Scope of Works and Cost Estimates: Architect/Civil Engineer Owner

The document provides a bill of materials and cost estimates for a proposed two-storey residential building. It includes 15 sections that outline materials, quantities, and costs for siteworks, concrete works, masonry, scaffolding, doors and windows, stairs, ceilings, tiles, wall finishes, cabinets, and other items. The total project cost is estimated to be 3.94 million Philippine pesos.

Uploaded by

Shiela Marquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Scope of Works and Cost Estimates: Architect/Civil Engineer Owner

The document provides a bill of materials and cost estimates for a proposed two-storey residential building. It includes 15 sections that outline materials, quantities, and costs for siteworks, concrete works, masonry, scaffolding, doors and windows, stairs, ceilings, tiles, wall finishes, cabinets, and other items. The total project cost is estimated to be 3.94 million Philippine pesos.

Uploaded by

Shiela Marquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Proposed: TWO-STOREY RESIDENTIAL BLDG.

Location:

SCOPE OF WORKS AND COST ESTIMATES


Work Item Materials Cost Labor Cost

I. Siteworks & Mobilization Php 75,953.00 Php


II. Concreteworks & Reinforcements
1. Foundation, Beams, Stirrups,L 332,029.75
2. 1st floor and 2nd floor slab 243,077.63
III. Masonry & Plastering Works 268,445.00
IV. Scaffolding & Formworks 119,792.00
V. Electrical Rough Works 36,448.00
VI. Plumbing Rough Works 18,995.00
VII. Septic Vault & Catch Basin 5,600.00 __________________________
Structural Materials Total Php 1,100,340.38 Labor Cost
_______________________________________________________________________________________________________
Structural Labor & Materials Cost Php
Equipment Rentals & Contingiencies
Plans, Permits, Supervision Fees
PART 1 TOTAL Php

PART 2, Finishing Works :


VIII. Doors & Windows 215,550.00 754,425.00
IX. Stair & Railings 26,291.00 9,201.85
X. Ceiling Works 52,500.00 18,375.00
XI. Tileworks & Floor Finishes 112,326.00 39,314.00
XII. Wall Finish & Precast 24,030.00 8,401.00
XIII. Cabinets Carpentry Works 102,660.00 35,390.00
XIV. Painting Works 564,450.58 59,448.00
XV. Electrical Fixtures Works 218,776.00 76,571.78
XVI. Plumbing Fixtures Works ________ 169,301.00 59,255.35
Finishing Materials Total Php 1,247,207.60 1,060,381.98

Finishing Labor & Material Cost Php


Plans, Permits, Supervisions Fees
PART 2 TOTAL
Area 72+76+8 = 156 sqm TOTAL PROJECT COST Php

Prepared by:
Conforme:
Architect/Civil Engineer
Domingo L. Gamba PRC No: ____________
Owner PTR No: _________ Iss On: ________ At: __
Date:
ATES
Labor Cost

26,583.55

116,210.41
85,077.17
93,955.75
32,884.51
11,509.58
7,598.00
________________ 2659.3
Php 376,478.27
____________________________________
1,476,818.65
72,542.24
48,361.49
1,597,722.38

2,307,589.58
36,650.78
2,344,240.36
Php 3,941,962.74

rchitect/Civil Engineer
PRC No: ____________
______ Iss On: ________ At: ______
Proposed: TWO-STOREY RESIDENTIAL BLDG.
Location:
Owner: Domingo L. Gamba
BILL OF MATERIALS & COST ESTIMATES
Materials Qty Units Unit Cost

I. Siteworks & Mobilization:


Site Clearing 389.5
Excavation Works 292.13

Labor Cost(35%)

II. Concrete Works & Rebars:

1. Foundation, Beams, Stirrups,Lateral ties and Columns: Vol. = 40.78 cuM


Pozzolan Cement 301 bags at Php
Mayon Sand 20.39 cuM
Washed Gravel 40.78 cuM
20 ømm x 7.5m Steel Bars 247 pcs
20 ømm x 6m Steel Bars 13 pcs
16 ømm x 6 m Steel Bars 77 pcs
10 ømm x 7.5 Steel Bars 190 pcs
10 ø mm x 6 Steel Bars 352
Powermix Admixture 7 bags
Tie Wire #16 22 kg
Materials Total
Labor Cost

