44746-Thornlands Community Park Stages

The document outlines a multi-stage development plan for Thornlands Community Park, with Stage 1a including a plaza area, carpark, public amenities, and design plans for future stages. Stage 1b will add footpaths, earthworks, planting, and a picnic shelter. Future Stage 2a could involve a fenced playground with picnic facilities and landscaping, while Stage 2b may include a sculptural play area, fitness equipment, and a performance shelter, though funding has not been allocated for these future stages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

44746-Thornlands Community Park Stages

The document outlines a multi-stage development plan for Thornlands Community Park, with Stage 1a including a plaza area, carpark, public amenities, and design plans for future stages. Stage 1b will add footpaths, earthworks, planting, and a picnic shelter. Future Stage 2a could involve a fenced playground with picnic facilities and landscaping, while Stage 2b may include a sculptural play area, fitness equipment, and a performance shelter, though funding has not been allocated for these future stages.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REDLAND CITY COUNCIL

Thornlands Community Park


STAGE 1a
• Plaza area
• Carpark (including lighting)
• Public Amenities (including water, sewer,
power connection)
• Detailed design of Stage 2a and 2b

STAGE 1b
• Footpaths
• Earthworks for Multi Use Open Space
• Planting and seating
• Picnic Shelter and BBQ

STAGE 2a (Future)

• Fully fenced all abilities playground


• Picnic facilities within fenced area
Multi Use Open • Landscaping
Space

STAGE 2b (Future)
• Sculptural Play area within playground
• Fitness Equipment
• Performance Shelter (including power)
• Youth Area - including half court and parkour
elements

NOTE: Council has no allocated budget or timeframes


for future stages of this project. This document is for
discussion purposes only.

0 10 20 30m
Scale: 1:1000 @ A3

Rev a 1