AT 10 Zaxis 870
AT 10 Zaxis 870
Motion Average - Duration (s) Sum - Duration (s) Average - Duration (s)
Bantu HD Slip 428.657 428.657 428.657
Collect material 23.3322380952 489.977 23.3322380952
Digging 11.3532523077 3689.807 11.3532523077
Dumping 5.0566830769 1643.422 5.0566830769
Operator Solat 727.624 727.624 727.624
Pindah Front 202.315 202.315 202.315
Spotting 15.6805217391 721.304 15.6805217391
Swing isi 4.9794184615 1618.311 4.9794184615
Swing kosong 5.1324246154 1668.038 5.1324246154
Wait hauler 115.7291 2314.582 115.7291
Total Result 9.7151345324 13504.037 9.7151345324
Study Motion Started CompletedDuration Duration (s) Unit # Unit Duration (ms)Bucket
Digger AT 1Collect mat 21:03.6 21:16.3 12747 12.747 0 34765
Digger AT 1Digging 21:16.3 21:34.8 18483 18.483 0 34765 7 AR 45
Digger AT 1Swing isi 21:34.9 21:38.4 3535 3.535 0 34765
Digger AT 1Spotting 21:38.4 21:51.0 12569 12.569 1 323796
Digger AT 1Dumping 21:51.0 21:56.6 5534 5.534 1 323796
Digger AT 1Swing koso 21:56.6 21:59.4 2746 2.746 1 323796
Digger AT 1Digging 21:59.4 22:13.4 13980 13.98 1 323796
Digger AT 1Swing isi 22:13.5 22:17.0 3490 3.49 1 323796
Digger AT 1Dumping 22:17.0 22:20.8 3843 3.843 1 323796
Digger AT 1Swing koso 22:20.9 22:25.0 4141 4.141 1 323796
Digger AT 1Digging 22:25.0 22:34.7 9622 9.622 1 323796
Digger AT 1Swing isi 22:34.7 22:39.0 4320 4.32 1 323796
Digger AT 1Dumping 22:39.1 22:44.3 5246 5.246 1 323796
Digger AT 1Swing koso 22:44.4 22:46.9 2504 2.504 1 323796
Digger AT 1Digging 22:46.9 23:01.8 14843 14.843 1 323796
Digger AT 1Swing isi 23:01.9 23:04.6 2749 2.749 1 323796
Digger AT 1Dumping 23:04.6 23:09.3 4709 4.709 1 323796
Digger AT 1Swing koso 23:09.4 23:14.3 4948 4.948 1 323796
Digger AT 1Digging 23:14.4 23:21.0 6631 6.631 1 323796
Digger AT 1Swing isi 23:21.0 23:23.4 2408 2.408 1 323796
Digger AT 1Dumping 23:23.5 23:27.3 3814 3.814 1 323796
Digger AT 1Swing koso 23:27.3 23:30.7 3416 3.416 1 323796
Digger AT 1Digging 23:30.7 23:41.6 10822 10.822 1 323796
Digger AT 1Swing isi 23:41.6 23:44.7 3162 3.162 1 323796
Digger AT 1Dumping 23:44.8 23:50.2 5487 5.487 1 323796
Digger AT 1Swing koso 23:50.3 23:54.7 4451 4.451 1 323796
Digger AT 1Digging 23:54.8 24:05.8 11022 11.022 1 323796
Digger AT 1Swing isi 24:05.8 24:09.7 3905 3.905 1 323796
Digger AT 1Dumping 24:09.8 24:15.2 5394 5.394 1 323796
Digger AT 1Swing koso 24:15.3 24:20.1 4860 4.86 1 323796
Digger AT 1Wait haule 24:20.2 26:51.1 150923 150.923 1 323796
Digger AT 1Digging 26:51.2 26:58.9 7777 7.777 1 323796 7 AR 47
Digger AT 1Swing isi 26:59.0 27:03.4 4480 4.48 1 323796
Digger AT 1Spotting 27:03.5 27:07.7 4159 4.159 2 415786
Digger AT 1Dumping 27:07.8 27:11.1 3392 3.392 2 415786
Digger AT 1Swing koso 27:11.2 27:14.2 3001 3.001 2 415786
Digger AT 1Digging 27:14.2 27:19.4 5164 5.164 2 415786
Digger AT 1Swing isi 27:19.4 27:24.6 5211 5.211 2 415786
Digger AT 1Dumping 27:24.6 27:29.3 4671 4.671 2 415786
Digger AT 1Swing koso 27:29.3 27:35.0 5613 5.613 2 415786
Digger AT 1Digging 27:35.0 27:49.7 14629 14.629 2 415786
Digger AT 1Swing isi 27:49.7 27:56.4 6693 6.693 2 415786
Digger AT 1Dumping 27:56.5 28:02.7 6228 6.228 2 415786
Digger AT 1Swing koso 28:02.7 28:09.3 6541 6.541 2 415786
Digger AT 1Digging 28:09.3 28:23.0 13708 13.708 2 415786
Digger AT 1Swing isi 28:23.0 28:28.5 5465 5.465 2 415786
Digger AT 1Dumping 28:28.5 28:34.9 6405 6.405 2 415786
Digger AT 1Swing koso 28:34.9 28:41.3 6402 6.402 2 415786
Digger AT 1Digging 28:41.3 28:55.4 14033 14.033 2 415786
Digger AT 1Swing isi 28:55.4 29:01.0 5527 5.527 2 415786
Digger AT 1Dumping 29:01.1 29:07.3 6237 6.237 2 415786
Digger AT 1Swing koso 29:07.3 29:13.8 6527 6.527 2 415786
Digger AT 1Digging 29:13.9 29:27.9 13992 13.992 2 415786
Digger AT 1Swing isi 29:27.9 29:32.8 4904 4.904 2 415786
Digger AT 1Dumping 29:32.9 29:38.7 5756 5.756 2 415786
Digger AT 1Swing koso 29:38.9 29:45.6 6634 6.634 2 415786
Digger AT 1Digging 29:45.8 30:06.3 20512 20.512 2 415786
Digger AT 1Swing isi 30:06.5 30:10.2 3717 3.717 2 415786
Digger AT 1Dumping 30:10.2 30:14.8 4547 4.547 2 415786
Digger AT 1Swing koso 30:14.8 30:19.7 4910 4.91 2 415786
Digger AT 1Wait haule 30:19.8 33:35.3 195435 195.435 2 415786
Digger AT 1Collect mat 33:46.4 33:48.9 13499 13.499 2 415786
Digger AT 1Digging 33:49.0 33:55.8 6865 6.865 2 415786 6 AR 44
Digger AT 1Swing isi 33:55.8 34:01.3 5409 5.409 2 415786
Digger AT 1Spotting 34:01.3 34:09.1 7812 7.812 3 179592
Digger AT 1Dumping 34:09.1 34:15.3 6171 6.171 3 179592
Digger AT 1Swing koso 34:15.3 34:19.7 4365 4.365 3 179592
Digger AT 1Digging 34:19.7 34:31.5 11722 11.722 3 179592
Digger AT 1Swing isi 34:31.5 34:37.7 6190 6.19 3 179592
Digger AT 1Dumping 34:37.7 34:42.7 5019 5.019 3 179592
Digger AT 1Swing koso 34:42.7 34:49.5 6736 6.736 3 179592
Digger AT 1Digging 34:49.5 35:01.5 12059 12.059 3 179592
Digger AT 1Swing isi 35:01.6 35:06.8 5185 5.185 3 179592
Digger AT 1Dumping 35:06.8 35:11.4 4614 4.614 3 179592
Digger AT 1Swing koso 35:11.5 35:16.6 5119 5.119 3 179592
Digger AT 1Digging 35:16.7 35:27.1 10384 10.384 3 179592
Digger AT 1Swing isi 35:27.1 35:32.9 5818 5.818 3 179592
Digger AT 1Dumping 35:33.0 35:38.5 5438 5.438 3 179592
Digger AT 1Swing koso 35:38.5 35:44.4 5964 5.964 3 179592
Digger AT 1Digging 35:44.5 35:53.9 9478 9.478 3 179592
Digger AT 1Swing isi 35:54.0 35:59.6 5626 5.626 3 179592
Digger AT 1Dumping 35:59.7 36:05.2 5576 5.576 3 179592
Digger AT 1Swing koso 36:05.2 36:11.0 5775 5.775 3 179592
Digger AT 1Digging 36:11.1 36:25.9 14753 14.753 3 179592
Digger AT 1Swing isi 36:25.9 36:32.4 6445 6.445 3 179592
Digger AT 1Dumping 36:32.4 36:36.9 4498 4.498 3 179592
Digger AT 1Swing koso 36:36.9 36:42.1 5163 5.163 3 179592
Digger AT 1Digging 36:42.2 36:55.5 13296 13.296 3 179592 8 AR 43
Digger AT 1Swing isi 36:55.5 37:01.9 6386 6.386 3 179592
Digger AT 1Spotting 37:01.9 37:55.4 53538 53.538 4 347878
Digger AT 1Dumping 37:55.5 37:59.2 3642 3.642 4 347878
Digger AT 1Swing koso 37:59.2 38:05.1 5842 5.842 4 347878
Digger AT 1Digging 38:05.2 38:14.7 9582 9.582 4 347878
Digger AT 1Swing isi 38:14.8 38:19.7 4901 4.901 4 347878
Digger AT 1Dumping 38:19.8 38:23.4 3583 3.583 4 347878
Digger AT 1Swing koso 38:23.4 38:30.2 6724 6.724 4 347878
Digger AT 1Digging 38:30.2 38:37.2 6969 6.969 4 347878
Digger AT 1Swing isi 38:37.2 38:42.6 5366 5.366 4 347878
Digger AT 1Dumping 38:42.6 38:46.2 3626 3.626 4 347878
Digger AT 1Swing koso 38:46.3 38:54.9 8599 8.599 4 347878
Digger AT 1Digging 38:54.9 39:00.7 5768 5.768 4 347878
Digger AT 1Swing isi 39:00.7 39:05.5 4794 4.794 4 347878
Digger AT 1Dumping 39:05.5 39:09.8 4291 4.291 4 347878
Digger AT 1Swing koso 39:09.9 39:16.7 6744 6.744 4 347878
Digger AT 1Digging 39:16.7 39:25.4 8750 8.75 4 347878
Digger AT 1Swing isi 39:25.5 39:30.9 5353 5.353 4 347878
Digger AT 1Dumping 39:30.9 39:34.6 3701 3.701 4 347878
Digger AT 1Swing koso 39:34.7 39:40.7 6078 6.078 4 347878
Digger AT 1Digging 39:40.8 39:51.4 10681 10.681 4 347878
Digger AT 1Swing isi 39:51.5 39:58.1 6614 6.614 4 347878
Digger AT 1Dumping 39:58.1 40:01.9 3771 3.771 4 347878
Digger AT 1Swing koso 40:01.9 40:07.7 5798 5.798 4 347878
Digger AT 1Digging 40:07.8 40:16.1 8329 8.329 4 347878
Digger AT 1Swing isi 40:16.1 40:22.1 5973 5.973 4 347878
Digger AT 1Dumping 40:22.1 40:25.7 3622 3.622 4 347878
Digger AT 1Swing koso 40:25.8 40:34.7 8920 8.92 4 347878
Digger AT 1Digging 40:34.7 40:47.2 12493 12.493 4 347878
Digger AT 1Swing isi 40:47.3 40:51.3 4013 4.013 4 347878
Digger AT 1Dumping 40:51.4 40:55.6 4199 4.199 4 347878
Digger AT 1Swing koso 40:55.6 41:08.6 12982 12.982 4 347878
Digger AT 1Collect mat 41:08.6 42:33.0 84315 84.315 4 347878
Digger AT 1Digging 42:33.0 42:44.3 11225 11.225 4 347878 7 AR 45
Digger AT 1Swing isi 42:44.3 42:51.4 7092 7.092 4 347878
Digger AT 1Spotting 42:51.4 43:01.3 9931 9.931 5 181682
Digger AT 1Dumping 43:01.4 43:05.5 4039 4.039 5 181682
Digger AT 1Swing koso 43:05.5 43:10.8 5306 5.306 5 181682
Digger AT 1Digging 43:10.9 43:28.7 17823 17.823 5 181682
Digger AT 1Swing isi 43:28.8 43:33.6 4785 4.785 5 181682
Digger AT 1Dumping 43:33.6 43:39.2 5617 5.617 5 181682
Digger AT 1Swing koso 43:39.2 43:43.7 4491 4.491 5 181682
Digger AT 1Digging 43:43.7 43:54.1 10404 10.404 5 181682
Digger AT 1Swing isi 43:54.1 43:57.9 3753 3.753 5 181682
Digger AT 1Dumping 43:58.0 44:02.5 4549 4.549 5 181682
Digger AT 1Swing koso 44:02.6 44:06.4 3784 3.784 5 181682
Digger AT 1Digging 44:06.5 44:15.6 9102 9.102 5 181682
Digger AT 1Swing isi 44:15.6 44:18.6 3008 3.008 5 181682
Digger AT 1Dumping 44:18.6 44:23.8 5187 5.187 5 181682
Digger AT 1Swing koso 44:23.9 44:26.4 2530 2.53 5 181682
Digger AT 1Digging 44:26.4 44:36.1 9664 9.664 5 181682
Digger AT 1Swing isi 44:36.1 44:39.5 3383 3.383 5 181682
Digger AT 1Dumping 44:39.5 44:42.4 2866 2.866 5 181682
Digger AT 1Swing koso 44:42.4 44:45.8 3442 3.442 5 181682
Digger AT 1Digging 44:45.8 44:56.2 10312 10.312 5 181682
Digger AT 1Swing isi 44:56.2 44:59.4 3142 3.142 5 181682
Digger AT 1Dumping 44:59.4 45:03.9 4488 4.488 5 181682
Digger AT 1Swing koso 45:04.0 45:08.0 4009 4.009 5 181682
Digger AT 1Digging 45:08.1 45:18.0 9904 9.904 5 181682
Digger AT 1Swing isi 45:18.0 45:21.1 3061 3.061 5 181682
Digger AT 1Dumping 45:21.1 45:26.1 4946 4.946 5 181682
Digger AT 1Swing koso 45:26.1 45:32.5 6435 6.435 5 181682
Digger AT 1Collect mat 45:32.5 45:40.4 7830 7.83 5 181682
Digger AT 1Digging 45:40.4 45:49.6 9189 9.189 5 181682 7 AR 46
Digger AT 1Swing isi 45:49.7 45:54.4 4702 4.702 5 181682
Digger AT 1Spotting 45:54.4 46:16.4 21981 21.981 6 462352
Digger AT 1Dumping 46:16.4 46:21.8 5390 5.39 6 462352
Digger AT 1Swing koso 46:21.8 46:35.5 13695 13.695 6 462352
Digger AT 1Collect mat 46:55.5 47:10.3 34746 34.746 6 462352
Digger AT 1Digging 47:10.4 47:18.7 8286 8.286 6 462352
Digger AT 1Swing isi 47:18.7 47:21.9 3126 3.126 6 462352
Digger AT 1Dumping 47:21.9 47:26.4 4418 4.418 6 462352
Digger AT 1Swing koso 47:26.4 47:29.4 2984 2.984 6 462352
Digger AT 1Digging 47:29.4 47:37.6 8193 8.193 6 462352
Digger AT 1Swing isi 47:37.6 47:42.0 4391 4.391 6 462352
Digger AT 1Dumping 47:42.0 47:47.5 5459 5.459 6 462352
Digger AT 1Swing koso 47:47.5 47:50.1 2654 2.654 6 462352
Digger AT 1Digging 47:50.1 48:01.4 11265 11.265 6 462352
Digger AT 1Swing isi 48:01.5 48:05.4 3896 3.896 6 462352
Digger AT 1Dumping 48:05.5 48:11.1 5628 5.628 6 462352
Digger AT 1Swing koso 48:11.2 48:13.8 2605 2.605 6 462352
Digger AT 1Digging 48:13.8 48:22.3 8508 8.508 6 462352
Digger AT 1Swing isi 48:22.3 48:26.2 3848 3.848 6 462352
Digger AT 1Dumping 48:26.2 48:31.5 5309 5.309 6 462352
Digger AT 1Swing koso 48:31.6 48:34.9 3337 3.337 6 462352
Digger AT 1Digging 48:35.0 48:42.1 7145 7.145 6 462352
Digger AT 1Swing isi 48:42.1 48:46.0 3852 3.852 6 462352
Digger AT 1Dumping 48:46.1 48:52.1 5989 5.989 6 462352
Digger AT 1Swing koso 48:52.1 48:56.3 4212 4.212 6 462352
Digger AT 1Digging 48:56.4 49:04.3 7917 7.917 6 462352
Digger AT 1Swing isi 49:04.3 49:07.3 2971 2.971 6 462352
Digger AT 1Dumping 49:07.3 49:12.8 5513 5.513 6 462352
Digger AT 1Swing koso 49:12.8 49:17.6 4824 4.824 6 462352
Digger AT 1Digging 49:17.7 49:29.9 12196 12.196 6 462352 7 AR 47
Digger AT 1Swing isi 49:30.0 49:41.1 11123 11.123 6 462352
Digger AT 1Dumping 49:41.1 49:46.1 4982 4.982 6 462352
Digger AT 1Swing koso 49:46.2 49:48.4 2231 2.231 6 462352
Digger AT 1Digging 49:48.4 50:03.7 15276 15.276 6 462352
Digger AT 1Swing isi 50:03.7 50:07.6 3898 3.898 6 462352
Digger AT 1Dumping 50:07.6 50:12.7 5075 5.075 6 462352
Digger AT 1Swing koso 50:12.8 50:17.0 4180 4.18 6 462352
Digger AT 1Digging 50:17.0 50:24.8 7800 7.8 6 462352
Digger AT 1Swing isi 50:24.9 50:29.9 5024 5.024 6 462352
Digger AT 1Dumping 50:30.0 50:34.1 4130 4.13 6 462352
Digger AT 1Swing koso 50:34.2 50:38.5 4331 4.331 6 462352
Digger AT 1Digging 50:38.6 50:46.5 7942 7.942 6 462352
Digger AT 1Swing isi 50:46.5 50:50.5 3908 3.908 6 462352
Digger AT 1Dumping 50:50.5 50:54.0 3522 3.522 6 462352
Digger AT 1Swing koso 50:54.1 50:57.2 3059 3.059 6 462352
Digger AT 1Digging 50:57.2 51:05.8 8575 8.575 6 462352
Digger AT 1Swing isi 51:05.8 51:10.2 4348 4.348 6 462352
Digger AT 1Dumping 51:10.2 51:14.7 4517 4.517 6 462352
Digger AT 1Swing koso 51:14.8 51:18.1 3379 3.379 6 462352
Digger AT 1Digging 51:18.2 51:29.8 11626 11.626 6 462352
Digger AT 1Swing isi 51:29.8 51:34.7 4910 4.91 6 462352
Digger AT 1Dumping 51:34.8 51:40.2 5356 5.356 6 462352
Digger AT 1Swing koso 51:40.2 51:43.8 3558 3.558 6 462352
Digger AT 1Digging 51:43.8 51:51.8 7955 7.955 6 462352
Digger AT 1Swing isi 51:51.8 51:56.3 4465 4.465 6 462352
Digger AT 1Dumping 51:56.3 52:03.3 6923 6.923 6 462352
Digger AT 1Swing koso 52:03.3 52:08.5 5180 5.18 6 462352
Digger AT 1Wait haule 52:08.5 53:29.5 80933 80.933 6 462352
Digger AT 1Digging 53:29.5 53:36.3 6767 6.767 6 462352 7 AR 44
Digger AT 1Swing isi 53:36.3 53:39.3 3041 3.041 6 462352
Digger AT 1Spotting 53:39.3 53:44.5 5113 5.113 7 293429
Digger AT 1Dumping 53:44.5 53:49.0 4510 4.51 7 293429
Digger AT 1Swing koso 53:49.1 53:53.1 3994 3.994 7 293429
Digger AT 1Digging 53:53.1 54:05.2 12146 12.146 7 293429
Digger AT 1Swing isi 54:05.2 54:10.9 5671 5.671 7 293429
Digger AT 1Dumping 54:10.9 54:17.0 6022 6.022 7 293429
Digger AT 1Swing koso 54:17.0 54:22.2 5214 5.214 7 293429
Digger AT 1Digging 54:22.3 54:28.9 6626 6.626 7 293429
Digger AT 1Swing isi 54:28.9 54:34.7 5785 5.785 7 293429
Digger AT 1Dumping 54:34.7 54:39.5 4742 4.742 7 293429
Digger AT 1Swing koso 54:39.5 54:43.0 3441 3.441 7 293429
Digger AT 1Digging 54:43.1 55:02.6 19500 19.5 7 293429
Digger AT 1Swing isi 55:02.6 55:06.2 3569 3.569 7 293429
Digger AT 1Dumping 55:06.2 55:11.1 4822 4.822 7 293429
Digger AT 1Swing koso 55:11.1 55:17.6 6418 6.418 7 293429
Digger AT 1Digging 55:17.6 55:23.5 5905 5.905 7 293429
Digger AT 1Swing isi 55:23.5 55:27.6 4028 4.028 7 293429
Digger AT 1Dumping 55:27.6 55:33.3 5680 5.68 7 293429
Digger AT 1Swing koso 55:33.4 55:37.7 4306 4.306 7 293429
Digger AT 1Digging 55:37.7 55:48.2 10435 10.435 7 293429
Digger AT 1Swing isi 55:48.3 55:51.0 2752 2.752 7 293429
Digger AT 1Dumping 55:51.0 55:56.8 5711 5.711 7 293429
Digger AT 1Swing koso 55:56.8 55:59.6 2766 2.766 7 293429
Digger AT 1Digging 55:59.6 56:12.8 13235 13.235 7 293429
Digger AT 1Swing isi 56:12.9 56:15.7 2805 2.805 7 293429
Digger AT 1Dumping 56:15.7 56:20.9 5176 5.176 7 293429
Digger AT 1Swing koso 56:21.0 56:25.6 4633 4.633 7 293429
Digger AT 1Wait haule 56:25.7 58:20.9 115238 115.238 7 293429
Digger AT 1Digging 58:20.9 58:30.2 9288 9.288 7 293429 6 AR 43
Digger AT 1Swing isi 58:30.3 58:34.2 3898 3.898 7 293429
Digger AT 1Spotting 58:34.2 59:02.4 28240 28.24 8 378861
Digger AT 1Dumping 59:02.5 59:08.5 6046 6.046 8 378861
Digger AT 1Swing koso 59:08.5 59:11.9 3348 3.348 8 378861
Digger AT 1Digging 59:11.9 59:26.1 14175 14.175 8 378861
Digger AT 1Swing isi 59:26.2 59:29.7 3562 3.562 8 378861
Digger AT 1Dumping 59:29.7 59:34.2 4430 4.43 8 378861
Digger AT 1Swing koso 59:34.2 59:38.3 4053 4.053 8 378861
Digger AT 1Digging 59:38.3 59:49.9 11623 11.623 8 378861
Digger AT 1Swing isi 59:49.9 59:54.4 4439 4.439 8 378861
Digger AT 1Dumping 59:54.4 59:58.1 3710 3.71 8 378861
Digger AT 1Swing koso 59:58.2 00:01.1 2917 2.917 8 378861
Digger AT 1Digging 00:01.1 00:13.2 12028 12.028 8 378861
Digger AT 1Swing isi 00:13.2 00:18.0 4772 4.772 8 378861
Digger AT 1Dumping 00:18.0 00:22.7 4725 4.725 8 378861
Digger AT 1Swing koso 00:22.8 00:27.1 4340 4.34 8 378861
Digger AT 1Digging 00:27.2 00:35.9 8635 8.635 8 378861
Digger AT 1Swing isi 00:35.9 00:42.5 6592 6.592 8 378861
Digger AT 1Dumping 00:42.5 00:49.5 7051 7.051 8 378861
Digger AT 1Swing koso 00:49.6 00:52.4 2830 2.83 8 378861
Digger AT 1Digging 00:52.4 01:06.4 13958 13.958 8 378861
Digger AT 1Swing isi 01:06.4 01:09.9 3539 3.539 8 378861
Digger AT 1Dumping 01:10.0 01:14.1 4168 4.168 8 378861
Digger AT 1Swing koso 01:14.1 01:17.3 3190 3.19 8 378861
Digger AT 1Wait haule 01:28.7 04:41.7 204339 204.339 8 378861
Digger AT 1Digging 04:41.8 04:50.0 8205 8.205 8 378861 7 AR 45
Digger AT 1Swing isi 04:50.0 04:53.9 3946 3.946 8 378861
Digger AT 1Spotting 04:53.9 05:03.2 9298 9.298 9 226806
Digger AT 1Dumping 05:03.3 05:08.7 5377 5.377 9 226806
Digger AT 1Swing koso 05:08.7 05:17.7 8998 8.998 9 226806
Digger AT 1Digging 05:17.7 05:32.2 14411 14.411 9 226806
Digger AT 1Swing isi 05:32.2 05:38.9 6649 6.649 9 226806
Digger AT 1Dumping 05:38.9 05:44.2 5314 5.314 9 226806
Digger AT 1Swing koso 05:44.2 05:51.1 6880 6.88 9 226806
Digger AT 1Digging 05:51.1 06:02.5 11313 11.313 9 226806
Digger AT 1Swing isi 06:02.5 06:09.0 6480 6.48 9 226806
Digger AT 1Dumping 06:09.0 06:14.4 5461 5.461 9 226806
Digger AT 1Swing koso 06:14.5 06:21.1 6684 6.684 9 226806
Digger AT 1Digging 06:21.2 06:31.8 10642 10.642 9 226806
Digger AT 1Swing isi 06:31.9 06:37.9 6047 6.047 9 226806
Digger AT 1Dumping 06:37.9 06:44.2 6279 6.279 9 226806
Digger AT 1Swing koso 06:44.2 06:51.9 7696 7.696 9 226806
Digger AT 1Digging 06:52.0 07:06.3 14310 14.31 9 226806
Digger AT 1Swing isi 07:06.3 07:09.9 3638 3.638 9 226806
Digger AT 1Dumping 07:10.0 07:13.9 3845 3.845 9 226806
Digger AT 1Swing koso 07:13.9 07:20.9 7015 7.015 9 226806
Digger AT 1Digging 07:20.9 07:33.5 12542 12.542 9 226806
Digger AT 1Swing isi 07:33.5 07:39.6 6127 6.127 9 226806
Digger AT 1Dumping 07:39.6 07:44.7 5039 5.039 9 226806
Digger AT 1Swing koso 07:44.7 07:51.9 7171 7.171 9 226806
Digger AT 1Digging 07:51.9 08:01.4 9480 9.48 9 226806
Digger AT 1Swing isi 08:01.4 08:07.4 5922 5.922 9 226806
Digger AT 1Dumping 08:07.4 08:12.8 5371 5.371 9 226806
Digger AT 1Swing koso 08:12.8 08:20.3 7539 7.539 9 226806
Digger AT 1Digging 08:20.3 08:33.3 12955 12.955 9 226806 8 AR 46
Digger AT 1Swing isi 08:33.3 08:41.6 8323 8.323 9 226806
Digger AT 1Spotting 08:41.7 08:58.5 16812 16.812 10 288565
Digger AT 1Dumping 08:58.5 09:04.4 5948 5.948 10 288565
Digger AT 1Swing koso 09:04.5 09:12.1 7689 7.689 10 288565
Digger AT 1Digging 09:12.2 09:28.3 16110 16.11 10 288565
Digger AT 1Swing isi 09:28.4 09:34.8 6482 6.482 10 288565
Digger AT 1Dumping 09:34.9 09:40.5 5613 5.613 10 288565
Digger AT 1Swing koso 09:40.5 09:48.0 7545 7.545 10 288565
Digger AT 1Digging 09:48.1 10:02.8 14757 14.757 10 288565
Digger AT 1Swing isi 10:02.8 10:09.8 6916 6.916 10 288565
Digger AT 1Dumping 10:09.8 10:15.3 5532 5.532 10 288565
Digger AT 1Swing koso 10:15.3 10:21.3 5992 5.992 10 288565
Digger AT 1Digging 10:21.3 10:35.5 14178 14.178 10 288565
Digger AT 1Swing isi 10:35.6 10:41.1 5459 5.459 10 288565
Digger AT 1Dumping 10:41.1 10:46.0 4956 4.956 10 288565
Digger AT 1Swing koso 10:46.1 10:53.5 7347 7.347 10 288565
Digger AT 1Digging 10:53.5 11:05.6 12155 12.155 10 288565
Digger AT 1Swing isi 11:05.7 11:11.1 5465 5.465 10 288565
Digger AT 1Dumping 11:11.1 11:16.9 5791 5.791 10 288565
Digger AT 1Swing koso 11:17.0 11:23.7 6750 6.75 10 288565
Digger AT 1Digging 11:23.7 11:41.6 17826 17.826 10 288565
Digger AT 1Swing isi 11:41.7 11:46.4 4763 4.763 10 288565
Digger AT 1Dumping 11:46.5 11:52.0 5444 5.444 10 288565
Digger AT 1Swing koso 11:52.0 11:55.8 3852 3.852 10 288565
Digger AT 1Digging 11:55.9 12:05.5 9536 9.536 10 288565
Digger AT 1Swing isi 12:05.5 12:09.1 3595 3.595 10 288565
Digger AT 1Dumping 12:09.2 12:13.7 4541 4.541 10 288565
Digger AT 1Swing koso 12:13.8 12:20.2 6414 6.414 10 288565
Digger AT 1Digging 12:20.3 12:31.5 11275 11.275 10 288565
Digger AT 1Swing isi 12:31.6 12:38.8 7282 7.282 10 288565
Digger AT 1Dumping 12:38.9 12:46.0 7171 7.171 10 288565
Digger AT 1Swing koso 12:46.0 12:53.3 7209 7.209 10 288565
Digger AT 1Digging 12:53.3 13:22.7 29436 29.436 10 288565 7
Digger AT 1Swing isi 13:22.8 13:31.5 8724 8.724 10 288565
Digger AT 1Spotting 13:31.6 13:49.5 17916 17.916 11 256695
Digger AT 1Dumping 13:49.6 13:54.0 4376 4.376 11 256695
Digger AT 1Swing koso 13:54.0 14:00.2 6207 6.207 11 256695
Digger AT 1Digging 14:00.2 14:16.1 15842 15.842 11 256695
Digger AT 1Swing isi 14:16.4 14:22.7 6300 6.3 11 256695
Digger AT 1Dumping 14:22.7 14:29.5 6784 6.784 11 256695
Digger AT 1Swing koso 14:29.5 14:36.8 7274 7.274 11 256695
Digger AT 1Digging 14:36.8 14:45.1 8263 8.263 11 256695
Digger AT 1Swing isi 14:45.2 14:50.8 5570 5.57 11 256695
Digger AT 1Dumping 14:50.8 14:55.5 4652 4.652 11 256695
Digger AT 1Swing koso 14:55.6 15:02.0 6388 6.388 11 256695
Digger AT 1Digging 15:02.0 15:16.7 14744 14.744 11 256695
Digger AT 1Swing isi 15:16.7 15:24.2 7492 7.492 11 256695
Digger AT 1Dumping 15:24.3 15:28.8 4584 4.584 11 256695
Digger AT 1Swing koso 15:28.9 15:35.4 6519 6.519 11 256695
Digger AT 1Digging 15:35.5 15:48.2 12695 12.695 11 256695
Digger AT 1Swing isi 15:48.2 15:54.7 6500 6.5 11 256695
Digger AT 1Dumping 15:54.7 16:01.2 6462 6.462 11 256695
Digger AT 1Swing koso 16:01.2 16:08.7 7546 7.546 11 256695
Digger AT 1Digging 16:08.7 16:24.2 15487 15.487 11 256695
Digger AT 1Swing isi 16:24.3 16:28.5 4147 4.147 11 256695
Digger AT 1Dumping 16:28.5 16:32.6 4103 4.103 11 256695
Digger AT 1Swing koso 16:32.7 16:39.4 6722 6.722 11 256695
Digger AT 1Digging 16:39.5 16:54.0 14543 14.543 11 256695
Digger AT 1Swing isi 16:54.0 16:58.3 4318 4.318 11 256695
Digger AT 1Dumping 16:58.4 17:04.4 6001 6.001 11 256695
Digger AT 1Swing koso 17:04.4 17:12.5 8152 8.152 11 256695
Digger AT 1Collect mat 17:19.7 17:34.5 21915 21.915 11 256695
Digger AT 1Digging 17:34.5 17:43.2 8706 8.706 11 256695 6
Digger AT 1Swing isi 17:43.2 17:49.7 6487 6.487 11 256695
Digger AT 1Spotting 17:49.8 17:57.5 7721 7.721 12 222938
Digger AT 1Dumping 17:57.6 18:01.7 4180 4.18 12 222938
Digger AT 1Swing koso 18:01.8 18:08.3 6501 6.501 12 222938
Digger AT 1Digging 18:08.3 18:25.6 17349 17.349 12 222938
Digger AT 1Swing isi 18:25.7 18:34.1 8433 8.433 12 222938
Digger AT 1Dumping 18:34.2 18:39.7 5584 5.584 12 222938
Digger AT 1Swing koso 18:39.8 18:45.0 5234 5.234 12 222938
Digger AT 1Digging 18:45.0 18:57.9 12919 12.919 12 222938
Digger AT 1Swing isi 18:57.9 19:04.3 6399 6.399 12 222938
Digger AT 1Dumping 19:04.4 19:10.3 5967 5.967 12 222938
Digger AT 1Swing koso 19:10.4 19:17.6 7204 7.204 12 222938
Digger AT 1Digging 19:17.6 19:31.1 13466 13.466 12 222938
Digger AT 1Swing isi 19:31.1 19:38.5 7328 7.328 12 222938
Digger AT 1Dumping 19:38.5 19:45.5 7022 7.022 12 222938
Digger AT 1Swing koso 19:45.5 19:51.2 5703 5.703 12 222938
Digger AT 1Digging 19:51.2 20:07.8 16593 16.593 12 222938
Digger AT 1Swing isi 20:07.9 20:14.1 6217 6.217 12 222938
Digger AT 1Dumping 20:14.1 20:19.3 5222 5.222 12 222938
Digger AT 1Swing koso 20:19.3 20:27.5 8181 8.181 12 222938
Digger AT 1Digging 20:27.5 20:40.4 12875 12.875 12 222938
Digger AT 1Swing isi 20:40.4 20:47.8 7346 7.346 12 222938
Digger AT 1Dumping 20:47.8 20:53.5 5714 5.714 12 222938
Digger AT 1Swing koso 20:53.5 21:00.4 6898 6.898 12 222938
Digger AT 1Wait haule 21:16.5 21:21.2 20605 20.605 12 222938
Digger AT 1Digging 21:21.2 21:29.2 8003 8.003 12 222938 7
Digger AT 1Swing isi 21:29.3 21:33.5 4274 4.274 12 222938
Digger AT 1Spotting 21:33.6 22:01.9 28303 28.303 13 276347
Digger AT 1Dumping 22:01.9 22:08.0 6011 6.011 13 276347
Digger AT 1Swing koso 22:08.0 22:13.6 5592 5.592 13 276347
Digger AT 1Collect mat 22:24.8 22:33.5 19876 19.876 13 276347
Digger AT 1Digging 22:33.6 22:42.0 8436 8.436 13 276347
Digger AT 1Swing isi 22:42.1 22:49.1 7019 7.019 13 276347
Digger AT 1Dumping 22:49.2 22:53.5 4374 4.374 13 276347
Digger AT 1Swing koso 22:53.6 23:01.2 7546 7.546 13 276347
Digger AT 1Digging 23:01.2 23:11.7 10514 10.514 13 276347
Digger AT 1Swing isi 23:11.8 23:18.2 6388 6.388 13 276347
Digger AT 1Dumping 23:18.2 23:23.8 5646 5.646 13 276347
Digger AT 1Swing koso 23:23.9 23:33.5 9629 9.629 13 276347
Digger AT 1Digging 23:33.6 23:44.0 10398 10.398 13 276347
Digger AT 1Swing isi 23:44.1 23:49.9 5826 5.826 13 276347
Digger AT 1Dumping 23:50.0 23:55.1 5159 5.159 13 276347
Digger AT 1Swing koso 23:55.2 24:00.9 5701 5.701 13 276347
Digger AT 1Digging 24:00.9 24:14.8 13901 13.901 13 276347
Digger AT 1Swing isi 24:14.8 24:22.7 7881 7.881 13 276347
Digger AT 1Dumping 24:22.7 24:28.2 5415 5.415 13 276347
Digger AT 1Swing koso 24:28.2 24:34.2 6072 6.072 13 276347
Digger AT 1Digging 24:34.3 24:48.6 14358 14.358 13 276347
Digger AT 1Swing isi 24:48.7 24:54.0 5257 5.257 13 276347
Digger AT 1Dumping 24:54.0 24:59.2 5185 5.185 13 276347
Digger AT 1Swing koso 24:59.2 25:06.9 7775 7.775 13 276347
Digger AT 1Digging 25:07.0 25:19.0 12029 12.029 13 276347
Digger AT 1Swing isi 25:19.1 25:24.5 5385 5.385 13 276347
Digger AT 1Dumping 25:24.6 25:29.9 5350 5.35 13 276347
Digger AT 1Swing koso 25:30.0 25:36.5 6547 6.547 13 276347
Digger AT 1Wait haule 25:41.3 25:58.8 22204 22.204 13 276347
Digger AT 1Digging 25:58.8 26:06.3 7491 7.491 13 276347 8
Digger AT 1Swing isi 26:06.3 26:11.4 5079 5.079 13 276347
Digger AT 1Spotting 26:11.5 26:31.5 19952 19.952 14 573705
Digger AT 1Dumping 26:31.5 26:37.3 5716 5.716 14 573705
Digger AT 1Swing koso 26:37.3 26:43.6 6367 6.367 14 573705
Digger AT 1Digging 26:43.7 26:54.9 11284 11.284 14 573705
Digger AT 1Swing isi 26:55.0 27:01.9 6977 6.977 14 573705
Digger AT 1Dumping 27:01.9 27:08.9 6986 6.986 14 573705
Digger AT 1Swing koso 27:09.0 27:14.9 5969 5.969 14 573705
Digger AT 1Digging 27:14.9 27:29.2 14308 14.308 14 573705
Digger AT 1Swing isi 27:29.3 27:35.0 5675 5.675 14 573705
Digger AT 1Dumping 27:35.0 27:40.9 5857 5.857 14 573705
Digger AT 1Swing koso 27:40.9 27:49.0 8019 8.019 14 573705
Digger AT 1Digging 27:49.0 27:59.5 10561 10.561 14 573705
Digger AT 1Swing isi 27:59.6 28:07.4 7867 7.867 14 573705
Digger AT 1Dumping 28:07.4 28:12.0 4592 4.592 14 573705
Digger AT 1Swing koso 28:12.1 28:18.8 6701 6.701 14 573705
Digger AT 1Digging 28:18.8 28:31.5 12678 12.678 14 573705
Digger AT 1Swing isi 28:31.5 28:37.5 6060 6.06 14 573705
Digger AT 1Dumping 28:37.6 28:43.1 5584 5.584 14 573705
Digger AT 1Swing koso 28:43.2 28:49.9 6717 6.717 14 573705
Digger AT 1Digging 28:49.9 29:01.8 11872 11.872 14 573705
Digger AT 1Swing isi 29:01.8 29:07.6 5847 5.847 14 573705
Digger AT 1Dumping 29:07.7 29:13.3 5674 5.674 14 573705
Digger AT 1Swing koso 29:13.4 29:20.4 7089 7.089 14 573705
Digger AT 1Digging 29:20.5 29:36.1 15612 15.612 14 573705
Digger AT 1Swing isi 29:36.2 29:41.5 5378 5.378 14 573705
Digger AT 1Dumping 29:41.6 29:47.4 5746 5.746 14 573705
Digger AT 1Swing koso 29:47.4 29:53.9 6551 6.551 14 573705
Digger AT 1Digging 29:54.0 30:06.8 12806 12.806 14 573705
Digger AT 1Swing isi 30:06.8 30:12.4 5663 5.663 14 573705
Digger AT 1Dumping 30:12.5 30:19.1 6602 6.602 14 573705
Digger AT 1Swing koso 30:19.1 30:23.5 4387 4.387 14 573705
Digger AT 1Wait haule 30:29.2 35:28.5 304962 304.962 14 573705
Digger AT 1Digging 35:28.6 35:37.9 9268 9.268 14 573705 7
Digger AT 1Swing isi 35:37.9 35:46.3 8378 8.378 14 573705
Digger AT 1Spotting 35:46.4 36:29.9 43557 43.557 15 254915
Digger AT 1Dumping 36:30.0 36:35.1 5111 5.111 15 254915
Digger AT 1Swing koso 36:35.1 36:40.8 5685 5.685 15 254915
Digger AT 1Digging 36:40.9 36:54.9 14015 14.015 15 254915
Digger AT 1Swing isi 36:55.1 37:02.6 7560 7.56 15 254915
Digger AT 1Dumping 37:02.6 37:07.1 4461 4.461 15 254915
Digger AT 1Swing koso 37:07.1 37:12.8 5669 5.669 15 254915
Digger AT 1Digging 37:12.9 37:24.8 11931 11.931 15 254915
Digger AT 1Swing isi 37:24.8 37:29.1 4270 4.27 15 254915
Digger AT 1Dumping 37:29.1 37:38.8 9677 9.677 15 254915
Digger AT 1Swing koso 37:38.9 37:42.7 3825 3.825 15 254915
Digger AT 1Digging 37:42.7 37:55.8 13090 13.09 15 254915
Digger AT 1Swing isi 37:55.8 38:01.5 5704 5.704 15 254915
Digger AT 1Dumping 38:01.5 38:11.4 9897 9.897 15 254915
Digger AT 1Swing koso 38:11.5 38:15.7 4203 4.203 15 254915
Digger AT 1Digging 38:15.8 38:26.9 11077 11.077 15 254915
Digger AT 1Swing isi 38:26.9 38:32.0 5086 5.086 15 254915
Digger AT 1Dumping 38:32.0 38:38.2 6213 6.213 15 254915
Digger AT 1Swing koso 38:38.2 38:43.3 5047 5.047 15 254915
Digger AT 1Digging 38:43.3 38:53.1 9802 9.802 15 254915
Digger AT 1Swing isi 38:53.2 38:58.2 5028 5.028 15 254915
Digger AT 1Dumping 38:58.3 39:04.8 6522 6.522 15 254915
Digger AT 1Swing koso 39:04.8 39:11.4 6532 6.532 15 254915
Digger AT 1Digging 39:11.4 39:21.5 10073 10.073 15 254915
Digger AT 1Swing isi 39:21.5 39:27.1 5601 5.601 15 254915
Digger AT 1Dumping 39:27.1 39:31.6 4497 4.497 15 254915
Digger AT 1Swing koso 39:31.7 39:42.7 11055 11.055 15 254915
Digger AT 1Digging 39:42.7 39:56.8 14044 14.044 15 254915 7
Digger AT 1Swing isi 39:56.9 40:02.6 5683 5.683 15 254915
Digger AT 1Spotting 40:02.6 40:21.1 18523 18.523 16 271635
Digger AT 1Dumping 40:21.2 40:26.1 4918 4.918 16 271635
Digger AT 1Swing koso 40:26.2 40:30.9 4728 4.728 16 271635
Digger AT 1Digging 40:31.0 40:39.8 8806 8.806 16 271635
Digger AT 1Swing isi 40:39.9 40:47.9 8029 8.029 16 271635
Digger AT 1Dumping 40:47.9 40:53.1 5176 5.176 16 271635
Digger AT 1Swing koso 40:53.1 41:00.4 7252 7.252 16 271635
Digger AT 1Digging 41:00.4 41:11.6 11251 11.251 16 271635
Digger AT 1Swing isi 41:11.6 41:18.5 6849 6.849 16 271635
Digger AT 1Dumping 41:18.5 41:23.6 5112 5.112 16 271635
Digger AT 1Swing koso 41:23.6 41:29.4 5758 5.758 16 271635
Digger AT 1Digging 41:29.4 41:41.4 11995 11.995 16 271635
Digger AT 1Swing isi 41:41.4 41:48.4 6969 6.969 16 271635
Digger AT 1Dumping 41:48.4 41:52.7 4294 4.294 16 271635
Digger AT 1Swing koso 41:52.8 41:58.6 5772 5.772 16 271635
Digger AT 1Digging 41:58.6 42:05.5 6923 6.923 16 271635
Digger AT 1Swing isi 42:05.5 42:10.6 5098 5.098 16 271635
Digger AT 1Dumping 42:10.7 42:15.7 5004 5.004 16 271635
Digger AT 1Swing koso 42:15.8 42:21.6 5802 5.802 16 271635
Digger AT 1Digging 42:21.6 42:29.4 7800 7.8 16 271635
Digger AT 1Swing isi 42:29.4 42:37.6 8206 8.206 16 271635
Digger AT 1Dumping 42:37.6 42:42.0 4381 4.381 16 271635
Digger AT 1Swing koso 42:42.0 42:47.0 4949 4.949 16 271635
Digger AT 1Digging 42:47.1 42:57.2 10164 10.164 16 271635
Digger AT 1Swing isi 42:57.3 43:02.4 5078 5.078 16 271635
Digger AT 1Dumping 43:02.4 43:08.7 6248 6.248 16 271635
Digger AT 1Swing koso 43:08.7 43:14.7 6024 6.024 16 271635
Digger AT 1Wait haule 43:29.6 43:52.0 37156 37.156 16 271635
Digger AT 1Collect mat 43:52.1 44:21.1 29012 29.012 16 271635
Digger AT 1Digging 44:21.2 44:31.2 10018 10.018 16 271635 7
Digger AT 1Swing isi 44:31.3 44:35.6 4340 4.34 16 271635
Digger AT 1Spotting 44:35.7 44:45.8 10132 10.132 17 286032
Digger AT 1Dumping 44:45.8 44:51.0 5157 5.157 17 286032
Digger AT 1Swing koso 44:51.1 44:53.6 2525 2.525 17 286032
Digger AT 1Digging 44:53.6 45:02.6 8982 8.982 17 286032
Digger AT 1Swing isi 45:02.6 45:06.9 4305 4.305 17 286032
Digger AT 1Dumping 45:07.0 45:12.5 5516 5.516 17 286032
Digger AT 1Swing koso 45:12.5 45:16.2 3709 3.709 17 286032
Digger AT 1Digging 45:16.3 45:24.8 8467 8.467 17 286032
Digger AT 1Swing isi 45:24.8 45:29.2 4405 4.405 17 286032