2. 1st floor and 2nd floor slab Voll.= 132.253


Pozzolan Cement 794 bags at Php
Mayon Sand 66.13 cuM
Crushed Gravel 132.253 cuM
10 ø mm x 6 Steel Bars 352 pcs
Tie Wire # 16 2 kg
Materials Total

III. Masonry & Plaster Works:

Pozzolan Cement 455 bags at Php


Mayon Sand 45 cuM
Washed Gravel 82 cuM
20mmø x 6M Steel Bars 208 pcs
Tie Wire # 16 5 kls
6" CHB, Mach. Pressed 4,575 pcs
Materials Total
IV. Scaffolding & Formworks:
(Reusable for 2 Floors)

Plywood, Marine 1/4" 152 pcs at Php


2 x 3 x 12' Coco Lumber 649 pcs
3" C.W. Nails 4 kg
Tie Wire #16 6 kls
Materials Total

V. Doors & Windows

Narra Panel Door with 2.5 x 1 1 units


PVC Polish T&B Door 2.3 x 1 4 units
Narra Panel Door with 2. 3 x 1 3 units
Sliding Glass Door 2.5 x 1 3 units
Sliding Glass Door 2.5 x 2 2 units
Door Locksets Lever Set 13 units
Alum Fixed Window with One way 1
Alum Fixed Window with One way 2
Alum Fixed Window with One way 1
Alum. Sliding Window with Smoke 3
Alum. Awning Window 1
Alum. Awning Window 4
Alum. Awning Window 1
Alum. Awning Window 1
Alum. Awning Window 1
Materials Total

VI. Stairs, & Porch Railings


DesignCraft Stair Railin 3 pcs
Porch/Terrace railings 20.6 sqM
NZ Wood Stair Tread 16 Pcs
Materials Total

VII. Ceiling Works:


Plywood, Marine 1/4" thk 72 pcs at Php
2 x 2 x 10' S2s Lumber 30 pcs
1 1/2 x 2 x 10' S2s Lumber 120 pcs
1 x 4 x 8' T&G s4s Plank 30 pcs
Solignum, Misc. Hardwares lumpsum
Materials Total

VIII. Tileworks & Floor Finishes:


800mm x 800mm Polish Porcelain 127 pcs
600mmx600mm Weave Cream 174 pcs
300mm x 300mm T&B Mariwasa Cl 578 pcs
Materials Total

IX. Wall Finishing & Precast Moldings:


Canyon Quick Fit 200mmx300mm 4 box
MLDG PVC Decowood 3m 25 pc
Materials Total
Labor Cost
TOTAL
X. Cabinet & Furniture Works:
Kitchen Counter King Brand 3 Pcs
Kitchen Hanging Cabinet King Bra 6 Pcs
Kitchen Hanging Cabinet King Bran 3
Bedroom Closets 3
Materials Total

XI. Painting Works of Ext. & Int. Walls, Ceiling & Fixtures
Davies Primer 52 gal
Davies Flat 52 gal
Ext. Wall Semi-Gloss Latex 52 gal
Int. Wall Semi-Gloss Latex 52 gal
1st Flr. Ceiling Flatwall 52 gal
2nd Flr. Ceiling Flatwall 52 gal
Mix Color 52 gal
Roof Shield 52 gal
Door & Wood Varnishing
Thinners, Tints & Hardwares lumpsum
Materials Total

XII. Electrical Fixtures & Works:


1. Electrical Fixtures & Accessories:
Hanging Lamp Crystal A 2 sets
Wall Lamp Alladin Brand 15 sets
Wall Lamp Masters Bed 2 sets
Ceiling Lamp Pin Light 51 sets
Apollo Brand Dining Area 1 sets
Hanging Lamp l Apollo Brand stair 1 sets
Apollo Brand Bedrooms 3 sets
Switches, Single 3 sets
Switches, 2-gang 8 sets
Switches, 3-gang 4 sets
Conv. Outlets,Duplex, R 28 sets
Aircon, range Outlet 6 sets
30A Circuit Breaker 1 pairs
20A Circuit Breaker 4 pairs
15A Circuit Breaker 7 pairs
Materials Total

