Itil Change Management A Beginners Guide

Itil Change Management a Beginners Guide

Uploaded by

desi1992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
635 views

Itil Change Management A Beginners Guide

Itil Change Management a Beginners Guide

Uploaded by

desi1992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

ITIL Change Management

- A Beginner's Guide
Understand the basics of Change Management

www.freshservice.com
Table of content

ITIL Change Management 1

Change Management Process flow 3

Types of Changes 6

Use cases for ITIL Change Management 8

Integration with other modules 11

The Right Approach 13


ITIL Change Management
Digital transformation and initiatives lead to new projects within organizations. Seamless business operation is a gift
for businesses to improve productivity. Businesses undergo transitions on a regular basis that differ in risk and
impact. It is vital to streamline this process to keep these two factors in control. Change management is significant to
deploy new changes without any disruption or downtime. ITIL change management follows a standard operating
procedure to eliminate any unintended interruptions and capture necessary details about a change before it is
implemented such as reason for change, planning and approval.

ITIL Change management is essential for businesses to implement changes smoothly and maintain current working
state. Change management works closely with other ITIL modules such as Incident management, problem
management, configuration management to manage infrastructure and Configuration Items, CIs that are affected or
going through the change. This delivers better context and consistency so that change team can be proactive in
avoiding any potential failure. Implementing a change is a costly affair thus change management ensures everything
is in control and even if something goes wrong, damage is minimal.

Objectives
Mitigate risk and impact

Retention of current working state

Communication and approval management

Effective change planning using available resources

Reduction in number of incidents due to change

Shifting office space, deploying a fix to production server, windows patch, replacing
cloud service provider, updating OS.

2
Change Management
Process flow
ITIL Change management follows a set of processes and every detail about change is recorded for future tracking.
Following the process ensures that there are no loopholes and change is validated to ensure successful deployment.
It is helpful for other service desk teams such as release management, configuration management to understand the
type and complexity of change. Change manager is responsible for successful planning & evaluation. Release
management team takes care of the actual implementation of change. Following is the change management process
flow

Request for Change


The first step is to request for a change with valid reasons. Change requests are created due to one of the following
reasons

Incident causes a new change

Change is created as a result of a known problem

End user requests a new change

Change manager creates a change as result of an ongoing maintenance

Request for Change proposal contains following information along with necessary details

Reason for change


lists the reason on why change has to be created,affected parties and desired outcome.

Impact & Risk assessment


Impact and risk are calculated and documented including configuration items, CIs.

Cost benefit analysis


Estimated resource utilization and cost incurred along with potential benefits are documented

Implementation planning
Steps for implementing change that includes project members, timelines and methodology.

Reason for change

Implementation
planning

Cost benefit
analysis

Impact & Risk


assessment4

4
Change Evaluation and planning
Change assessment committee evaluates submitted RFC and suggests necessary changes that would be taken care
by Change initiator. This is followed by Change planning that follows a standard procedure and it includes activities
such as

Prioritizing a change After analyzing the reasons and RFC, prioritize change request and determine change
type depending on the risk/impact

Scheduling a change Depending on the priority, scheduling is fixed. If it’s a low priority change, it could be
pushed to the next deployment window.

Decide on the planned start date and end date

Ensure there is no clash with other major activities that are scheduled

Roll out plan details about implementation steps and approach

Identifying stakeholders Identifies the project members who are responsible for carrying out the
implementation and members who need to approve

Change approvals
Communicating the change and its details to relevant stakeholders and getting on time approval is key to success.
Automate the approval process to reduce manual effort. Approval process flow is decided depending on the type of
change. For example, major change requires approval from CAB as well as management whereas standard change
does not require any CAB approval as they are pre-approved. Change request is approved only if all the CAB
members approve it. Upon rejection, reassessment review is done and submitted again for CAB approval.

Change implementation & review


Once the change is approved, implementation is carried out with the help of release management team. Release
team follows their own processes that include planning and testing. Change review happens once implementation
is completed to determine whether it’s a success or failure. Review of completed changes help in revisiting and
modifying existing change management process if necessary.

5
Types of Changes
Types of changes

Major
Major changes are high impact and high risk items that may alter production systems. This requires CAB approval
along with business approval. This has a huge impact on ongoing business operations and also has financial
implications. Therefore, RFC contains a detailed proposal on cost-benefit, risk-impact analysis.
Examples - migration from one datacenter to another; replacing an existing enterprise solution(ERP).

Standard change
Standard changes are generally pre-approved changes that have low impact and low risk. These changes occur
periodically and follow a standard procedure. They do not follow the conventional process flow and it can be saved
as a standard change template for reuse. Every time, CAB approval is not required as these changes are evaluated
and approved once initially.
Examples - OS upgrade, deploying patch, setting up an user account etc.

Minor
Minor changes are generally normal changes that do not have a major impact and are less risky to execute. These are
non-trivial changes that do not happen frequently but this undergoes every stage of change lifecycle including CAB
approval. It is important to document related information so that this can be converted to a standard change in
future.
Examples - application performance improvement, website changes.

Emergency
Emergency changes are unexpected interruptions that need to be fixed as quick as possible. This does not follow the
usual norm whereas retrospective RFC has to be submitted post implementation and approvals can be managed
through Emergency CAB (ECAB). These changes can be reviewed later to avoid potential infrastructure risks in future
and detailed documentation is done post change execution.
Examples - Fix for security breach, server outage.

7
Use cases for ITIL
Change Management
Use cases for ITIL change management
There are many practical use cases for ITIL change management that are handled by IT and DevOps team on a day to
day basis. Let us look at some of the common use cases.

