0% found this document useful (0 votes)
2K views2 pages

Syabas Standard Drawings

This document outlines 5 revisions made between 2008-2010 to the design specifications for a meter stand installation using stainless steel pipes for water meter sizes between 15mm and 40mm. The revisions removed certain components, changed material types and dimensions, added notes and tolerances, and removed smaller meter size options.

Uploaded by

cliffordtan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Syabas Standard Drawings

This document outlines 5 revisions made between 2008-2010 to the design specifications for a meter stand installation using stainless steel pipes for water meter sizes between 15mm and 40mm. The revisions removed certain components, changed material types and dimensions, added notes and tolerances, and removed smaller meter size options.

Uploaded by

cliffordtan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

REV.

REVISED BY DESCRIPTION DATE


1 HS Short piece between reducer elbow and 03 JAN. `08
stopcock removed.

HS To use SS socket after the meter


coupling on both sides of the water meter.

HS To include 5D and 3D requirement for


meter size 32mm dia. and 40mm dia.

HS Concrete slab removed.

HS To changed communication pipe from


Stainless Steel to HDPE.

HS X for 15mm dia. changed to 100mm.

Y for 15mm dia. removed.

Y for 20mm dia. and 25mm dia. changed


to 85mm.

2 HS Reintroduce concrete slab with 11 APR. `08


additional notes.

HS Additional notes on communication pipe


material for projects undertaken by
SYABAS and Developers.

3 HS To use Push Cap Lockable Valve before 5 SEPT. `08


the stopcock.

4 HS Concrete slab to be embedded 50mm in 2 MAC. `09


ground level and 25mm exposed.

V ED HS Edge of concrete slab changed to


150mm instead of 300mm.

HS Changed BRC A10 for concrete slab to

E R HS
BRC A6.

Removed fencing line.

E S HS

HS
Removed 50mm water meter size.

Removed Push Cap Lockable Valve.

T R 5
HS

WG
To changed note for communication pipe.

Detail of Transition Coupler added. 3 DEC. `10

WG Tolerances for all dimensions added.

G H WG Minimum size for stand pipe added.

WG Note for concrete slab amended.

R I WG Removed 32mm water meter size.

P Y
C O SYABAS

L L SYARIKAT BEKALAN AIR SELANGOR SDN BHD


PETI SURAT 5001,
JALAN PANTAI BAHRU,
59990, KUALA LUMPUR.
A TEL NO : 03 - 2088 5400
LAMAN WEB : www.syabas.com.my
EMAIL : [email protected]

PROJECT :

DRAWING TITLE :

METER STAND INSTALLATION (METER SIZE 15mm - 40mm)


USING STAINLESS STEEL PIPE
DRAWN BY : SHAHRUL DESIGNED : SAT

CHECKED : HS APRROVED : LPL

SCALE : NTS DATE : DECEMBER 2007

DRAWING NO:
SYA / STD / 015 / REV. 5
REV. REVISED BY DESCRIPTION DATE
1 HS Short piece between reducer elbow and 03 JAN. `08
stopcock removed.

HS To use SS socket after the meter


coupling on both sides of the water meter.

HS To include 5D and 3D requirement for


meter size 32mm dia. and 40mm dia.

HS Concrete slab removed.

To changed communication pipe from


HS Stainless Steel to HDPE.

HS X for 15mm dia. changed to 100mm.

HS Y for 15mm dia. removed.

HS Y for 20mm dia. and 25mm dia. changed


to 85mm.

2 HS Reintroduce concrete slab with 11 APR. `08


additional notes.

HS Additional notes on communication pipe


material for projects undertaken by
SYABAS and Developers.

3 HS To use Push Cap Lockable Valve before 5 SEPT. `08

E D 4 HS
the stopcock.

Concrete slab to be embedded 50mm in 2 MAC. `09


ground level and 25mm exposed.

RV HS Edge of concrete slab changed to


150mm instead of 300mm.

HS Changed BRC A10 for concrete slab to


BRC A6.

E SE HS Removed fencing line.

R HS Removed 50mm water meter size.

HS Removed Push Cap Lockable Valve.

H T 5
HS

WG
To changed note for communication pipe.

Detail of Transition Coupler added. 3 DEC. `10

WG Tolerances for all dimensions added.

I G WG Minimum size for stand pipe added.

R WG

WG
Note for concrete slab amended.

Removed 32mm water meter size.

P Y
C O
LL SYABAS

A SYARIKAT BEKALAN AIR SELANGOR SDN BHD


PETI SURAT 5001,
JALAN PANTAI BAHRU,
59990, KUALA LUMPUR.
TEL NO : 03 - 2088 5400
LAMAN WEB : www.syabas.com.my
EMAIL : [email protected]

PROJECT :

DRAWING TITLE :
METER STAND INSTALLATION (PIPE 15mm - 40mm)
USING STAINLESS STEEL TUBE

DRAWN BY : SHAHRUL DESIGNED : YHH

CHECKED : HS APRROVED : LPL

SCALE : NTS DATE : AUGUST 2007

DRAWING NO:
SYA / STD / 015A / REV. 5

You might also like