Power Grid Corporation of India Limited C.I.P Clearence / Interim Inspection
Power Grid Corporation of India Limited C.I.P Clearence / Interim Inspection
A
C.I.P CLEARENCE / INTERIM INSPECTION
8000031148 REPORT
May 25, 2018 CALL ID : 2018050155 / May 3, 2018
Concluded as Acceptable and authorized for Despatch
Part 1
PO Line UM Qty
Inspection Report UM Qty Qty
Item ID Item Name Item (Com. Cumm
ID (PO) Offered Accepted
Qty Mat) Accept
890000272943 1000020377 SURGE ARRESTER ZNO 9KV, 5KA PORCELAIN EA 2466.000 1500.00 1500.00 1500.00
0 0 0
Part 2
TEST RESULTS MEET THE REQUIREMENT. 9KV 5KA LA SL.NOS. B2861-B4360 CLEARED
ACCEPTANCE TESTS WITNESSED AS PER DRG./TS/MQP.TEST REPORT ATTACHED.
FOR DISPATCH.