CASE I - Business Continuity Plan & Disaster Recovery


Application of ITIL change management in BCP/DR is vital as this is one of the critical operations to ensure business
continuity. This is classified as a major change due to its high impact/high risk on live environments. This involves
changes to production servers and therefore having an effective change management is necessary. The objectives of
change management in BCP/DR include

Minimal/no disruption to the current ecosystem

Effective resource utilization

Having an approved backout plan and related backout activities

Identifying configuration items that may be potentially impacted due to BCP/DR

Proper documentation of all relevant changes

Communication of changes to all stakeholders

Monitoring service availability & metrics such as recovery time taken (RTO,RPO)

BCP/DR has a predefined template to capture necessary details.

Stage BCP/DR

Request for change Customer reports an issue and requests for a change that may be due
to BCP/DR change implemented. Change usually includes
infrastructure changes.

Change planning & evaluation Change manager & team reviews the RFC; analyzes reason, impact,
cost associated and plan for the change in a scheduled time frame.
BCP/DR could be applicable to multiple locations. Change team
should identify specific location where BCP/DR will be executed.

Change approvals Get the approvals from BCP team and other stakeholders;
Communicate the new changes to all customers, vendors; update all
relevant collaterals including BCP template

Change implementation Implementation is carried out by release team and change team
& review performs periodic audit.

9
CASE II - Security patch
Fixing any security threat or breach is a typical example of an emergency change. This is generally high risk, high
impact change with time constraints. Live environments and production systems are vulnerable when you execute
emergency changes. Though the fix has to be really quick, standard testing and approval by ECAB is important to
avoid any unintended issues. Since emergency changes need quick resolutions, this cannot wait too long to follow a
typical change management process. Following is the usual process for emergency changes

Change requester submits an emergency change ticket

Change team evaluates the risk/impact

Quick change planning is done using the template including roll out and back out plan activities

Approval is triggered to ECAB members (Emergency CAB members)

Once it is approved, change is implemented

Detailed assessment happens post change implementation

Retrospective RFC is submitted post implementation for documentation and audit purpose

Periodic audit review is done to avoid any similar issue in future

CASE III - Cloud change management


Businesses are moving towards cloud and agile. Change management in cloud is a typical example of standard
change which follows a pre-approved procedure. Release cycles have shortened leading to frequent feature releases
and enhancements. Deployment in cloud environment often requires smaller units of testing and due to this,
changes to production environment might happen often. Therefore, following a standard change management
process helps in controlling the risk and impact.

Create a change request in order to make any changes to production infra.


If there are any corresponding tickets or problems, associate them to this change ticket.

Understand the contract with cloud service provider regarding uptime, service availability and security

Prepare a standard change template for new releases

Plan your releases - In a multi-tenant architecture, releases need to be planned without any disturbance to

existing configuration settings

Plan for backout activities - To retain current ecosystem, plan for backout activities and keep them ready

Use sandbox environment for testing - Sandbox testing ensures expected and actual behavior of new releases

match with each other without affecting live environment. It reduces risk of changes to production systems.

Periodic review ensures there is no unexpected interruption during standard change execution

10
Integration with
other modules
Integrations with other modules
Change management is seamlessly integrated with other ITIL modules such as incident management, problem
management, release management and CMDB. Information flows across all these modules to maintain consistency.

Change management & CMDB


Configuration Management Database,CMDB contains information about assets and their configuration
items. Change implementation might have an impact on configuration items. Therefore, it is essential to
associate the right CIs that might be impacted due to change or caused the change to occur and update
this information within CMDB. CMDB maintains asset relationships and this information helps in impact
analysis of a change. If a particular asset has multiple dependencies or relationships with other assets,
then the impact is high and respective change process is defined based on this analysis.

Change & release management


Change management ensures that planned change is under control whereas release management takes
care of the actual implementation of planned changes. It is vital to clearly differentiate the roles &
responsibilities of change and release management. Successful change leads to new release and change
management coordinates with release for build, test and implementation plan. Change review happens
post deployment of releases.

Change & Incident management


Major incident may give rise to a new change or incidents may be created due to change execution. If root
cause of the incident is already known, then it is linked to a change record. If the cause is unknown and
not apparent, then incident is linked to a problem to perform root cause analysis. Problem management
finds out a workaround if the issue cannot be solved permanently and this is followed by change
management. The goal of incident management is to restore services quickly and change management
helps in fixing the issue permanently by rolling out new changes.

CMDB

Change
management

Incident Release
management management

12
The Right Approach
Change management Implementation Checklist

Define change templates to pre-fill standard changes thus saving time

Define workflows to execute set processes

Include stakeholders from all relevant teams in CAB committee

Communicate clear roles and responsibilities of every CAB member

Automate CAB approval process to eliminate manual work

Define success factors and metrics to measure

Integrate with other ITIL modules for consistent information flow

The right Approach


There is no one-size-fits-all approach for change management process. Businesses need to understand their
structure, objective, complexity and define change process flows accordingly. However, change management is
essential irrespective of the size of business in order to minimize disruptions while undergoing a change and track
every change request with proper details.

14
About Freshservice
Freshservice is a cloud-based IT service desk and IT service management (ITSM) solution that is quick to setup and
easy to use and manage. Freshservice leverages ITIL best practices to enable IT organiations to focus on what’s most
important - exceptional service delivery and customers satisfaction. With its powerfully simple UI, Freshservice can
be easily configured to support your unique business requirements and integrated with other critical business and IT
systems. Are you trying to keep up with the current ITSM trends? Freshservice is on a constant mission to innovate
and deliver great experience.

Start your free trial now :


www.freshservice.com/signup

Visit www.freshservice.com for the lastest in the world of ITSM.


Author: Padmavathy Sankaran
Copyright Freshworks Inc. All Rights Reserved