Welcome to the
Honda Supplier
Quality Manual
(SQM)
Choose a Language
Japanese Spanish
English
Coming Soon Coming Soon
Honda Supplier Quality Manual
Click on a button to select a manual section
Main Screen
Letter from
Table of
Cover Page Honda Forms
Management Contents
Best General Mass
Information
New Model
Practices Production
Training Reference Appendix
Supplier
HSQM
Acknowledgement
Master List of Receipt Return to Welcome Screen
Honda Supplier Quality Manual
Click on a button to select a form category
Forms
3A 5P CRF Data
Coming Soon
DSPS Inspection Lot Control and
IPPAAR/IPP
Coming Soon Fixture Traceability
MPR PFMEA PIS PPA
Styling Parts
PQCT PV Testing Guideline Tooling
(SpeCla)
Note – all forms have a blank version and most have an operation standard. Some
have numbered versions to match the operation standard. Some forms do not have a
Return to Main Screen numbered version, they have the operation standard filled in on the form.
Honda Supplier Quality Manual
Click on a button to select
3A Forms
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
5P Form
5P Operation 5P Example
5P - Blank
Standard Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
CRF Form
CRF - Blank
CRF Numbered to Match
the Operation Standard
CRF Operation
Standard
CRF Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
Data Sheets
Receiving
Inspection Data Regulation Data
Inspection Data
These are blank data sheets. There is currently no
operation standards or examples.
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
DSPS Forms
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
Inspection Fixture Forms
Inspection Fixture Inspection Fixture
Inspection Fixture
Concept Operation Concept Example
Concept - Blank
Standard Coming Soon
Inspection Fixture Inspection Fixture
Inspection Fixture
Approval Operation Approval Example
Approval - Blank
Standard Coming Soon
Gage R&R (Long
Method) - Blank
Gage R&R (Short
Method) - Blank
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
IPPAAR/IPP Forms
IPP Tag – Blank IPP Forms and Labels
IPPAAR - Blank pdf version only – this form
Order Form
must be ordered from GBS
IPPAAR Numbered to IPP Tag Numbered to View IPP Labels – must
Match the Operation Match the Operation be ordered from GBS
Standard Standard
IPPAAR Operation IPP Tag Operation
Standard Standard
IPPAAR Example IPP Tag Example
Coming Soon Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
Lot Control and Traceability Forms
LNDD Operation LNDD Example
Blank LNDD
Standard Coming Soon
Lot Control This is an example notification that Honda issues when a
Notification
part requires enhanced traceability. Various Honda plants
will have different notification forms.
Process Display PDF Operation Standard PDF Example
Form (PDF) Coming Soon Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
MPR Checksheets
Heat Injection
Casting General
Treatment Molding
Machining Painting PCB Stamping
Torque Weld Wire Harness Not Available
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
PFMEA Form
PFMEA - Blank
PFMEA Numbered to Match
the Operation Standard
PFMEA Operation
Standard
PFMEA Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
PIS Form
PIS - Blank
PIS Operation
Standard
PIS Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
PPA Form
PPA Numbered to Match
the Operation Standard
PPA Operation
Standard
PPA Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
PQCT Form
PQCT - Blank
PQCT Numbered to Match
the Operation Standard
PQCT Operation
Standard
PQCT Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
PV Testing Form
PV Testing - Blank
PV Testing Numbered to
Match the Operation
Standard (use 2nd tab)
PV Testing
Operation Standard
PV Testing Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
Styling Parts Guideline (SpeCla) Forms
Parts Appearance
Electrode Review -
Coordination Document
Blank (PACD) - Blank
PACD Numbered to Match
the Operation Standard
PACD
Operation Standard
PACD Example
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select
Tooling Forms
Tooling and Equipment – Tooling and Equipment – Tooling Summary Sheet
Sign-off Sheet Tool Release Form Blank (TSS) - Blank
Tooling and Equipment – Tool
TSS Numbered to Match
Release Form Numbered to
Match the Operation Standard the Operation Standard
Tooling and Equipment – Tool
Release Form Operation
TSS
Standard Operation Standard
Tool Trial History Tooling and Equipment – Tool
Release Form Example TSS Example
Sheet Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Best Practices
A Message to Supplier
SAP Team
Top Management
PFMEA Team PQCT Team
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a topic
General Information
Factory Guest Portal and PQTS Quality Assurance
Engineer Overview Visit
Quality Supplier Quality
Control Performance
Regulations Rating
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a topic
New Model
3A Audit Bar Code
Standard
CRF Data
Coming Soon
E-Requirements Inspection Master Sample
and E Timing Limit Sample
Fixture Design Development
NM Receiving
MPR Inspection
NMR Part Approval
Part Maturation Part Quality
Expectations Standard PFMEA PIS
PPA PQCT PV Testing SAP
Styling Parts Traceability and
Guideline (SpeCla) TPR Lot Control
Not Available
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a topic
3A Audit
3A Audit Link to 3A
Coming Soon
Procedure Audit Sheets
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Countermeasure Request Form
CRF Link to CRF
Procedure Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Data
Data Link to Data
Procedure Forms
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
E Requirements and E Timing
E-Requirements E-Timing
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Inspection Fixture Design
Link to
Inspection
Inspection
Fixture Design
Fixture Related
Guideline
Forms
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Minimum Process Requirements
Link to MPR
MPR Procedure
Checksheets
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
PFMEA
PFMEA Link to
Procedure PFMEA Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
PIS
PIS Link to PIS
Procedure Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
PPA
PPA Link to PPA
Procedure Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
PQCT
PQCT Link to PQCT
Procedure Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
PV Testing
PV Testing Link to PV
Procedure Testing Form
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Styling Parts Guideline (SpeCla)
Styling Parts
Link to SpeCla
Guideline (SpeCla)
Procedure Related Forms
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Traceability and Lot Control
Traceability and Link to Traceability
Lot Control and Lot Control
Procedure Related Forms
Return to
Return to Main Screen
New Model Screen
Honda Supplier Quality Manual
Click on a button to select a manual section
Mass Production
Controlled Electronic Sort
5P
Containment Label
Identification
Index IPPAAR/IPP
Control
Nonconforming Regular Lot
Not Available
Product Control Tag
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a topic
5P
5P Link to 5P
Procedure Form
Return to Mass
Return to Main Screen
Production Screen
Honda Supplier Quality Manual
Click on a button to select a topic
Electronic Sort Label
Electronic Link to
Sort Label Electronic Sort
Procedure Label Training
Return to Mass
Return to Main Screen
Production Screen
Honda Supplier Quality Manual
Click on a button to select
IPPAAR/IPP
Ordering IPP
IPP System Link to IPP
Related Forms
Procedure Related Forms
and Labels
Return to Mass
Return to Main Screen
Production Screen
Honda Supplier Quality Manual
Click on a button to select a manual section
Training Items
Electronic Sort
Label
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a manual section
Reference
Supplier Part
Tooling
Schedule
Return to Main Screen
Honda Supplier Quality Manual
Click on a button to select a manual section
Tooling
Tooling Release Link to Tooling
Process Related Forms
Return to Reference
Return to Main Screen
Screen
Honda Supplier Quality Manual
Click on a button to select a manual section
Appendix
Definitions
Honda Addresses
Standards
Information
Return to Main Screen