Digger AT 1Dumping 45:29.2 45:34.5 5266 5.266 17 286032
Digger AT 1Swing koso 45:34.5 45:38.9 4390 4.39 17 286032
Digger AT 1Digging 45:39.0 45:48.5 9523 9.523 17 286032
Digger AT 1Swing isi 45:48.6 45:52.7 4190 4.19 17 286032
Digger AT 1Dumping 45:52.8 45:58.3 5501 5.501 17 286032
Digger AT 1Swing koso 45:58.4 46:01.1 2669 2.669 17 286032
Digger AT 1Digging 46:01.1 46:11.0 9889 9.889 17 286032
Digger AT 1Swing isi 46:11.1 46:15.7 4637 4.637 17 286032
Digger AT 1Dumping 46:15.8 46:20.6 4788 4.788 17 286032
Digger AT 1Swing koso 46:20.7 46:25.2 4559 4.559 17 286032
Digger AT 1Digging 46:25.2 46:31.8 6565 6.565 17 286032
Digger AT 1Swing isi 46:31.8 46:35.7 3879 3.879 17 286032
Digger AT 1Dumping 46:35.8 46:40.9 5121 5.121 17 286032
Digger AT 1Swing koso 46:41.0 46:45.6 4606 4.606 17 286032
Digger AT 1Digging 46:45.7 46:56.3 10580 10.58 17 286032
Digger AT 1Swing isi 46:56.3 47:01.7 5433 5.433 17 286032
Digger AT 1Dumping 47:01.7 47:06.2 4459 4.459 17 286032
Digger AT 1Swing koso 47:06.2 47:11.5 5256 5.256 17 286032
Digger AT 1Wait haule 47:21.5 49:13.4 121884 121.884 17 286032
Digger AT 1Digging 49:13.4 49:19.9 6486 6.486 17 286032 7
Digger AT 1Swing isi 49:20.0 49:23.1 3153 3.153 17 286032
Digger AT 1Spotting 49:23.2 49:26.6 3451 3.451 18 173346
Digger AT 1Dumping 49:26.6 49:31.6 4948 4.948 18 173346
Digger AT 1Swing koso 49:31.7 49:34.2 2511 2.511 18 173346
Digger AT 1Digging 49:34.2 49:40.9 6651 6.651 18 173346
Digger AT 1Swing isi 49:40.9 49:44.5 3564 3.564 18 173346
Digger AT 1Dumping 49:44.5 49:48.2 3660 3.66 18 173346
Digger AT 1Swing koso 49:48.2 49:51.1 2869 2.869 18 173346
Digger AT 1Digging 49:51.1 50:01.1 9989 9.989 18 173346
Digger AT 1Swing isi 50:01.1 50:05.5 4408 4.408 18 173346
Digger AT 1Dumping 50:05.6 50:10.3 4649 4.649 18 173346
Digger AT 1Swing koso 50:10.3 50:13.9 3633 3.633 18 173346
Digger AT 1Digging 50:13.9 50:20.3 6390 6.39 18 173346
Digger AT 1Swing isi 50:20.3 50:25.0 4703 4.703 18 173346
Digger AT 1Dumping 50:25.1 50:30.5 5378 5.378 18 173346
Digger AT 1Swing koso 50:30.5 50:34.4 3885 3.885 18 173346
Digger AT 1Digging 50:34.5 50:41.0 6518 6.518 18 173346
Digger AT 1Swing isi 50:41.0 50:44.8 3816 3.816 18 173346
Digger AT 1Dumping 50:44.9 50:48.2 3333 3.333 18 173346
Digger AT 1Swing koso 50:48.3 50:52.8 4483 4.483 18 173346
Digger AT 1Digging 50:52.9 51:02.9 10019 10.019 18 173346
Digger AT 1Swing isi 51:03.0 51:07.0 3996 3.996 18 173346
Digger AT 1Dumping 51:07.0 51:11.7 4667 4.667 18 173346
Digger AT 1Swing koso 51:11.8 51:18.2 6423 6.423 18 173346
Digger AT 1Digging 51:18.2 51:26.1 7881 7.881 18 173346
Digger AT 1Swing isi 51:26.1 51:29.0 2880 2.88 18 173346
Digger AT 1Dumping 51:29.0 51:34.7 5656 5.656 18 173346
Digger AT 1Swing koso 51:34.7 51:39.2 4499 4.499 18 173346
Digger AT 1Wait haule 51:39.2 52:06.7 27491 27.491 18 173346
Digger AT 1Digging 52:06.8 52:14.6 7823 7.823 18 173346 7
Digger AT 1Swing isi 52:14.6 52:17.8 3172 3.172 18 173346
Digger AT 1Spotting 52:17.8 52:37.4 19590 19.59 19 200100
Digger AT 1Dumping 52:37.5 52:42.4 4915 4.915 19 200100
Digger AT 1Swing koso 52:42.5 52:46.1 3626 3.626 19 200100
Digger AT 1Digging 52:46.1 52:54.9 8786 8.786 19 200100
Digger AT 1Swing isi 52:54.9 52:59.3 4393 4.393 19 200100
Digger AT 1Dumping 52:59.4 53:01.9 2510 2.51 19 200100
Digger AT 1Swing koso 53:01.9 53:08.4 6516 6.516 19 200100
Digger AT 1Digging 53:08.5 53:22.9 14445 14.445 19 200100
Digger AT 1Swing isi 53:22.9 53:26.8 3882 3.882 19 200100
Digger AT 1Dumping 53:26.8 53:30.1 3275 3.275 19 200100
Digger AT 1Swing koso 53:30.2 53:34.0 3862 3.862 19 200100
Digger AT 1Digging 53:34.1 53:44.8 10690 10.69 19 200100
Digger AT 1Swing isi 53:44.9 53:48.3 3447 3.447 19 200100
Digger AT 1Dumping 53:48.4 53:55.2 6782 6.782 19 200100
Digger AT 1Swing koso 53:55.2 53:58.4 3150 3.15 19 200100
Digger AT 1Digging 53:58.4 54:05.5 7095 7.095 19 200100
Digger AT 1Swing isi 54:05.5 54:09.8 4283 4.283 19 200100
Digger AT 1Dumping 54:09.8 54:15.2 5431 5.431 19 200100
Digger AT 1Swing koso 54:15.3 54:18.3 3043 3.043 19 200100
Digger AT 1Digging 54:18.4 54:25.6 7236 7.236 19 200100
Digger AT 1Swing isi 54:25.6 54:31.3 5635 5.635 19 200100
Digger AT 1Dumping 54:31.3 54:36.8 5525 5.525 19 200100
Digger AT 1Swing koso 54:36.9 54:41.1 4219 4.219 19 200100
Digger AT 1Digging 54:41.2 54:49.1 7915 7.915 19 200100
Digger AT 1Swing isi 54:49.1 54:53.6 4459 4.459 19 200100
Digger AT 1Dumping 54:53.7 55:00.0 6344 6.344 19 200100
Digger AT 1Swing koso 55:00.0 55:07.0 7025 7.025 19 200100
Digger AT 1Wait haule 55:07.1 55:21.1 14066 14.066 19 200100
Digger AT 1Collect mat 55:21.2 55:27.2 6006 6.006 19 200100
Digger AT 1Digging 55:27.2 55:35.5 8270 8.27 19 200100 7
Digger AT 1Swing isi 55:35.5 55:39.2 3679 3.679 19 200100
Digger AT 1Spotting 55:39.2 55:52.7 13476 13.476 20 222633
Digger AT 1Dumping 55:52.7 55:57.5 4761 4.761 20 222633
Digger AT 1Swing koso 55:57.5 56:00.6 3126 3.126 20 222633
Digger AT 1Digging 56:00.6 56:09.2 8530 8.53 20 222633
Digger AT 1Swing isi 56:09.3 56:14.6 5351 5.351 20 222633
Digger AT 1Dumping 56:14.7 56:19.9 5244 5.244 20 222633
Digger AT 1Swing koso 56:20.0 56:23.9 3896 3.896 20 222633
Digger AT 1Digging 56:24.0 56:33.9 9966 9.966 20 222633
Digger AT 1Swing isi 56:34.0 56:38.1 4071 4.071 20 222633
Digger AT 1Dumping 56:38.2 56:42.8 4620 4.62 20 222633
Digger AT 1Swing koso 56:42.9 56:46.9 4053 4.053 20 222633
Digger AT 1Digging 56:47.0 56:57.0 9981 9.981 20 222633
Digger AT 1Swing isi 56:57.0 57:01.5 4536 4.536 20 222633
Digger AT 1Dumping 57:01.6 57:07.1 5548 5.548 20 222633
Digger AT 1Swing koso 57:07.1 57:10.7 3591 3.591 20 222633
Digger AT 1Digging 57:10.8 57:19.1 8341 8.341 20 222633
Digger AT 1Swing isi 57:19.2 57:24.5 5344 5.344 20 222633
Digger AT 1Dumping 57:24.6 57:30.1 5453 5.453 20 222633
Digger AT 1Swing koso 57:30.1 57:34.6 4549 4.549 20 222633
Digger AT 1Digging 57:34.6 57:45.7 11054 11.054 20 222633
Digger AT 1Swing isi 57:45.7 57:49.7 3983 3.983 20 222633
Digger AT 1Dumping 57:49.7 57:54.2 4521 4.521 20 222633
Digger AT 1Swing koso 57:54.3 57:58.3 4083 4.083 20 222633
Digger AT 1Digging 57:58.4 58:04.7 6337 6.337 20 222633
Digger AT 1Swing isi 58:04.7 58:09.8 5071 5.071 20 222633
Digger AT 1Dumping 58:09.8 58:15.9 6111 6.111 20 222633
Digger AT 1Swing koso 58:15.9 58:22.5 6553 6.553 20 222633
Digger AT 1Wait haule 58:22.5 59:12.3 49818 49.818 20 222633
Digger AT 1Digging 59:12.4 59:19.6 7249 7.249 20 222633 8
Digger AT 1Swing isi 59:19.7 59:23.2 3416 3.416 20 222633
Digger AT 1Spotting 59:23.3 59:34.3 11076 11.076 21 230746
Digger AT 1Dumping 59:34.3 59:41.6 7250 7.25 21 230746
Digger AT 1Swing koso 59:41.6 59:45.5 3832 3.832 21 230746
Digger AT 1Digging 59:45.5 59:52.7 7247 7.247 21 230746
Digger AT 1Swing isi 59:52.7 59:56.1 3357 3.357 21 230746
Digger AT 1Dumping 59:56.1 59:59.0 2919 2.919 21 230746
Digger AT 1Swing koso 59:59.1 00:02.1 3036 3.036 21 230746
Digger AT 1Digging 00:02.1 00:09.8 7679 7.679 21 230746
Digger AT 1Swing isi 00:09.8 00:13.8 3982 3.982 21 230746
Digger AT 1Dumping 00:13.9 00:17.6 3728 3.728 21 230746
Digger AT 1Swing koso 00:17.7 00:21.1 3403 3.403 21 230746
Digger AT 1Digging 00:21.2 00:29.0 7855 7.855 21 230746
Digger AT 1Swing isi 00:29.0 00:33.6 4611 4.611 21 230746
Digger AT 1Dumping 00:33.7 00:37.8 4083 4.083 21 230746
Digger AT 1Swing koso 00:37.9 00:41.4 3555 3.555 21 230746
Digger AT 1Digging 00:41.5 00:47.2 5675 5.675 21 230746
Digger AT 1Swing isi 00:47.2 00:51.8 4560 4.56 21 230746
Digger AT 1Dumping 00:51.9 00:57.4 5546 5.546 21 230746
Digger AT 1Swing koso 00:57.4 01:00.9 3507 3.507 21 230746
Digger AT 1Digging 01:01.0 01:09.6 8669 8.669 21 230746
Digger AT 1Swing isi 01:09.6 01:14.5 4840 4.84 21 230746
Digger AT 1Dumping 01:14.5 01:18.0 3543 3.543 21 230746
Digger AT 1Swing koso 01:18.1 01:24.8 6717 6.717 21 230746
Digger AT 1Digging 01:24.9 01:37.7 12839 12.839 21 230746
Digger AT 1Swing isi 01:37.7 01:42.5 4819 4.819 21 230746
Digger AT 1Dumping 01:42.6 01:50.1 7542 7.542 21 230746
Digger AT 1Swing koso 01:50.1 01:54.3 4176 4.176 21 230746
Digger AT 1Digging 01:54.3 02:03.7 9428 9.428 21 230746
Digger AT 1Swing isi 02:03.8 02:09.1 5324 5.324 21 230746
Digger AT 1Dumping 02:09.2 02:14.4 5281 5.281 21 230746
Digger AT 1Swing koso 01:50.1 01:54.3 4176 4.176 21 230746
Digger AT 1Wait haule 02:14.5 03:05.6 46923 46.923 21 230746
Digger AT 1Digging 03:05.6 03:12.4 6792 6.792 21 230746 8
Digger AT 1Swing isi 03:12.5 03:15.3 2776 2.776 21 230746
Digger AT 1Spotting 03:15.3 03:19.8 4513 4.513 22 467686
Digger AT 1Dumping 03:19.8 03:24.3 4476 4.476 22 467686
Digger AT 1Swing koso 03:24.4 03:28.1 3670 3.67 22 467686
Digger AT 1Digging 03:28.1 03:38.9 10794 10.794 22 467686
Digger AT 1Swing isi 03:39.0 03:42.9 3952 3.952 22 467686
Digger AT 1Dumping 03:43.0 03:46.8 3804 3.804 22 467686
Digger AT 1Swing koso 03:46.9 03:53.3 6396 6.396 22 467686
Digger AT 1Digging 03:53.3 04:05.9 12603 12.603 22 467686
Digger AT 1Swing isi 04:05.9 04:11.3 5370 5.37 22 467686
Digger AT 1Dumping 04:11.3 04:15.2 3893 3.893 22 467686
Digger AT 1Swing koso 04:15.2 04:21.4 6214 6.214 22 467686
Digger AT 1Digging 04:21.4 04:33.8 12346 12.346 22 467686
Digger AT 1Swing isi 04:33.8 04:38.2 4381 4.381 22 467686
Digger AT 1Dumping 04:38.3 04:41.9 3641 3.641 22 467686
Digger AT 1Swing koso 04:42.0 04:46.3 4328 4.328 22 467686
Digger AT 1Digging 04:46.4 04:58.4 12020 12.02 22 467686
Digger AT 1Swing isi 04:58.4 05:02.5 4064 4.064 22 467686
Digger AT 1Dumping 05:02.6 05:06.6 4069 4.069 22 467686
Digger AT 1Swing koso 05:06.7 05:10.5 3792 3.792 22 467686
Digger AT 1Digging 05:10.6 05:27.3 16662 16.662 22 467686
Digger AT 1Swing isi 05:27.3 05:31.3 4008 4.008 22 467686
Digger AT 1Dumping 05:31.4 05:36.3 4940 4.94 22 467686
Digger AT 1Swing koso 05:36.4 05:41.3 4944 4.944 22 467686
Digger AT 1Digging 05:41.4 05:54.6 13171 13.171 22 467686
Digger AT 1Swing isi 05:54.6 06:00.2 5597 5.597 22 467686
Digger AT 1Dumping 06:00.2 06:05.9 5637 5.637 22 467686
Digger AT 1Swing koso 06:05.9 06:11.5 5659 5.659 22 467686
Digger AT 1Digging 06:11.6 06:25.6 14027 14.027 22 467686
Digger AT 1Swing isi 06:25.6 06:30.9 5313 5.313 22 467686
Digger AT 1Dumping 06:31.0 06:36.5 5503 5.503 22 467686
