This document provides instructions for setting up batch determination in SAP. It outlines the steps to create condition tables, search strategies, search procedures, and assign these to order types. It also describes creating the necessary master data like materials, BOMs, work centers, routings, and production versions. Steps for creating batch search strategies, selection classes, and sort rules are covered. The document concludes with instructions for creating a production order and releasing it to trigger automatic batch determination of components.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
93 views
Configuration Data For Batch Determination
This document provides instructions for setting up batch determination in SAP. It outlines the steps to create condition tables, search strategies, search procedures, and assign these to order types. It also describes creating the necessary master data like materials, BOMs, work centers, routings, and production versions. Steps for creating batch search strategies, selection classes, and sort rules are covered. The document concludes with instructions for creating a production order and releasing it to trigger automatic batch determination of components.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 22
Configuration data for Batch Determination
Create the Condition Table(T Code : OPLD)
SPRO>> Logistic General >> Batch Management >> Batch Determination & Check>>Condition tables>> Define Production Order Condition Tables
Define Access Sequence
Create the Search Strategy
In the Search Strategy, assign the Access Sequence defined above & if required, the Selection Class & Sort sequence Create the Search Procedure (T Code: OPLG) Search Procedure in linked with the Strategy Type(s), defined in the above step
Assign Search Procedure in Order Type Dependent
parameters ( T Code: OPL8) **** **** *****
Create PP Master Data
Create all the necessary PP Master Data. Ref. the below Master data used in this scenario Finished Material: FG2-BATCH Component Material: RM2-BATCH BOM: 00000287 Work Center: MACHINE1 Routing: 50000055 Production Version: V001 With the Organizational Data >>> Plant: 1010 & Storage Locations: 101A & 101B Create the material Master for the Header Material as well as for all the components required to produce the Header Material using the Transaction Code: MM01 Note: For all the Batch managed component Materials, you need to make sure
1. Classification view is maintained with the Class Type: 023
2. Class is assigned
3. Characteristics are maintained &
4. Batch Management is activated (For Header Material, its Optional)
Material Master of the Header Material # FG2-BATCH
Material Master of the Component Material # RM2-BATCH Create the BOM, for the Header Material # FG2-BATCH, using the T Code: CS01. With one Component # RM2-BATCH, which is Batch managed material (As Example) Cr eate the Work Center using the T Code: CR01 Create the Routing for the Header Material using the T Code: CA01 Create the Production Version for the Header Material(Ex: FG2-BATCH) T Code: MM02/C223 Create Batch Determination Master Data Create the Batch Search Strategy using the T Code: COB1 Search Strategy contains the Selection Criteria & Sort Rule to be followed Selection Class can be created using the T Code: BMC1/CL02 Please keep it in mind, at least one of the Characteristics of this Selection Class should be the same with the Classification of Characteristics in the Material Master & also maintain the Value for at least one or more characteristics in the Selection Class (As shown below)
Sort Rule can be created using the T Code: CU70
Transaction data Create the Production Order using the T Code: CO01 Production Order: 1003102, Created >>> As of now, no batch number is assigned for the Header Material & also for the component Once, the Order is Release, System will assign the Batch Number for the Header Material (As per Production Order Scheduling Profile settings maintained) Release the Production Order using the T Code: CO02 Batch Determination of the Components using T Code: CO02 Select the Line Item, for which Batch Determination to be done & & Click on Batch Determination Icon Then in the Next Screen, System will pull up all the Batches which meets the Selection Criteria. Also, selected batches are sorted as per the Sort Rule maintained Confirmation of Prod. Order using the T Code: CO15/CO11N Goods Receipt of Production Order using the T Code: MIGO Stock updated in the respective Storage location
Automatics Batch Determination
For this functionality of automatic Batch Determination of the Component Materials in the Production Order, need to maintain for the Batch Managed Component(s), in the Material Master, in MRP 2 View, with the Batch Entry Option =3. Rest of the above settings remains the same. With this setting, System assigns the Batch Number automatically, for the Component Material, during the Release of the Production Order ***** ***** ***** ***** ***** ** Kindly advice for any further improvements/changes, which makes it, as the most useful document