2. Electrical Rough Works:


10-Branch-Ckt Brkr Panel 1 set
14.0 mm sq. THHN Wire 60 mtr
8.0 mm sq. THHN Wire 60 mtr
5.5 mm sq. THHN Wirw 2 rolls
3.5 mm sq. TW Wire 2 rolls
2.0 mm sq. TW Wire 3 rolls
PVC Junction & Utility Boxes Sher 86 pcs
PVC Pipe & Moldflex lumpsum
Fittings, Tapes & Hardwares lumpsum
Materials Total

XIII. Plumbing Fixture & Works:


Water Closet, HCG 3 set at Php
Shower Set Creston 3 sets
Lavatory ShangRila 3 sets
Stainless Sink TEKA 1 set
Faucet Cres Gooseneck 1 sets
Faucet LAFONZA 2 sets
Bathub HCG jupiter Set 3 sets
Floor Drain 2 sets
Roof Drain, Stainless 8 sets

2. Plumbing Rough Works:


Gate Valves 1/2"ø 4 pcs at Php
4"ø PVC Pipes S500 3 pcs
4"ø PVC Storm S300 7 pcs
3"ø PVC Pipes S500 18 pcs
3"ø PVC Pipes S300 4 pcs
2"ø PVC Pipes S500 5 pcs
8"ø x 3' Conc. Pipes 6 pcs
1/2"ø G.I. Pipes, s40 7 pcs
PVC & GIP Fittings, Ass lumpsum
Vulcaseal, misc. & Hardwares lumpsum
Materials Total

XIV. Septic Vault


Septic Vault CHB & Agg 1 set lumpsum
Cement & Rebars lumpsum
Materials Total
Labor Cost
L BLDG.

STIMATES
Unit Cost Amount

120 ₱ 46,740.00
100 ₱ 29,213.00
TOTAL: ₱ 75,953.00
Labor Cost(35%) ₱ 26,583.55
TOTAL: ₱ 102,536.55

220.00 ₱ 66,220.00
275.00 ₱ 5,607.25
375.00 ₱ 15,292.50
550.00 ₱ 135,850.00
440.00 ₱ 5,720.00
300.00 ₱ 23,100.00
140.00 ₱ 26,600.00
135.00 ₱ 47,520.00
670.00 ₱ 4,690.00
65.00 ₱ 1,430.00
Materials Total ₱ 332,029.75
Labor Cost ₱ 116,210.41
TOTAL ₱ 448,240.16

220.00 ₱ 174,680.00
275.00 ₱ 18,185.75
375.00 ₱ 49,594.88
135.00 ₱ 487.00
65.00 ₱ 130.00
Materials Total ₱ 243,077.63
Labor Cost ₱ 85,077.17
TOTAL ₱ 328,154.79

220.00 ₱ 100,100.00
275.00 ₱ 12,375.00
375.00 ₱ 30,750.00
440.00 ₱ 91,520.00
65.00 ₱ 325.00
10.00 ₱ 45,750.00
Materials Total ₱ 268,445.00
Labor Cost ₱ 93,955.75
TOTAL: ₱ 362,400.75
400.00 ₱ 60,800.00
90.00 ₱ 58,410.00
48.00 ₱ 192.00
65.00 ₱ 390.00
Materials Total ₱ 119,792.00
Labor Cost ₱ 41,927.20
TOTAL ₱ 161,719.20

20,000.00 ₱ 20,000.00
2,800.00 ₱ 11,200.00
25,000.00 ₱ 75,000.00
8,400.00 ₱ 25,200.00
10,000.00 ₱ 20,000.00
350.00 ₱ 4,550.00
8,000.00 ₱ 8,000.00
10,000.00 ₱ 20,000.00
9,000.00 ₱ 9,000.00
1,500.00 ₱ 4,500.00
2,300.00 ₱ 2,300.00
2,000.00 ₱ 8,000.00
2,300.00 ₱ 2,300.00
3,000.00 ₱ 3,000.00
2,500.00 ₱ 2,500.00
Materials Total ₱ 215,550.00
Labor Cost ₱ 75,442.50
TOTAL ₱ 290,992.50

357.00 ₱ 1,071.00
700.00 ₱ 14,420.00
675 ₱ 10,800.00
Materials Total ₱ 26,291.00
Labor Cost ₱ 9,201.85
TOTAL ₱ 35,492.85

400.00 ₱ 28,800.00
120.00 ₱ 3,600.00
100.00 ₱ 12,000.00
150.00 ₱ 4,500.00
₱ 3,600.00
Materials Total ₱ 52,500.00
Labor Cost ₱ 18,375.00
TOTAL ₱ 70,875.00

490.00 ₱ 62,230.00
165.00 ₱ 28,710.00
37.00 ₱ 21,386.00
Materials Total ₱ 112,326.00
Labor Cost ₱ 39,314.10
TOTAL ₱ 151,640.10

3400 ₱ 13,600.00
417.20 ₱ 10,430.00
₱ 24,030.00
₱ 8,410.50
₱ 32,440.50

13970 ₱ 41,910.00
4890 ₱ 29,340.00
5270 ₱ 15,810.00
5200 ₱ 15,600.00
Materials Total ₱ 102,660.00
Labor Cost ₱ 35,931.00
TOTAL ₱ 138,591.00

771.3 ₱ 40,107.60
501.6 ₱ 26,083.20
592.5 ₱ 30,810.00
592.5 ₱ 30,810.00
550 ₱ 28,600.00
550 ₱ 28,600.00
593.75 ₱ 30,875.00
865.15 ₱ 44,987.80
₱ 3,000.00
₱ 4,000.00
Materials Total ₱ 267,873.60
Labor Cost ₱ 93,755.76
TOTAL ₱ 564,450.58

₱ 58,888.00 ₱ 117,776.00
₱ 465.00 ₱ 6,975.00
₱ 1,299.75 ₱ 2,599.50
₱ 465.00 ₱ 23,715.00
₱ 4,200.00 ₱ 4,200.00
₱ 3,999.00 ₱ 3,999.00
₱ 8,800.00 ₱ 26,400.00
₱ 60.00 ₱ 180.00
₱ 96.00 ₱ 768.00
₱ 132.00 ₱ 528.00
₱ 120.00 ₱ 3,360.00
₱ 220.00 ₱ 1,320.00
₱ 289.75 ₱ 289.75
₱ 230.75 ₱ 923.00
₱ 289.75 ₱ 2,028.25
Materials Total ₱ 218,776.50
Labor Cost ₱ 76,571.78
TOTAL ₱ 295,348.28

1,200.00 ₱ 1,200.00
52.00 ₱ 3,120.00
36.00 ₱ 2,160.00
3,600.00 ₱ 7,200.00
3,100.00 ₱ 6,200.00
2,400.00 ₱ 7,200.00
28.00 ₱ 2,408.00
₱ 4,000.00
₱ 3,000.00
Materials Total ₱ 36,488.00
Labor Cost ₱ 12,770.80
TOTAL ₱ 49,258.80

10,299.00 ₱ 30,897.00
12,000.00 ₱ 36,000.00
15,399.00 ₱ 46,197.00
3,900.00 ₱ 3,900.00
1,250.00 ₱ 1,250.00
575.00 ₱ 1,150.00
16,049.00 ₱ 48,147.00
40.00 ₱ 80.00
210.00 ₱ 1,680.00
Fixtures Total ₱ 169,301.00
Labor Cost ₱ 59,255.35
TOTAL ₱ 228,556.35

180.00 ₱ 720.00
360.00 ₱ 1,080.00
275.00 ₱ 1,925.00
280.00 ₱ 5,040.00
160.00 ₱ 640.00
138.00 ₱ 690.00
180.00 ₱ 1,080.00
360.00 ₱ 2,520.00
₱ 2,600.00
₱ 2,700.00
Materials Total ₱ 18,995.00
Labor Cost ₱ 7,598.00
TOTAL ₱ 26,593.00
₱ 2,000.00
₱ 3,600.00
₱ 5,600.00
₱ 1,960.00