Digger AT 1Swing koso 06:36.5 06:42.9 6346 6.346 22 467686
Digger AT 1Pindah Fro 06:47.5 10:09.8 202315 202.315 22 467686
Digger AT 1Wait haule 10:24.1 10:55.5 31360 31.36 22 467686
Digger AT 1Digging 10:55.5 11:02.4 6938 6.938 22 467686 8
Digger AT 1Swing isi 11:02.5 11:04.7 2205 2.205 22 467686
Digger AT 1Spotting 11:04.7 11:08.5 3801 3.801 23 243295
Digger AT 1Dumping 11:08.5 11:15.6 7106 7.106 23 243295
Digger AT 1Swing koso 11:15.6 11:20.2 4517 4.517 23 243295
Digger AT 1Digging 11:20.2 11:35.7 15511 15.511 23 243295
Digger AT 1Swing isi 11:35.9 11:40.1 4222 4.222 23 243295
Digger AT 1Dumping 11:40.3 11:44.9 4561 4.561 23 243295
Digger AT 1Swing koso 11:45.1 11:47.8 2699 2.699 23 243295
Digger AT 1Digging 11:48.0 12:03.1 15129 15.129 23 243295
Digger AT 1Swing isi 12:03.1 12:08.2 5134 5.134 23 243295
Digger AT 1Dumping 12:08.3 12:12.6 4303 4.303 23 243295
Digger AT 1Swing koso 12:12.6 12:16.0 3322 3.322 23 243295
Digger AT 1Digging 12:16.0 12:27.1 11108 11.108 23 243295
Digger AT 1Swing isi 12:27.2 12:30.9 3695 3.695 23 243295
Digger AT 1Dumping 12:30.9 12:35.5 4539 4.539 23 243295
Digger AT 1Swing koso 12:35.5 12:39.3 3709 3.709 23 243295
Digger AT 1Digging 12:39.3 12:51.1 11815 11.815 23 243295
Digger AT 1Swing isi 12:51.2 12:55.6 4395 4.395 23 243295
Digger AT 1Dumping 12:55.6 12:59.0 3413 3.413 23 243295
Digger AT 1Swing koso 12:59.1 13:03.1 4023 4.023 23 243295
Digger AT 1Digging 13:03.2 13:10.9 7727 7.727 23 243295
Digger AT 1Swing isi 13:10.9 13:16.5 5639 5.639 23 243295
Digger AT 1Dumping 13:16.6 13:22.2 5631 5.631 23 243295
Digger AT 1Swing koso 13:22.3 13:26.3 4072 4.072 23 243295
Digger AT 1Digging 13:26.4 13:35.6 9161 9.161 23 243295
Digger AT 1Swing isi 13:35.7 13:39.5 3881 3.881 23 243295
Digger AT 1Dumping 13:39.6 13:45.3 5725 5.725 23 243295
Digger AT 1Swing koso 13:45.4 13:50.6 5180 5.18 23 243295
Digger AT 1Digging 13:50.6 13:56.9 6310 6.31 23 243295
Digger AT 1Swing isi 13:56.9 14:02.9 5999 5.999 23 243295
Digger AT 1Dumping 14:03.0 14:10.8 7816 7.816 23 243295
Digger AT 1Swing koso 14:10.8 14:14.8 4031 4.031 23 243295
Digger AT 1Collect mat 14:26.6 14:49.8 34946 34.946 23 243295
Digger AT 1Digging 14:49.8 15:04.9 15057 15.057 23 243295 7
Digger AT 1Swing isi 15:04.9 15:10.0 5118 5.118 23 243295
Digger AT 1Spotting 15:10.1 15:21.9 11842 11.842 24 472959
Digger AT 1Dumping 15:21.9 15:26.6 4718 4.718 24 472959
Digger AT 1Swing koso 15:26.7 15:30.6 3896 3.896 24 472959
Digger AT 1Digging 15:30.6 15:44.8 14200 14.2 24 472959
Digger AT 1Swing isi 15:44.9 15:48.9 4010 4.01 24 472959
Digger AT 1Dumping 15:48.9 15:52.0 3059 3.059 24 472959
Digger AT 1Swing koso 15:52.0 15:55.2 3207 3.207 24 472959
Digger AT 1Digging 15:55.3 16:07.0 11726 11.726 24 472959
Digger AT 1Swing isi 16:07.1 16:12.3 5244 5.244 24 472959
Digger AT 1Dumping 16:12.4 16:15.9 3558 3.558 24 472959
Digger AT 1Swing koso 16:16.0 16:19.9 3842 3.842 24 472959
Digger AT 1Digging 16:19.9 16:31.5 11588 11.588 24 472959
Digger AT 1Swing isi 16:31.5 16:37.8 6298 6.298 24 472959
Digger AT 1Dumping 16:37.9 16:42.5 4664 4.664 24 472959
Digger AT 1Swing koso 16:42.6 16:48.4 5771 5.771 24 472959
Digger AT 1Digging 16:48.5 16:57.9 9476 9.476 24 472959
Digger AT 1Swing isi 16:58.0 17:02.9 4919 4.919 24 472959
Digger AT 1Dumping 17:02.9 17:08.2 5268 5.268 24 472959
Digger AT 1Swing koso 17:08.3 17:12.2 3948 3.948 24 472959
Digger AT 1Digging 17:12.3 17:22.8 10507 10.507 24 472959
Digger AT 1Swing isi 17:22.9 17:27.8 4924 4.924 24 472959
Digger AT 1Dumping 17:27.8 17:33.5 5626 5.626 24 472959
Digger AT 1Swing koso 17:33.6 17:38.0 4471 4.471 24 472959
Digger AT 1Digging 17:38.1 17:50.4 12305 12.305 24 472959
Digger AT 1Swing isi 17:50.4 17:54.7 4244 4.244 24 472959
Digger AT 1Dumping 17:54.7 17:59.7 5004 5.004 24 472959
Digger AT 1Swing koso 17:59.8 18:03.6 3737 3.737 24 472959
Digger AT 1Wait haule 18:16.0 18:18.6 14920 14.92 24 472959
Digger AT 1Collect mat 18:18.6 18:32.6 14042 14.042 24 472959
Digger AT 1Digging 18:32.7 18:41.7 9083 9.083 24 472959 8
Digger AT 1Swing isi 18:41.8 18:46.2 4337 4.337 24 472959
Digger AT 1Dumping 18:46.2 18:53.4 7133 7.133 24 472959
Digger AT 1Swing koso 18:53.4 18:56.9 3491 3.491 24 472959
Digger AT 1Collect mat 19:13.4 19:36.9 39849 39.849 24 472959
Digger AT 1Digging 19:37.0 19:42.3 5361 5.361 24 472959
Digger AT 1Swing isi 19:42.3 19:46.5 4141 4.141 24 472959
Digger AT 1Dumping 19:46.6 19:54.4 7874 7.874 24 472959
Digger AT 1Swing koso 19:54.5 20:01.1 6632 6.632 24 472959
Digger AT 1Digging 20:01.1 20:07.6 6532 6.532 24 472959
Digger AT 1Swing isi 20:07.7 20:11.3 3601 3.601 24 472959
Digger AT 1Dumping 20:11.3 20:15.1 3772 3.772 24 472959
Digger AT 1Swing koso 20:15.1 20:19.1 4066 4.066 24 472959
Digger AT 1Digging 20:19.2 20:31.8 12666 12.666 24 472959
Digger AT 1Swing isi 20:31.9 20:36.4 4556 4.556 24 472959
Digger AT 1Dumping 20:36.4 20:40.9 4420 4.42 24 472959
Digger AT 1Swing koso 20:40.9 20:44.9 4007 4.007 24 472959
Digger AT 1Digging 20:45.0 20:53.8 8821 8.821 24 472959
Digger AT 1Swing isi 20:53.9 20:59.0 5115 5.115 24 472959
Digger AT 1Dumping 20:59.0 21:03.8 4844 4.844 24 472959
Digger AT 1Swing koso 21:03.9 21:07.8 3842 3.842 24 472959
Digger AT 1Digging 21:07.8 21:20.6 12760 12.76 24 472959
Digger AT 1Swing isi 21:20.7 21:26.4 5685 5.685 24 472959
Digger AT 1Dumping 21:26.4 21:31.1 4734 4.734 24 472959
Digger AT 1Swing koso 21:31.2 21:35.0 3818 3.818 24 472959
Digger AT 1Digging 21:35.1 21:49.4 14337 14.337 24 472959
Digger AT 1Swing isi 21:49.5 21:53.2 3691 3.691 24 472959
Digger AT 1Dumping 21:53.3 21:59.1 5786 5.786 24 472959
Digger AT 1Swing koso 21:59.1 22:03.1 3944 3.944 24 472959
Digger AT 1Digging 22:03.1 22:11.8 8714 8.714 24 472959
Digger AT 1Swing isi 22:11.9 22:16.9 5055 5.055 24 472959
Digger AT 1Dumping 22:16.9 22:22.9 5990 5.99 24 472959
Digger AT 1Swing koso 22:22.9 22:28.4 5406 5.406 24 472959
Digger AT 1Collect mat 22:28.4 22:54.3 25828 25.828 24 472959
Digger AT 1Digging 22:54.3 23:03.0 8627 8.627 24 472959 7
Digger AT 1Swing isi 23:03.0 23:06.5 3427 3.427 24 472959
Digger AT 1Spotting 23:06.5 23:20.3 13784 13.784 25 413855
Digger AT 1Dumping 23:20.3 23:24.1 3858 3.858 25 413855
Digger AT 1Swing koso 23:24.2 23:28.0 3753 3.753 25 413855
Digger AT 1Digging 23:28.0 23:46.6 18651 18.651 25 413855
Digger AT 1Swing isi 23:46.7 23:51.6 4966 4.966 25 413855
Digger AT 1Dumping 23:51.7 23:56.0 4327 4.327 25 413855
Digger AT 1Swing koso 23:56.0 23:59.7 3653 3.653 25 413855
Digger AT 1Digging 23:59.7 24:07.3 7545 7.545 25 413855
Digger AT 1Swing isi 24:07.3 24:12.2 4857 4.857 25 413855
Digger AT 1Dumping 24:12.2 24:17.1 4896 4.896 25 413855
Digger AT 1Swing koso 24:17.2 24:20.9 3702 3.702 25 413855
Digger AT 1Digging 24:20.9 24:29.3 8388 8.388 25 413855
Digger AT 1Swing isi 24:29.3 24:34.0 4631 4.631 25 413855
Digger AT 1Dumping 24:34.1 24:38.6 4559 4.559 25 413855
Digger AT 1Swing koso 24:38.7 24:42.2 3539 3.539 25 413855
Digger AT 1Digging 24:42.3 24:53.2 10933 10.933 25 413855
Digger AT 1Swing isi 24:53.3 24:58.2 4896 4.896 25 413855
Digger AT 1Dumping 24:58.2 25:03.8 5543 5.543 25 413855
Digger AT 1Swing koso 25:03.8 25:08.0 4213 4.213 25 413855
Digger AT 1Digging 25:08.1 25:16.9 8757 8.757 25 413855
Digger AT 1Swing isi 25:16.9 25:22.5 5609 5.609 25 413855
Digger AT 1Dumping 25:22.6 25:27.6 5063 5.063 25 413855
Digger AT 1Swing koso 25:27.7 25:31.9 4250 4.25 25 413855
Digger AT 1Digging 25:32.0 25:39.8 7749 7.749 25 413855
Digger AT 1Swing isi 25:39.8 25:44.6 4765 4.765 25 413855
Digger AT 1Dumping 25:44.6 25:50.7 6136 6.136 25 413855
Digger AT 1Swing koso 25:50.7 25:54.8 4044 4.044 25 413855
Digger AT 1Wait haule 26:04.0 29:48.8 233875 233.875 25 413855
Digger AT 1Digging 29:48.9 29:58.3 9417 9.417 25 413855 6
Digger AT 1Swing isi 29:58.4 30:01.9 3496 3.496 25 413855
Digger AT 1Spotting 30:01.9 30:31.9 29932 29.932 26 191113
Digger AT 1Dumping 30:31.9 30:36.0 4152 4.152 26 191113
Digger AT 1Swing koso 30:36.1 30:39.0 2869 2.869 26 191113
Digger AT 1Digging 30:39.0 30:54.5 15459 15.459 26 191113
Digger AT 1Swing isi 30:54.6 30:58.6 3986 3.986 26 191113
Digger AT 1Dumping 30:58.6 31:03.4 4792 4.792 26 191113
Digger AT 1Swing koso 31:03.5 31:07.3 3821 3.821 26 191113
Digger AT 1Digging 31:07.4 31:17.1 9705 9.705 26 191113
Digger AT 1Swing isi 31:17.2 31:22.7 5519 5.519 26 191113
Digger AT 1Dumping 31:22.7 31:27.9 5167 5.167 26 191113
Digger AT 1Swing koso 31:27.9 31:32.9 4994 4.994 26 191113
Digger AT 1Digging 31:33.0 31:44.8 11816 11.816 26 191113
Digger AT 1Swing isi 31:44.8 31:48.6 3790 3.79 26 191113
Digger AT 1Dumping 31:48.7 31:54.1 5438 5.438 26 191113
Digger AT 1Swing koso 31:54.2 31:59.2 5029 5.029 26 191113
Digger AT 1Digging 31:59.3 32:08.3 8997 8.997 26 191113
Digger AT 1Swing isi 32:08.4 32:14.3 5922 5.922 26 191113
Digger AT 1Dumping 32:14.4 32:19.7 5299 5.299 26 191113
Digger AT 1Swing koso 32:19.7 32:23.4 3682 3.682 26 191113
Digger AT 1Digging 32:23.5 32:33.8 10370 10.37 26 191113
Digger AT 1Swing isi 32:33.9 32:39.0 5149 5.149 26 191113
Digger AT 1Dumping 32:39.0 32:44.8 5763 5.763 26 191113
Digger AT 1Swing koso 32:44.8 32:51.4 6595 6.595 26 191113
Digger AT 1Collect mat 32:51.4 33:03.2 11774 11.774 26 191113
Digger AT 1Digging 33:03.2 33:11.3 8123 8.123 26 191113 6
Digger AT 1Swing isi 33:11.4 33:14.3 2970 2.97 26 191113
Digger AT 1Spotting 33:14.4 33:21.9 7565 7.565 27 163040
Digger AT 1Dumping 33:21.9 33:26.8 4890 4.89 27 163040
Digger AT 1Swing koso 33:26.9 33:30.9 4024 4.024 27 163040
Digger AT 1Digging 33:30.9 33:42.4 11448 11.448 27 163040
Digger AT 1Swing isi 33:42.4 33:47.3 4917 4.917 27 163040
Digger AT 1Dumping 33:47.4 33:52.1 4657 4.657 27 163040
Digger AT 1Swing koso 33:52.2 33:56.5 4376 4.376 27 163040
Digger AT 1Digging 33:56.6 34:07.3 10702 10.702 27 163040
Digger AT 1Swing isi 34:07.4 34:13.2 5815 5.815 27 163040
Digger AT 1Dumping 34:13.2 34:18.4 5179 5.179 27 163040
Digger AT 1Swing koso 34:18.4 34:22.7 4296 4.296 27 163040
Digger AT 1Digging 34:22.8 34:34.1 11312 11.312 27 163040
Digger AT 1Swing isi 34:34.1 34:39.9 5829 5.829 27 163040
Digger AT 1Dumping 34:40.0 34:43.6 3644 3.644 27 163040
Digger AT 1Swing koso 34:43.7 34:47.6 3916 3.916 27 163040
Digger AT 1Digging 34:47.7 35:01.1 13410 13.41 27 163040
Digger AT 1Swing isi 35:01.1 35:06.1 5013 5.013 27 163040
Digger AT 1Dumping 35:06.1 35:10.0 3902 3.902 27 163040
Digger AT 1Swing koso 35:10.0 35:15.8 5770 5.77 27 163040
Digger AT 1Digging 35:15.8 35:25.9 10090 10.09 27 163040
Digger AT 1Swing isi 35:26.0 35:31.2 5186 5.186 27 163040
Digger AT 1Dumping 35:31.3 35:36.4 5075 5.075 27 163040
Digger AT 1Swing koso 35:36.4 35:41.6 5199 5.199 27 163040
Digger AT 1Digging 35:41.7 35:52.1 10401 10.401 27 163040 7
Digger AT 1Swing isi 35:52.2 35:58.6 6424 6.424 27 163040
Digger AT 1Spotting 35:58.6 36:18.6 19970 19.97 28 270650
Digger AT 1Dumping 36:18.6 36:25.5 6895 6.895 28 270650
Digger AT 1Swing koso 36:25.5 36:31.7 6184 6.184 28 270650
Digger AT 1Digging 36:31.7 37:03.4 31719 31.719 28 270650
Digger AT 1Swing isi 37:03.5 37:17.0 13501 13.501 28 270650
Digger AT 1Dumping 37:17.0 37:24.4 7434 7.434 28 270650
Digger AT 1Swing koso 37:24.4 37:32.2 7776 7.776 28 270650
Digger AT 1Digging 37:32.2 37:46.5 14268 14.268 28 270650
Digger AT 1Swing isi 37:46.6 37:52.4 5840 5.84 28 270650
Digger AT 1Dumping 37:52.4 37:58.4 6007 6.007 28 270650
Digger AT 1Swing koso 37:58.4 38:01.8 3357 3.357 28 270650
Digger AT 1Digging 38:01.9 38:11.9 9986 9.986 28 270650
Digger AT 1Swing isi 38:12.0 38:15.4 3460 3.46 28 270650
Digger AT 1Dumping 38:15.4 38:22.9 7483 7.483 28 270650
Digger AT 1Swing koso 38:22.9 38:29.3 6399 6.399 28 270650
Digger AT 1Digging 38:29.4 38:41.5 12174 12.174 28 270650
Digger AT 1Swing isi 38:41.5 38:45.4 3852 3.852 28 270650
Digger AT 1Dumping 38:45.5 38:50.2 4764 4.764 28 270650
Digger AT 1Swing koso 38:50.3 38:54.8 4493 4.493 28 270650
Digger AT 1Digging 38:54.9 39:07.7 12828 12.828 28 270650
Digger AT 1Swing isi 39:07.7 39:12.5 4782 4.782 28 270650
Digger AT 1Dumping 39:12.5 39:18.0 5469 5.469 28 270650
Digger AT 1Swing koso 39:18.1 39:21.9 3781 3.781 28 270650
Digger AT 1Digging 39:21.9 39:36.0 14102 14.102 28 270650
Digger AT 1Swing isi 39:36.1 39:39.5 3453 3.453 28 270650
Digger AT 1Dumping 39:39.5 39:44.2 4692 4.692 28 270650
Digger AT 1Swing koso 39:44.3 39:48.7 4431 4.431 28 270650
Digger AT 1Collect mat 40:03.7 40:15.3 26394 26.394 28 270650
Digger AT 1Digging 40:15.3 40:27.4 12114 12.114 28 270650 7
Digger AT 1Swing isi 40:27.5 40:30.5 3042 3.042 28 270650
Digger AT 1Spotting 40:30.5 40:37.3 6756 6.756 29 615692
Digger AT 1Dumping 40:37.3 40:43.3 6014 6.014 29 615692
Digger AT 1Swing koso 40:43.3 40:47.3 4013 4.013 29 615692
Digger AT 1Digging 40:47.4 40:58.9 11455 11.455 29 615692
Digger AT 1Swing isi 40:58.9 41:03.6 4678 4.678 29 615692
Digger AT 1Dumping 41:03.6 41:08.7 5063 5.063 29 615692
Digger AT 1Swing koso 41:08.8 41:14.5 5683 5.683 29 615692
Digger AT 1Digging 41:14.5 41:26.5 12069 12.069 29 615692
Digger AT 1Swing isi 41:26.6 41:32.8 6196 6.196 29 615692
Digger AT 1Dumping 41:32.8 41:37.1 4322 4.322 29 615692
Digger AT 1Swing koso 41:37.2 41:40.6 3393 3.393 29 615692
Digger AT 1Digging 41:40.7 41:49.8 9154 9.154 29 615692
Digger AT 1Swing isi 41:49.9 41:54.6 4720 4.72 29 615692
Digger AT 1Dumping 41:54.7 42:00.1 5422 5.422 29 615692
Digger AT 1Swing koso 42:00.2 42:05.2 5053 5.053 29 615692
Digger AT 1Digging 42:05.3 42:17.8 12488 12.488 29 615692
Digger AT 1Swing isi 42:17.8 42:22.3 4492 4.492 29 615692
Digger AT 1Dumping 42:22.3 42:27.2 4900 4.9 29 615692
Digger AT 1Swing koso 42:27.3 42:31.9 4587 4.587 29 615692
Digger AT 1Digging 42:31.9 42:41.9 10010 10.01 29 615692
Digger AT 1Swing isi 42:42.0 42:45.8 3807 3.807 29 615692
Digger AT 1Dumping 42:45.9 42:51.3 5419 5.419 29 615692
Digger AT 1Swing koso 42:51.4 42:56.4 4994 4.994 29 615692
Digger AT 1Digging 42:56.5 43:06.7 10244 10.244 29 615692
Digger AT 1Swing isi 43:06.8 43:12.7 5952 5.952 29 615692
Digger AT 1Dumping 43:12.8 43:18.5 5744 5.744 29 615692
Digger AT 1Swing koso 43:18.5 43:27.3 8811 8.811 29 615692
Digger AT 1Bantu HD S 43:27.3 50:36.0 428657 428.657 29 615692
Digger AT 1Digging 50:36.0 50:44.7 8641 8.641 29 615692 5
Digger AT 1Swing isi 50:44.7 50:47.7 2955 2.955 29 615692
Digger AT 1Spotting 50:47.7 50:53.3 5611 5.611 30 145124
Digger AT 1Dumping 50:53.3 51:05.7 12394 12.394 30 145124
Digger AT 1Swing koso 51:05.8 51:08.5 2722 2.722 30 145124
Digger AT 1Digging 51:08.5 51:16.7 8246 8.246 30 145124
Digger AT 1Swing isi 51:16.8 51:20.7 3959 3.959 30 145124
Digger AT 1Dumping 51:20.7 51:26.8 6035 6.035 30 145124
Digger AT 1Swing koso 51:26.8 51:32.7 5863 5.863 30 145124
Digger AT 1Digging 51:32.7 51:39.8 7154 7.154 30 145124
Digger AT 1Swing isi 51:39.9 51:43.5 3611 3.611 30 145124
Digger AT 1Dumping 51:43.5 51:46.5 2954 2.954 30 145124
Digger AT 1Swing koso 51:46.5 51:50.4 3916 3.916 30 145124
Digger AT 1Digging 51:50.5 51:58.6 8171 8.171 30 145124
Digger AT 1Swing isi 51:58.7 52:05.2 6579 6.579 30 145124
Digger AT 1Dumping 52:05.3 52:12.3 7090 7.09 30 145124
Digger AT 1Swing koso 52:12.4 52:15.8 3458 3.458 30 145124
Digger AT 1Digging 52:15.9 52:28.5 12598 12.598 30 145124
Digger AT 1Swing isi 52:28.5 52:34.7 6210 6.21 30 145124
Digger AT 1Dumping 52:34.7 52:40.1 5330 5.33 30 145124
Digger AT 1Swing koso 52:40.2 52:54.6 14472 14.472 30 145124
Digger AT 1Digging 52:54.7 53:08.9 14235 14.235 30 145124 6
Digger AT 1Swing isi 53:09.0 53:13.5 4516 4.516 30 145124
Digger AT 1Spotting 53:13.6 54:46.8 93218 93.218 31 255664
Digger AT 1Dumping 54:46.9 54:51.4 4576 4.576 31 255664
Digger AT 1Swing koso 54:51.5 54:54.5 3037 3.037 31 255664
Digger AT 1Digging 54:54.5 55:04.5 9973 9.973 31 255664
Digger AT 1Swing isi 55:04.6 55:09.5 4902 4.902 31 255664
Digger AT 1Dumping 55:09.6 55:14.9 5342 5.342 31 255664
Digger AT 1Swing koso 55:15.0 55:19.4 4450 4.45 31 255664
Digger AT 1Digging 55:19.5 55:32.7 13161 13.161 31 255664
Digger AT 1Swing isi 55:32.7 55:37.4 4748 4.748 31 255664
Digger AT 1Dumping 55:37.5 55:41.4 3926 3.926 31 255664
Digger AT 1Swing koso 55:41.5 55:45.2 3721 3.721 31 255664
Digger AT 1Digging 55:45.3 55:56.6 11386 11.386 31 255664
Digger AT 1Swing isi 55:56.7 56:02.7 6024 6.024 31 255664
Digger AT 1Dumping 56:02.8 56:08.8 6057 6.057 31 255664
Digger AT 1Swing koso 56:08.8 56:13.2 4381 4.381 31 255664
Digger AT 1Digging 56:13.3 56:24.7 11373 11.373 31 255664
Digger AT 1Swing isi 56:24.7 56:31.0 6334 6.334 31 255664
Digger AT 1Dumping 56:31.1 56:35.4 4367 4.367 31 255664
Digger AT 1Swing koso 56:35.5 56:40.3 4811 4.811 31 255664
Digger AT 1Digging 56:40.4 56:49.8 9358 9.358 31 255664
Digger AT 1Swing isi 56:49.8 56:54.4 4590 4.59 31 255664
Digger AT 1Dumping 56:54.5 56:59.8 5339 5.339 31 255664
Digger AT 1Swing koso 56:59.9 57:10.7 10818 10.818 31 255664
Digger AT 1Collect mat 57:10.8 57:18.2 7490 7.49 31 255664
Digger AT 1Digging 57:18.3 57:27.7 9454 9.454 31 255664 6
Digger AT 1Swing isi 57:27.8 57:30.6 2828 2.828 31 255664
Digger AT 1Spotting 57:30.7 57:51.1 20478 20.478 32 188941
Digger AT 1Dumping 57:51.1 57:55.9 4785 4.785 32 188941
Digger AT 1Swing koso 57:56.0 57:59.8 3825 3.825 32 188941
Digger AT 1Digging 57:59.9 58:11.5 11612 11.612 32 188941
Digger AT 1Swing isi 58:11.5 58:15.2 3701 3.701 32 188941
Digger AT 1Dumping 58:15.3 58:19.9 4641 4.641 32 188941
Digger AT 1Swing koso 58:20.0 58:23.6 3625 3.625 32 188941
Digger AT 1Digging 58:23.7 58:34.0 10388 10.388 32 188941
Digger AT 1Swing isi 58:34.1 58:38.7 4613 4.613 32 188941
Digger AT 1Dumping 58:38.8 58:43.8 4951 4.951 32 188941
Digger AT 1Swing koso 58:43.8 58:48.2 4396 4.396 32 188941
Digger AT 1Digging 58:48.3 58:58.1 9825 9.825 32 188941
Digger AT 1Swing isi 58:58.2 59:02.6 4408 4.408 32 188941
Digger AT 1Dumping 59:02.7 59:05.9 3240 3.24 32 188941
Digger AT 1Swing koso 59:06.0 59:09.5 3531 3.531 32 188941
Digger AT 1Digging 59:09.6 59:18.2 8659 8.659 32 188941
Digger AT 1Swing isi 59:18.3 59:23.4 5117 5.117 32 188941
Digger AT 1Dumping 59:23.5 59:29.3 5880 5.88 32 188941
Digger AT 1Swing koso 59:29.3 59:34.3 4993 4.993 32 188941
Digger AT 1Digging 59:34.4 59:48.5 14110 14.11 32 188941
Digger AT 1Swing isi 59:48.6 59:52.9 4340 4.34 32 188941
Digger AT 1Dumping 59:53.0 59:57.8 4779 4.779 32 188941
Digger AT 1Swing koso 59:57.9 00:03.9 6021 6.021 32 188941
Digger AT 1Collect mat 00:03.9 00:29.0 25115 25.115 32 188941
Digger AT 1Digging 00:29.1 00:36.6 7539 7.539 32 188941 7
Digger AT 1Swing isi 00:36.7 00:41.0 4369 4.369 32 188941
Digger AT 1Spotting 00:41.1 00:45.5 4385 4.385 33 1182877
Digger AT 1Dumping 00:45.6 00:49.9 4271 4.271 33 1182877
Digger AT 1Swing koso 00:49.9 00:53.2 3239 3.239 33 1182877
Digger AT 1Digging 00:53.2 01:00.3 7075 7.075 33 1182877
Digger AT 1Swing isi 01:00.3 01:04.1 3843 3.843 33 1182877
Digger AT 1Dumping 01:04.2 01:08.4 4227 4.227 33 1182877
Digger AT 1Swing koso 01:08.5 01:11.7 3233 3.233 33 1182877
Digger AT 1Digging 01:11.8 01:17.6 5752 5.752 33 1182877
Digger AT 1Swing isi 01:17.6 01:24.3 6653 6.653 33 1182877
Digger AT 1Dumping 01:24.3 01:28.7 4462 4.462 33 1182877
Digger AT 1Swing koso 01:28.8 01:32.8 3941 3.941 33 1182877
Digger AT 1Digging 01:32.8 01:45.1 12288 12.288 33 1182877
Digger AT 1Swing isi 01:45.1 01:48.5 3418 3.418 33 1182877
Digger AT 1Dumping 01:48.6 01:53.8 5210 5.21 33 1182877
Digger AT 1Swing koso 01:53.9 01:57.8 3936 3.936 33 1182877
Digger AT 1Digging 01:57.9 02:10.4 12568 12.568 33 1182877
Digger AT 1Swing isi 02:10.5 02:14.0 3578 3.578 33 1182877
Digger AT 1Dumping 02:14.1 02:19.4 5299 5.299 33 1182877
Digger AT 1Swing koso 02:19.4 02:23.9 4571 4.571 33 1182877
Digger AT 1Digging 02:24.0 02:36.5 12580 12.58 33 1182877
Digger AT 1Swing isi 02:36.6 02:43.3 6720 6.72 33 1182877
Digger AT 1Dumping 02:43.3 02:47.5 4176 4.176 33 1182877
Digger AT 1Swing koso 02:47.5 02:53.1 5644 5.644 33 1182877
Digger AT 1Digging 02:53.2 03:00.8 7618 7.618 33 1182877
Digger AT 1Swing isi 03:00.9 03:05.0 4102 4.102 33 1182877
Digger AT 1Dumping 03:05.0 03:09.1 4091 4.091 33 1182877
Digger AT 1Swing koso 03:09.2 03:16.2 7033 7.033 33 1182877
Digger AT 1Wait haule 03:16.3 07:47.0 270781 270.781 33 1182877
Digger AT 1Operator S 07:47.1 19:54.7 727624 727.624 33 1182877
Digger AT 1Digging 19:54.8 20:15.1 20368 20.368 33 1182877 6
Digger AT 1Swing isi 20:15.2 20:25.3 10191 10.191 33 1182877
Digger AT 1Spotting 20:25.4 20:36.8 11422 11.422 34 163255
Digger AT 1Dumping 20:36.9 20:41.3 4396 4.396 34 163255
