Instructions On Filling Out The Application For Project Grants
Instructions On Filling Out The Application For Project Grants
GRANTS
This application form has a set format. The applicant should make sure that the following technical
requirements are fulfilled:
Application is filled out with computer and has maximum 19 pages;
Application is prepared in English language;
Do not intervene in the format and the content of application form and do not change the font size
(11);
Each question and section below is addressed accordingly;
All documents specified in the section Mandatory Documents should be submitted along with the
application form;
The completed application should be submitted electronically in “.pdf” and “word”. NGOs from
Kosovo should submit the documents at [email protected] whereas NGOs from
Albania at [email protected] with the subject titled “Application for project grant–
full name of applicant and acronym”.
Attention! Information should be accurate. Any false information may lead to rejection of your application.
After filling out the application, please remove this instruction sheet.
Date of DD/MM/YY
application
ORGANIZATION IDENTITY (maximum 2 pages. Write N/A for questions that are not applicable)
Applying lead and partner
organization when Full name of the organization and abbreviation in brackets
applicable:
Legal status of the lead and
partner organization when Foundation or association (or Centre, for Albania only)
applicable:
*Year of establishment:
Web-site: www.
Budget in the last 3 years: 2017: ... EUR 2016: ... EUR 2015: ...EUR
Key donors: List the three key supporting donors and total budget
Administrative and financial List internal procedures regulating the administrative and financial
management system: management and indicate the applied financial management system
* Information on this and the following criteria applicable for the lead organization
PROJECT INFORMATION (maximum 3 pages. Write N/A for questions that are not applicable)
Project title “”
1. Non-discrimination and gender equality
2. Independent media
3. Minorities and marginalized groups
Thematic priority area 4. Environment protection
5. Anti-corruption
Underline the thematic area to which the application fits. Note that
maximum one thematic area can be selected.
Implementation period Period: DD/MM/YY - DD/MM/YY and no. of months
If the proposed project is part of a larger programme, clearly explain how it fits or is coordinated
with that programme or any other planned project (a and b are applicable for interventions
implemented by your or other organizations/entities).
c. Clear, measurable and achievable project results that ensure accomplishment of the proposed project
objective;
d. List and describe the proposed activities including information on timeframe, implementation method
and interconnections. In case of partnership, elaborate the role of the partner;
e. Present the principal beneficiaries/target groups and final project beneficiaries1 including the
description of their benefit from the proposed intervention. Whenever possible, data on the
distribution of beneficiaries by gender and under-represented group should be provided.
f. Project stakeholders2 and explanation of their role in project implementation.
g. Brief presentation of the monitoring plan and proposed indicators to measure the implementation
quality and timeframe.
h. Potential risks that might have a negative impact on project implementation along with the probability
of occurrence (high, medium or low) and proposed mitigation measures.
i. Proposed methodology for visibility and outreach.
j. Possibility for replication and expansion of activities.
Response to every question is mandatory. Answer the questions in the order they appear.
Please do not delete the questions.
1 All those involved in activities funded by the project and benefiting from its implementation may be defined as principal
beneficiaries/target groups. On the other hand, final beneficiaries may be qualified as those individuals who are affected by project
results, even though they are not actively involved in the project.
2
Stakeholders are all parties who in one way or another have a stake in the field or issue tackled by the project. The list of stakeholders
usually includes central and /or local institutions, political parties, media, other NGOs, international community and donors, private
business sector, religious institutions, etc. From the diversity of this list it is to be understood that not all stakeholders share same
concerns on an issue, and consequently have different opinions or priorities.
Organizational capacity building (maximum 1/2 page)
When financial support for organizational capacity building is requested, information provided should explain
the grounds and type of the requested support. In addition, this section should contain a clear and concise
plan justifing the request along with the benefits that this support brings to the organization.
Whenever applicable, certificate of registration (first document for both Albania and Kosovo) of the partner
organization to be submitted as well.
Checklist
BEFORE SENDING YOUR PROPOSAL, PLEASE CHECK THAT EACH OF THE FOLLOWING Tick the items
CRITERIA HAVE BEEN MET IN FULL AND TICK THEM OFF below
Yes No
5. Application is in English
I, the Executive Director of the NGO (name of the NGO) declare that the information provided in this
application is true and correct and I am conscious that any false information may lead to rejection of the
application.
Name
Signature
Date
Declaration from Partner Organisation (if applicable)
The Partner Organisation <xxxxxxxxxxxxxxxxxxxxxxx> authorises the Lead Applicant < XXXXXXXXXXXXXXXXX >
to submit on its behalf the present application form for applicant, as well as, to be represented by the Lead
Applicant in all matters concerning this grant application.
I have read and approved the contents of the proposal submitted. I undertake to comply with the principles
of good partnership practice.
Name:
Organisation:
Position:
Signature: