1 SAP Migration: 1.1 Solution Overview
1 SAP Migration: 1.1 Solution Overview
The objective of this project is to perform heterogeneous migration from Current IBM Environment to
HPE. Existing is a Multi-client setup and migration of only Customer related data/client to target system is
part of this scope.
HPE will create a project plan and project schedule, and determine the appropriate mix of technical and
business resources necessary to implement the project.
550 Customer No
Customer Production
PRD 500 Yes
Client
Customer Production
550 No
Client
SOLMAN 505 Fresh Installation
The project will be initiated with detailed planning for the implementation infrastructure and transition to new
servers. The following items will need to be planned:
Discussion of transition procedure with Customer and alignment of general conditions for the migration
Project milestones and a schedule of activities
Review SAP landscape design and dependences such as interfaces, bolt-on applications, and
management/operations tools
Detail SAP migration plans including sequencing of SAP instance moves
Create acceptance criteria to be used in the development of the test plan
Identify any potential issues and or risks which could cause project delays and develop mitigation
responses
Customer Responsibilities –
This migration serves as the first of the migration after POC process and delivers a migrated DEV database.
This service includes transitioning the database, rebuilding the transport route. It will cover standard SAP
pre and post migration activities like consistency check of the source database, transport route check.
Customer Responsibilities –
The Customer will provide for the reconnection of interfaces and the implementation of any non-SAP
software on the servers, including monitoring tools and batch job clients.
The Customer will make adjustments to the batch jobs, scripts, and printer configurations – HPE SAP
Consultant to assist on need basis.
Functional and end user test plans will be developed, documented and carried out by Customer.
User Acceptance Test plan development: i.e. Testing strategy; Scenario planning, development, and
preparations; Testing resource management
SAP customizations and interfaces migrations
Technical or Functional Upgrades
Database consolidations
Unicode conversions
SAPGUI configuration changes
Change Management process