(Project Title) : Earned Value Analysis Report

This earned value analysis report summarizes project progress for a 12 period project. The report includes planned value, earned value, and actual cost charts. However, as the project is just starting, all values are currently zero, as no work has been performed. Key performance metrics like cost and schedule variance and cost and schedule performance indexes cannot be calculated yet.

Uploaded by

Abdul Azeez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views

(Project Title) : Earned Value Analysis Report

This earned value analysis report summarizes project progress for a 12 period project. The report includes planned value, earned value, and actual cost charts. However, as the project is just starting, all values are currently zero, as no work has been performed. Key performance metrics like cost and schedule variance and cost and schedule performance indexes cannot be calculated yet.

Uploaded by

Abdul Azeez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

[Project Title]

Earned Value Analysis Report

Prepared By: [Manager's Name]


Date: [Report Date] 1
[42]
0.9 Planned Value (PV)
For Period: Earned Value (EV)
0.8
0.7 Actual Cost (AC)
Summary:
[Use this space to write a brief summary or to record 0.6
specific observations or notes] 0.5
0.4
0.3
0.2
0.1 Period
0
1 2 3 4 5 6 7 8 9 10 11 12

Planned Value (PV) or Budgeted Cost of Work Scheduled (BCWS)


WBS Task Name TBC 1 2 3 4 5 6 7 8 9 10 11 12
1.1 Task 1 0
1.2 Task 2 0
1.3 Task 3 0
1.4 Task 4 0
1.5 Task 5 0
1.6 Task 6 0
0
0
0
0
0
0
Insert new rows above this one
Total Budgeted Cost 0 0 0 0 0 0 0 0 0 0 0 0 0
Cumulative Planned Value (PV) 0 0 0 0 0 0 0 0 0 0 0 0

Actual Cost and Earned Value


Cumulative Actual Cost (AC) 0 0 0 0 0 0 0 0 0 0 0 0
Cumulative Earned Value (EV) 0 0 0 0 0 0 0 0 0 0 0 0

Project Performance Metrics


Cost Variance (CV = EV - AC) 0 0 0 0 0 0 0 0 0 0 0 0
Schedule Variance (SV = EV - PV) 0 0 0 0 0 0 0 0 0 0 0 0
Cost Performance Index (CPI = EV/AC) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Schedule Performance Index (SPI = EV/PV) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Estimated Cost at Completion (EAC) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
This worksheet is used to help calculate the Earned Value (EV) or Budgeted Cost of Work Performed (BCWP).
Use this worksheet to help calculate the Actual Cost (AC) of Work Performed (ACWP) by entering the costs incurred each period.