0% found this document useful (0 votes)
148 views

Control Room Layout - Latest Version

The document provides a legend for the labeling of various programmable logic controllers (PLCs), operator workstations, engineer workstations, servers, CCTV displays, printers, and fire alarm panels located across an offsite unit, refinery unit, and fractionation unit. PLC 01 controls the boiler, PLC 02 controls the water treatment plant, and PLC 03 controls the waste water treatment plant. PLC 04 controls the cooling tower, tank farm, pumps and compressed air. Various operator and engineer workstations are located at the offsite, refinery and fractionation units to monitor and control the systems.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
148 views

Control Room Layout - Latest Version

The document provides a legend for the labeling of various programmable logic controllers (PLCs), operator workstations, engineer workstations, servers, CCTV displays, printers, and fire alarm panels located across an offsite unit, refinery unit, and fractionation unit. PLC 01 controls the boiler, PLC 02 controls the water treatment plant, and PLC 03 controls the waste water treatment plant. PLC 04 controls the cooling tower, tank farm, pumps and compressed air. Various operator and engineer workstations are located at the offsite, refinery and fractionation units to monitor and control the systems.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEGEND

PLC 01 = PLC FOR BOILER OW 01 = OPERATOR WORKSTATION ( OFFSITE UNIT )


PLC 02 = PLC FOR WTP EW 01 = ENGINEER WORKSTATION ( OFFISTE UNIT )
PLC 03 = PLC FOR WWTP SW 01 = SERVER WORKSTATION ( OFFISITE UNIT )
PLC 04 = PLC FOR COOLING TOWER OW 02 = OPERATOR WORKSTATION ( REFINERY UNIT )
TANK FARM, PUMPS, & EW 02 = ENGINEER WORKSTATION ( REFINERY UNIT )
COMPRESSED AIR OW 03 = OPERATOR WORKSTATION ( FRACTIONATION UNIT)
EW 03 = ENGINEER WORKSTATION ( FRACTIONATION UNIT)
CC 01 = CCTV DISPLAY 01
CC 02 = CCTV DISPLAY 02
PR 01 = COLOR PRINTER A3
FA = FIRE ALARM PANEL

FA

CC02
CC01
EW02 EW02 EW01 EW01 OW01 EW03 OW03

PR01

PLC+MCC Panel of Refinery Unit and Fractionation Unit


PLC PLC PLC PLC
04 03 02 01

REV. DATE DESCRIPTION DESIGN CHECK REVIEW APPR DRAWING TITLE :

SCALE DATE JOB NO. :

DRAWN BY UNITS :

CHECKED BY AREA CODE SIZE

APPROVED BY

DRAWING NO. : SHEET REVISION

1 OF 1

You might also like