Crude Oil Receiving

112
111
SYSTEM
SUB-SUB
DESCRIPTION

CONTRACTOR Representative
X
X

P01-A Pipe Work Completion

P02-A Pre-Test
N/A
N/A

P03-A Flushing
N/A
N/A

P04-A Pressure Test


N/A
N/A

Contractor Representative
Contract title:

P05-A Blowing/Drying
CONTRACT NO:

N/A
N/A
WORK ORDER NO :
PIPING ITR OVERVIEW

P06-A Flange Allignment


N/A
N/A

X
X

P07-A Bolt Tensioning/Torqing

P08-A Chemical Cleaning


CONSTRUCTION ITR (A)

P09-A Re-instatement Work


N/A
N/A

P-10-A Service Test

P11-A Painting / Coating / Marking


N/A
N/A

Client PMT Representative

P12-A Pipe Insulation

P13-A Critical Valve Leak Test

P04-B Reinstatement Leak Test


N/A
N/A

P06-B Flanges Management


N/A
N/A

P10-B Service Test

P14-B Witness Joint


PRECOMMISSIONING (B)

P15-B Lube Oil Flushing

P04-C Sytem Commissioning Test


N/A
N/A

Client Operation Representative

P15-C Nitrogrn Purging


N/A
N/A
COMMISSIOINING (C)
REV.0