Digger AT 1Swing koso 20:41.3 20:45.1 3785 3.785 34 163255
Digger AT 1Digging 20:45.1 20:57.1 12058 12.058 34 163255
Digger AT 1Swing isi 20:57.2 21:01.6 4476 4.476 34 163255
Digger AT 1Dumping 21:01.7 21:05.9 4148 4.148 34 163255
Digger AT 1Swing koso 21:05.9 21:09.6 3686 3.686 34 163255
Digger AT 1Digging 21:09.6 21:22.7 13051 13.051 34 163255
Digger AT 1Swing isi 21:22.7 21:26.7 3990 3.99 34 163255
Digger AT 1Dumping 21:26.8 21:31.9 5114 5.114 34 163255
Digger AT 1Swing koso 21:31.9 21:35.7 3807 3.807 34 163255
Digger AT 1Digging 21:35.7 21:45.3 9601 9.601 34 163255
Digger AT 1Swing isi 21:45.4 21:50.0 4571 4.571 34 163255
Digger AT 1Dumping 21:50.1 21:54.0 3960 3.96 34 163255
Digger AT 1Swing koso 21:54.1 21:57.7 3631 3.631 34 163255
Digger AT 1Digging 21:57.8 22:05.4 7628 7.628 34 163255
Digger AT 1Swing isi 22:05.5 22:11.0 5494 5.494 34 163255
Digger AT 1Dumping 22:11.0 22:16.5 5558 5.558 34 163255
Digger AT 1Swing koso 22:16.5 22:20.8 4209 4.209 34 163255
Digger AT 1Digging 22:20.8 22:29.7 8830 8.83 34 163255
Digger AT 1Swing isi 22:29.7 22:34.1 4436 4.436 34 163255
Digger AT 1Dumping 22:34.2 22:39.0 4769 4.769 34 163255
Digger AT 1Swing koso 22:39.0 22:45.3 6221 6.221 34 163255
Digger AT 1Digging 22:45.3 23:02.7 17454 17.454 34 163255 6
Digger AT 1Swing isi 23:02.8 23:09.8 6960 6.96 34 163255
Digger AT 1Spotting 23:09.8 23:23.6 13835 13.835 35 173307
Digger AT 1Dumping 23:23.7 23:27.4 3714 3.714 35 173307
Digger AT 1Swing koso 23:27.5 23:34.1 6632 6.632 35 173307
Digger AT 1Digging 23:34.1 23:45.9 11742 11.742 35 173307
Digger AT 1Swing isi 23:45.9 23:49.6 3726 3.726 35 173307
Digger AT 1Dumping 23:49.7 23:53.7 3952 3.952 35 173307
Digger AT 1Swing koso 23:53.7 23:57.6 3896 3.896 35 173307
Digger AT 1Digging 23:57.7 24:08.9 11225 11.225 35 173307
Digger AT 1Swing isi 24:08.9 24:13.7 4743 4.743 35 173307
Digger AT 1Dumping 24:13.8 24:17.5 3718 3.718 35 173307
Digger AT 1Swing koso 24:17.6 24:20.9 3340 3.34 35 173307
Digger AT 1Digging 24:21.0 24:32.6 11635 11.635 35 173307
Digger AT 1Swing isi 24:32.7 24:35.6 2924 2.924 35 173307
Digger AT 1Dumping 24:35.6 24:39.7 4062 4.062 35 173307
Digger AT 1Swing koso 24:39.7 24:43.3 3603 3.603 35 173307
Digger AT 1Digging 24:43.3 24:54.7 11377 11.377 35 173307
Digger AT 1Swing isi 24:54.7 25:00.6 5875 5.875 35 173307
Digger AT 1Dumping 25:00.6 25:05.1 4479 4.479 35 173307
Digger AT 1Swing koso 25:05.2 25:08.7 3467 3.467 35 173307
Digger AT 1Digging 25:08.7 25:18.2 9426 9.426 35 173307
Digger AT 1Swing isi 25:18.2 25:23.6 5377 5.377 35 173307
Digger AT 1Dumping 25:23.6 25:28.4 4737 4.737 35 173307
Digger AT 1Swing koso 25:28.4 25:43.6 15177 15.177 35 173307
Digger AT 1Digging 25:43.6 26:00.3 16629 16.629 35 173307 7
Digger AT 1Swing isi 26:00.4 26:04.4 4016 4.016 35 173307
Digger AT 1Spotting 26:04.4 26:11.8 7425 7.425 36 492108
Digger AT 1Dumping 26:11.8 26:16.2 4313 4.313 36 492108
Digger AT 1Swing koso 26:16.2 26:20.8 4639 4.639 36 492108
Digger AT 1Digging 26:20.9 26:30.3 9367 9.367 36 492108
Digger AT 1Swing isi 26:30.3 26:35.3 5040 5.04 36 492108
Digger AT 1Dumping 26:35.3 26:39.3 3950 3.95 36 492108
Digger AT 1Swing koso 26:39.4 26:43.0 3669 3.669 36 492108
Digger AT 1Digging 26:43.1 26:53.0 9832 9.832 36 492108
Digger AT 1Swing isi 26:53.0 26:57.5 4491 4.491 36 492108
Digger AT 1Dumping 26:57.5 27:02.3 4709 4.709 36 492108
Digger AT 1Swing koso 27:02.3 27:07.4 5021 5.021 36 492108
Digger AT 1Digging 27:07.4 27:18.6 11124 11.124 36 492108
Digger AT 1Swing isi 27:18.6 27:22.6 4063 4.063 36 492108
Digger AT 1Dumping 27:22.7 27:27.7 5038 5.038 36 492108
Digger AT 1Swing koso 27:27.8 27:32.4 4610 4.61 36 492108
Digger AT 1Digging 27:32.5 27:42.5 9972 9.972 36 492108
Digger AT 1Swing isi 27:42.6 27:53.0 10390 10.39 36 492108
Digger AT 1Dumping 27:53.0 27:57.1 4031 4.031 36 492108
Digger AT 1Swing koso 27:57.1 28:00.6 3499 3.499 36 492108
Digger AT 1Digging 28:00.7 28:07.7 7033 7.033 36 492108
Digger AT 1Swing isi 28:07.8 28:12.1 4291 4.291 36 492108
Digger AT 1Dumping 28:12.1 28:17.2 5089 5.089 36 492108
Digger AT 1Swing koso 28:17.2 28:26.4 9262 9.262 36 492108
Digger AT 1Digging 28:26.5 28:38.4 11912 11.912 36 492108
Digger AT 1Swing isi 28:38.4 28:44.9 6409 6.409 36 492108
Digger AT 1Dumping 28:44.9 28:49.1 4269 4.269 36 492108
Digger AT 1Swing koso 28:49.2 29:07.9 18711 18.711 36 492108
Digger AT 1Wait haule 29:08.0 34:06.7 298787 298.787 36 492108
Digger AT 1Digging 34:06.8 34:12.6 5813 5.813 36 492108 7
Digger AT 1Swing isi 34:12.6 34:17.9 5349 5.349 36 492108
Digger AT 1Spotting 34:18.0 34:24.0 6015 6.015 37 210114
Digger AT 1Dumping 34:24.0 34:28.9 4879 4.879 37 210114
Digger AT 1Swing koso 34:28.9 34:33.1 4170 4.17 37 210114
Digger AT 1Digging 34:33.1 34:47.9 14806 14.806 37 210114
Digger AT 1Swing isi 34:48.0 34:51.2 3263 3.263 37 210114
Digger AT 1Dumping 34:51.3 34:55.3 4022 4.022 37 210114
Digger AT 1Swing koso 34:55.4 34:58.8 3442 3.442 37 210114
Digger AT 1Digging 34:58.8 35:08.3 9524 9.524 37 210114
Digger AT 1Swing isi 35:08.4 35:14.7 6234 6.234 37 210114
Digger AT 1Dumping 35:14.7 35:18.7 4064 4.064 37 210114
Digger AT 1Swing koso 35:18.8 35:23.6 4788 4.788 37 210114
Digger AT 1Digging 35:23.6 35:34.8 11188 11.188 37 210114
Digger AT 1Swing isi 35:34.8 35:39.5 4682 4.682 37 210114
Digger AT 1Dumping 35:39.5 35:44.3 4793 4.793 37 210114
Digger AT 1Swing koso 35:44.4 35:48.8 4408 4.408 37 210114
Digger AT 1Digging 35:48.9 36:01.9 13045 13.045 37 210114
Digger AT 1Swing isi 36:01.9 36:07.1 5143 5.143 37 210114
Digger AT 1Dumping 36:07.1 36:11.9 4726 4.726 37 210114
Digger AT 1Swing koso 36:11.9 36:16.4 4427 4.427 37 210114
Digger AT 1Digging 36:16.4 36:28.7 12256 12.256 37 210114
Digger AT 1Swing isi 36:28.7 36:33.0 4331 4.331 37 210114
Digger AT 1Dumping 36:33.1 36:38.4 5294 5.294 37 210114
Digger AT 1Swing koso 36:38.4 36:50.7 12315 12.315 37 210114
Digger AT 1Digging 36:51.0 37:02.6 11660 11.66 37 210114
Digger AT 1Swing isi 37:02.7 37:06.2 3498 3.498 37 210114
Digger AT 1Dumping 37:06.2 37:09.5 3246 3.246 37 210114
Digger AT 1Swing koso 37:09.5 37:25.3 15767 15.767 37 210114
Digger AT 1Collect mat 37:25.3 37:35.3 9919 9.919 37 210114
Digger AT 1Digging 37:35.3 37:45.4 10081 10.081 37 210114 6
Digger AT 1Swing isi 37:45.4 37:49.6 4128 4.128 37 210114
Digger AT 1Spotting 37:49.7 38:02.8 13179 13.179 38 204083
Digger AT 1Dumping 38:02.9 38:05.6 2626 2.626 38 204083
Digger AT 1Swing koso 38:05.6 38:09.0 3397 3.397 38 204083
Digger AT 1Digging 38:09.0 38:22.7 13702 13.702 38 204083
Digger AT 1Swing isi 38:22.8 38:26.8 4024 4.024 38 204083
Digger AT 1Dumping 38:26.8 38:30.9 4025 4.025 38 204083
Digger AT 1Swing koso 38:31.0 38:35.1 4198 4.198 38 204083
Digger AT 1Digging 38:35.2 38:47.4 12142 12.142 38 204083
Digger AT 1Swing isi 38:47.4 38:53.3 5870 5.87 38 204083
Digger AT 1Dumping 38:53.3 38:59.1 5777 5.777 38 204083
Digger AT 1Swing koso 38:59.1 39:04.4 5281 5.281 38 204083
Digger AT 1Digging 39:04.4 39:18.5 14144 14.144 38 204083
Digger AT 1Swing isi 39:18.6 39:23.3 4683 4.683 38 204083
Digger AT 1Dumping 39:23.4 39:29.3 5871 5.871 38 204083
Digger AT 1Swing koso 39:29.3 39:33.6 4331 4.331 38 204083
Digger AT 1Digging 39:33.7 39:45.8 12134 12.134 38 204083
Digger AT 1Swing isi 39:45.9 39:51.7 5797 5.797 38 204083
Digger AT 1Dumping 39:51.7 39:56.5 4843 4.843 38 204083
Digger AT 1Swing koso 39:56.6 40:02.3 5652 5.652 38 204083
Digger AT 1Digging 40:02.3 40:10.8 8471 8.471 38 204083
Digger AT 1Swing isi 40:10.8 40:15.9 5156 5.156 38 204083
Digger AT 1Dumping 40:16.0 40:22.8 6744 6.744 38 204083
Digger AT 1Swing koso 40:22.8 40:35.2 12477 12.477 38 204083
Digger AT 1Collect mat 40:42.7 41:01.8 26474 26.474 38 204083
Digger AT 1Digging 41:01.8 41:10.6 8735 8.735 38 204083 6
Digger AT 1Swing isi 41:10.6 41:14.9 4350 4.35 38 204083
Digger AT 1Spotting 41:15.0 41:23.1 8105 8.105 39 173960
Digger AT 1Dumping 41:23.1 41:28.5 5422 5.422 39 173960
Digger AT 1Swing koso 41:28.5 41:32.5 3981 3.981 39 173960
Digger AT 1Digging 41:32.6 41:43.1 10545 10.545 39 173960
Digger AT 1Swing isi 41:43.2 41:46.9 3705 3.705 39 173960
Digger AT 1Dumping 41:46.9 41:51.7 4770 4.77 39 173960
Digger AT 1Swing koso 41:51.7 42:04.6 12834 12.834 39 173960
Digger AT 1Digging 42:04.6 42:12.8 8179 8.179 39 173960
Digger AT 1Swing isi 42:12.8 42:16.2 3441 3.441 39 173960
Digger AT 1Dumping 42:16.3 42:19.4 3197 3.197 39 173960
Digger AT 1Swing koso 42:19.5 42:22.6 3153 3.153 39 173960
Digger AT 1Digging 42:22.6 42:33.2 10526 10.526 39 173960
Digger AT 1Swing isi 42:33.2 42:38.0 4846 4.846 39 173960
Digger AT 1Dumping 42:38.1 42:43.6 5448 5.448 39 173960
Digger AT 1Swing koso 42:43.6 42:48.3 4721 4.721 39 173960
Digger AT 1Digging 42:48.4 43:00.6 12180 12.18 39 173960
Digger AT 1Swing isi 43:00.6 43:05.7 5080 5.08 39 173960
Digger AT 1Dumping 43:05.7 43:12.2 6482 6.482 39 173960
Digger AT 1Swing koso 43:12.2 43:15.6 3382 3.382 39 173960
Digger AT 1Digging 43:15.6 43:27.6 12008 12.008 39 173960
Digger AT 1Swing isi 43:27.6 43:33.7 6118 6.118 39 173960
Digger AT 1Dumping 43:33.8 43:41.5 7697 7.697 39 173960
Digger AT 1Swing koso 43:41.5 43:50.4 8961 8.961 39 173960
Digger AT 1Digging 43:50.5 44:05.1 14554 14.554 39 173960 7
Digger AT 1Swing isi 44:05.2 44:09.8 4625 4.625 39 173960
Digger AT 1Spotting 44:09.9 44:20.4 10507 10.507 40 261230
Digger AT 1Dumping 44:20.4 44:24.9 4409 4.409 40 261230
Digger AT 1Swing koso 44:24.9 44:28.6 3645 3.645 40 261230
Digger AT 1Digging 44:28.6 44:40.8 12154 12.154 40 261230
Digger AT 1Swing isi 44:40.8 44:45.9 5166 5.166 40 261230
Digger AT 1Dumping 44:46.0 44:49.7 3707 3.707 40 261230
Digger AT 1Swing koso 44:49.7 44:53.7 3922 3.922 40 261230
Digger AT 1Digging 44:53.7 45:06.8 13076 13.076 40 261230
Digger AT 1Swing isi 45:06.8 45:11.9 5093 5.093 40 261230
Digger AT 1Dumping 45:11.9 45:17.2 5342 5.342 40 261230
Digger AT 1Swing koso 45:17.3 45:20.6 3359 3.359 40 261230
Digger AT 1Digging 45:20.6 45:33.3 12654 12.654 40 261230
Digger AT 1Swing isi 45:33.3 45:38.4 5058 5.058 40 261230
Digger AT 1Dumping 45:38.4 45:42.2 3789 3.789 40 261230
Digger AT 1Swing koso 45:42.3 45:46.4 4161 4.161 40 261230
Digger AT 1Digging 45:46.5 45:56.8 10329 10.329 40 261230
Digger AT 1Swing isi 45:56.8 46:02.6 5737 5.737 40 261230
