The document lists issues found with cable installations and terminations at various pump stations and zones on dates 3/4/18 and 5/4/18. Multiple entries note that cable trays or devices were not installed properly and cables were not dressed or pulled correctly at locations like pumps 4, 5, and 5150-T-007. Other issues included missing cables, secondary cables not pulled yet, and trays not installed at pump stations 6 and 8.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
48 views8 pages
5 4 18 Obstructions Issues
The document lists issues found with cable installations and terminations at various pump stations and zones on dates 3/4/18 and 5/4/18. Multiple entries note that cable trays or devices were not installed properly and cables were not dressed or pulled correctly at locations like pumps 4, 5, and 5150-T-007. Other issues included missing cables, secondary cables not pulled yet, and trays not installed at pump stations 6 and 8.