Feasibility Study Format
Feasibility Study Format
1. Title Page
2. Endorsement and Approval Sheet
3. Acknowledgment
4. Table of Contents (from title page to bibliography)
5. List of tables (if applicable)
6. Appendices on statistics (summary)
7. List of figures (pictures)
8. Appendices on graphs (summary)
9. Introduction
10. Product/Company Logo (below is: A FEASIBILITY STUDY ON AQUASCAPE)
H. Project Summary
H.1 Market Summary
*Hypothesis on projections of demand, supply, and sales of the study.
*Factors affecting the hypothesis
H.2 Technical Summary
*Offered products
H.3 Management Summary
*Type of Business, nature of business
*Officers? Employees?
H.4 Operational Terms (Definition of Terms)
A. Demand
A.1 Past Demand (5 years)
A.1.1 For the industry
*If no statistical data provided by the NSO or DTI, compute for the annual demand for the
last five (5) years.
A.1.2 For every product?
B. Supply
B.1 Past Supply
B.1.1 For the industry
B.1.2 For every product
E. Marketing Strategies
E.1 Product Strategies
E.2 Place Strategies
E.3 Pricing Strategies
E.4 Promotion (Poster, flyers, commercial, website, gift certificates, discount coupon
F. SWOT Analysis
*analyzing the technical feasibility of the study. to determine to what extent the project meets the
technical soundness criteria
A. Stating: quantity and quality of the service, specification of raw materials, supplies to be used, labor
needed, utilities needed, waste disposal methods, transportation necessary, plant location, plant size
and layout, machinery and equipment, etc.)
*Objectives
A. Product Description
A.1 Product Pricing (Service Pricing)
A.2 Procedure / Process
A.3 Time Motion Study
C. Business Location
C.1 Vicinity Map
C.2 Floor Plan (separating the counter area and work station)
-this comes with function of every asset, quantity, unit cost, and total cost
D. Machineries and Equipment
E. Supplies
F. Furniture and Fixtures
H. Uniforms? And at what cost?
I. Utilities Requirements
I.1 Electricity
I.2 Water Supply
I.3 Telecommunications
I.4 LPG? Generator? Water Tank?
J. Waste Disposal Method
K. Direct Labor Requirements (staff? manager?)
K.1 Work Schedule
*brief intro
*objectives
A. Form of Ownership
B. Vision, Mission, Core Values
C. Capitalization
D. Organizational Chart
E. Manpower Requirements (with Job Description and Job Specification)
F. Employment Process
G. Legal Requirements
H. Organizational Policies and Procedures
H.1 Employment (include Employment Requirements)
H.2 Classification of Employees
H.3 Orientations and Seminars
H.4 Personal Records
H.5 Contracts of Employment
H.6 Work Schedule
H.7 Tune Keeping
H.8 Attendance and Punctuality
H.9 Personnel Movement and Performance Evaluation
H.10 Separation from Service (Resignation, Termination)
H.11 Compensation and Benefits
I. Code of Ethics
I.1 Hygiene and Sanitation
I.2 Arrival and Departure of Employees
I.3 Procedure for Notices/Bulletin Board
I.4 Notice of Disciplinary Action
I.5 Code of Conduct
J. Project Schedule Gantt Chart
Chapter 5 (Financial Study)
*brief intro
*objectives
*major assumptions
*insert FS for a period of 5 years (2018-2023)
*insert (part 1) financial ratios (liquidity ratios, solvency ratios, profitability ratios)
*insert (part 2) economic evaluation (payback period)
*brief intro
*objectives
A. Socio-Economic Contributions
A.1 Contribution to the Philippine Economy
A.2 Employment Generation
A.3 Environment Conservation
APPENDICES
FEASIBILITY FINDINGS
--END--