Digger AT 1Dumping 46:02.6 46:08.0 5382 5.382 40 261230
Digger AT 1Swing koso 46:08.0 46:12.6 4568 4.568 40 261230
Digger AT 1Digging 46:12.6 46:21.7 9110 9.11 40 261230
Digger AT 1Swing isi 46:21.8 46:26.5 4702 4.702 40 261230
Digger AT 1Dumping 46:26.5 46:32.5 5910 5.91 40 261230
Digger AT 1Swing koso 46:32.5 46:37.0 4560 4.56 40 261230
Digger AT 1Digging 46:37.1 46:50.2 13082 13.082 40 261230
Digger AT 1Swing isi 46:50.2 46:56.1 5931 5.931 40 261230
Digger AT 1Dumping 46:56.2 47:01.8 5594 5.594 40 261230
Digger AT 1Swing koso 47:01.8 47:08.4 6581 6.581 40 261230
Digger AT 1Wait haule 47:08.4 48:21.3 72882 72.882 40 261230
Digger AT 1Digging 48:21.3 48:28.8 7534 7.534 40 261230 6
Digger AT 1Swing isi 48:28.8 48:32.1 3286 3.286 40 261230
Digger AT 1Spotting 48:32.2 48:39.0 6799 6.799 41 190906
Digger AT 1Dumping 48:39.0 48:43.1 4097 4.097 41 190906
Digger AT 1Swing koso 48:43.1 48:47.4 4330 4.33 41 190906
Digger AT 1Digging 48:47.5 48:59.7 12234 12.234 41 190906
Digger AT 1Swing isi 48:59.8 49:04.1 4241 4.241 41 190906
Digger AT 1Dumping 49:04.1 49:08.4 4234 4.234 41 190906
Digger AT 1Swing koso 49:08.4 49:12.8 4401 4.401 41 190906
Digger AT 1Digging 49:12.9 49:26.8 13900 13.9 41 190906
Digger AT 1Swing isi 49:26.9 49:32.0 5059 5.059 41 190906
Digger AT 1Dumping 49:32.0 49:36.9 4937 4.937 41 190906
Digger AT 1Swing koso 49:37.0 49:41.5 4484 4.484 41 190906
Digger AT 1Digging 49:41.5 49:57.4 15846 15.846 41 190906
Digger AT 1Swing isi 49:57.4 50:01.7 4306 4.306 41 190906
Digger AT 1Dumping 50:01.8 50:05.2 3415 3.415 41 190906
Digger AT 1Swing koso 50:05.2 50:09.8 4644 4.644 41 190906
Digger AT 1Digging 50:09.9 50:21.0 11068 11.068 41 190906
Digger AT 1Swing isi 50:21.0 50:25.9 4931 4.931 41 190906
Digger AT 1Dumping 50:26.0 50:31.8 5833 5.833 41 190906
Digger AT 1Swing koso 50:31.9 50:36.6 4760 4.76 41 190906
Digger AT 1Digging 50:36.7 50:48.4 11719 11.719 41 190906
Digger AT 1Swing isi 50:48.4 50:52.8 4394 4.394 41 190906
Digger AT 1Dumping 50:52.8 50:59.7 6885 6.885 41 190906
Digger AT 1Swing koso 50:59.7 51:10.5 10794 10.794 41 190906
Digger AT 1Collect mat 51:15.5 51:22.6 11859 11.859 41 190906
Digger AT 1Digging 51:22.6 51:30.5 7927 7.927 41 190906 7
Digger AT 1Swing isi 51:30.5 51:44.3 13809 13.809 41 190906
Digger AT 1Spotting 51:44.4 51:49.8 5335 5.335 42 212972
Digger AT 1Dumping 51:49.8 51:54.8 5070 5.07 42 212972
Digger AT 1Swing koso 51:54.9 51:58.6 3770 3.77 42 212972
Digger AT 1Digging 51:58.7 52:10.5 11821 11.821 42 212972
Digger AT 1Swing isi 52:10.5 52:15.5 4981 4.981 42 212972
Digger AT 1Dumping 52:15.6 52:20.5 4910 4.91 42 212972
Digger AT 1Swing koso 52:20.6 52:24.8 4216 4.216 42 212972
Digger AT 1Digging 52:24.8 52:38.4 13602 13.602 42 212972
Digger AT 1Swing isi 52:38.5 52:43.7 5206 5.206 42 212972
Digger AT 1Dumping 52:43.7 52:49.7 6077 6.077 42 212972
Digger AT 1Swing koso 52:49.8 52:54.5 4790 4.79 42 212972
Digger AT 1Digging 52:54.6 53:08.4 13786 13.786 42 212972
Digger AT 1Swing isi 53:08.4 53:14.4 5999 5.999 42 212972
Digger AT 1Dumping 53:14.4 53:19.3 4836 4.836 42 212972
Digger AT 1Swing koso 53:19.4 53:23.4 3984 3.984 42 212972
Digger AT 1Digging 53:23.4 53:38.0 14617 14.617 42 212972
Digger AT 1Swing isi 53:38.1 53:42.1 3983 3.983 42 212972
Digger AT 1Dumping 53:42.1 53:46.6 4523 4.523 42 212972
Digger AT 1Swing koso 53:46.7 53:51.8 5105 5.105 42 212972
Digger AT 1Digging 53:51.9 54:08.3 16333 16.333 42 212972
Digger AT 1Swing isi 54:08.3 54:13.1 4758 4.758 42 212972
Digger AT 1Dumping 54:13.2 54:18.3 5157 5.157 42 212972
Digger AT 1Swing koso 54:18.4 54:23.1 4681 4.681 42 212972
Digger AT 1Digging 54:23.2 54:36.3 13146 13.146 42 212972
Digger AT 1Swing isi 54:36.3 54:41.9 5598 5.598 42 212972
Digger AT 1Dumping 54:42.0 54:47.6 5598 5.598 42 212972
Digger AT 1Swing koso 54:47.6 54:54.1 6434 6.434 42 212972
Digger AT 1Digging 54:54.1 55:13.2 19072 19.072 42 212972 6
Digger AT 1Swing isi 55:13.2 55:18.8 5584 5.584 42 212972
Digger AT 1Spotting 55:18.8 55:26.5 7739 7.739 43 166562
Digger AT 1Dumping 55:26.5 55:30.9 4378 4.378 43 166562
Digger AT 1Swing koso 55:30.9 55:34.9 3981 3.981 43 166562
Digger AT 1Digging 55:34.9 55:49.9 14999 14.999 43 166562
Digger AT 1Swing isi 55:50.0 55:54.3 4378 4.378 43 166562
Digger AT 1Dumping 55:54.4 55:58.6 4160 4.16 43 166562
Digger AT 1Swing koso 55:58.6 56:02.8 4234 4.234 43 166562
Digger AT 1Digging 56:02.9 56:20.2 17244 17.244 43 166562
Digger AT 1Swing isi 56:20.2 56:23.7 3480 3.48 43 166562
Digger AT 1Dumping 56:23.8 56:28.2 4438 4.438 43 166562
Digger AT 1Swing koso 56:28.3 56:31.2 2965 2.965 43 166562
Digger AT 1Digging 56:31.2 56:40.4 9198 9.198 43 166562
Digger AT 1Swing isi 56:40.5 56:45.3 4808 4.808 43 166562
Digger AT 1Dumping 56:45.4 56:50.5 5123 5.123 43 166562
Digger AT 1Swing koso 56:50.5 56:53.3 2772 2.772 43 166562
Digger AT 1Digging 56:53.3 57:05.0 11704 11.704 43 166562
Digger AT 1Swing isi 57:05.1 57:10.7 5676 5.676 43 166562
Digger AT 1Dumping 57:10.7 57:15.9 5175 5.175 43 166562
Digger AT 1Swing koso 57:16.0 57:19.7 3748 3.748 43 166562
Digger AT 1Digging 57:19.8 57:34.5 14649 14.649 43 166562
Digger AT 1Swing isi 57:34.5 57:38.0 3474 3.474 43 166562
Digger AT 1Dumping 57:38.0 57:42.5 4547 4.547 43 166562
Digger AT 1Swing koso 57:42.6 57:47.5 4983 4.983 43 166562
Digger AT 1Digging 57:47.6 58:01.4 13838 13.838 43 166562 6
Digger AT 1Swing isi 58:01.5 58:06.4 4871 4.871 43 166562
Digger AT 1Spotting 58:06.4 58:27.6 21269 21.269 44 210756
Digger AT 1Dumping 58:27.7 58:31.5 3770 3.77 44 210756
Digger AT 1Swing koso 58:31.5 58:36.8 5340 5.34 44 210756
Digger AT 1Digging 58:36.9 58:53.1 16249 16.249 44 210756
Digger AT 1Swing isi 58:53.2 58:59.0 5787 5.787 44 210756
Digger AT 1Dumping 58:59.0 59:03.3 4328 4.328 44 210756
Digger AT 1Swing koso 59:03.4 59:07.1 3696 3.696 44 210756
Digger AT 1Digging 59:07.2 59:24.1 16948 16.948 44 210756
Digger AT 1Swing isi 59:24.2 59:27.9 3710 3.71 44 210756
Digger AT 1Dumping 59:27.9 59:31.3 3394 3.394 44 210756
Digger AT 1Swing koso 59:31.4 59:35.7 4324 4.324 44 210756
Digger AT 1Digging 59:35.8 59:48.0 12279 12.279 44 210756
Digger AT 1Swing isi 59:48.1 59:53.3 5289 5.289 44 210756
Digger AT 1Dumping 59:53.4 59:58.2 4849 4.849 44 210756
Digger AT 1Swing koso 59:58.3 00:03.8 5550 5.55 44 210756
Digger AT 1Digging 00:03.9 00:16.6 12705 12.705 44 210756
Digger AT 1Swing isi 00:16.6 00:22.4 5774 5.774 44 210756
Digger AT 1Dumping 00:22.4 00:26.7 4279 4.279 44 210756
Digger AT 1Swing koso 00:26.7 00:30.9 4174 4.174 44 210756
Digger AT 1Digging 00:31.0 00:43.7 12670 12.67 44 210756
Digger AT 1Swing isi 00:43.7 00:49.5 5779 5.779 44 210756
Digger AT 1Dumping 00:49.5 00:55.0 5548 5.548 44 210756
Digger AT 1Swing koso 00:55.0 00:58.4 3317 3.317 44 210756
Digger AT 1Collect mat 01:11.2 01:24.7 26341 26.341 44 210756
Digger AT 1Digging 01:24.8 01:35.2 10394 10.394 44 210756 6
Digger AT 1Swing isi 01:35.2 01:38.2 2993 2.993 44 210756
Digger AT 1Spotting 01:38.3 01:43.8 5492 5.492 45 167798
Digger AT 1Dumping 01:43.8 01:47.6 3878 3.878 45 167798
Digger AT 1Swing koso 01:47.7 01:51.0 3319 3.319 45 167798
Digger AT 1Digging 01:51.1 02:04.8 13767 13.767 45 167798
Digger AT 1Swing isi 02:04.9 02:09.8 4925 4.925 45 167798
Digger AT 1Dumping 02:09.9 02:14.0 4038 4.038 45 167798
Digger AT 1Swing koso 02:14.0 02:18.0 3975 3.975 45 167798
Digger AT 1Digging 02:18.1 02:33.2 15093 15.093 45 167798
Digger AT 1Swing isi 02:33.5 02:38.2 4754 4.754 45 167798
Digger AT 1Dumping 02:38.5 02:42.8 4273 4.273 45 167798
Digger AT 1Swing koso 02:43.0 02:46.3 3268 3.268 45 167798
Digger AT 1Digging 02:46.3 02:58.6 12308 12.308 45 167798
Digger AT 1Swing isi 02:58.7 03:02.3 3652 3.652 45 167798
Digger AT 1Dumping 03:02.4 03:08.8 6433 6.433 45 167798
Digger AT 1Swing koso 03:08.8 03:12.1 3215 3.215 45 167798
Digger AT 1Digging 03:12.1 03:23.8 11622 11.622 45 167798
Digger AT 1Swing isi 03:23.8 03:28.9 5131 5.131 45 167798
Digger AT 1Dumping 03:28.9 03:34.4 5512 5.512 45 167798
Digger AT 1Swing koso 03:34.5 03:38.3 3810 3.81 45 167798
Digger AT 1Digging 03:38.3 03:47.8 9483 9.483 45 167798
Digger AT 1Swing isi 03:47.9 03:52.2 4249 4.249 45 167798
Digger AT 1Dumping 03:52.2 03:58.1 5874 5.874 45 167798
Digger AT 1Swing koso 03:58.1 04:02.0 3889 3.889 45 167798
Digger AT 1Digging 04:02.1 04:23.6 21550 21.55 45 167798 6
Digger AT 1Swing isi 04:23.7 04:27.9 4288 4.288 45 167798
Digger AT 1Spotting 04:28.0 04:47.1 19177 19.177 46 182221
Digger AT 1Dumping 04:47.2 04:52.0 4795 4.795 46 182221
Digger AT 1Swing koso 04:52.1 04:56.6 4459 4.459 46 182221
Digger AT 1Digging 04:56.6 05:14.4 17791 17.791 46 182221
Digger AT 1Swing isi 05:14.5 05:18.2 3659 3.659 46 182221
Digger AT 1Dumping 05:18.2 05:24.3 6092 6.092 46 182221
Digger AT 1Swing koso 05:24.3 05:28.4 4026 4.026 46 182221
Digger AT 1Digging 05:28.4 05:45.7 17342 17.342 46 182221
Digger AT 1Swing isi 05:45.8 05:51.1 5329 5.329 46 182221
Digger AT 1Dumping 05:51.2 05:56.1 4974 4.974 46 182221
Digger AT 1Swing koso 05:56.2 05:59.6 3470 3.47 46 182221
Digger AT 1Digging 05:59.6 06:13.8 14184 14.184 46 182221
Digger AT 1Swing isi 06:13.9 06:18.1 4166 4.166 46 182221
Digger AT 1Dumping 06:18.2 06:22.1 3992 3.992 46 182221
Digger AT 1Swing koso 06:22.2 06:27.0 4796 4.796 46 182221
Digger AT 1Digging 06:27.1 06:42.7 15566 15.566 46 182221
Digger AT 1Swing isi 06:42.7 06:47.6 4841 4.841 46 182221
Digger AT 1Dumping 06:47.7 06:52.4 4725 4.725 46 182221
Digger AT 1Swing koso 06:52.5 06:57.2 4682 4.682 46 182221
Digger AT 1Digging 06:57.2 07:13.8 16589 16.589 46 182221
Digger AT 1Swing isi 07:13.8 07:19.7 5889 5.889 46 182221
Digger AT 1Dumping 07:19.7 07:25.6 5831 5.831 46 182221
Digger AT 1Swing koso 07:25.7 07:31.5 5846 5.846 46 182221
Data
Bucket Count - Bucket Sum - Bucket
5 1 5
6 16 96
7 24 168
8 7 56
(empty)
Total Result 48 325
HAULER 5 Time
AR 45 1:21:16 PM 1:42:33 PM Time Average - Time
1276.00 2553.00 1277.00 (empty)
AR 47 1:26:51 PM 1:49:18 PM 1180.00 1180.00
1611.00 2958.00 1347.00 1277.00 1277.00
AR 44 1:33:49 PM 1:53:29 PM 1299.00 1299.00
2029.00 3209.00 1180.00 1347.00 1347.00
AR 43 1:36:42 PM 1:58:21 PM 1360.00 1360.00
2202.00 3501.00 1299.00 Total Result 1292.60
AR 46 1:45:40 PM 2:08:20 PM
6340 7700 1360